Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹17.0 L
EMD Value
₹25,000
Closing Date
12 Aug 2024, 10:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Directorate of Municipal Administration
Asha
Improvement to road near Giryappa house near Airtel tower park 16th ward and Improvement to road near Sadna boyite house 8 kolayi 17th ward in sandur TMC Limits
DMA/2024-25/RD/WORK_INDENT23848
DMA/2024-25/RD/WORK_INDENT23848
Reserved
Roads
Two Tender Document System(Two Cover)
DMA Town Municipal Council Sanduru
5 documents required · 5 mandatory
To qualify for award of this contract satisfactory completed as prime contractor (25% of the cost of the work), at least one Construction work such as Rs. 5.04 lakhs
To qualify for award of this contract, each tenderer in its name should have in the last five years achieved in at least one financial year an average annual financial turnover of Rs 20.15 lakhs (Certified by CA)
Liquid assets and/or availability of credit facilities of not less than Rs.6.05 lakhs
contractor Registration certificate should be in the related business as detailed in the Scope of Work from KPWD
Reserved category certificate
₹500
₹25,000
4 Aug 2024
4 Aug 2024
13 Aug 2024
9 Aug 2024
Improvement to road near Giryappa house near Airtel tower park 16th ward and Improvement to road near Sadna boyite house 8 kolayi 17th ward in sandur TMC Limits
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak p...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, rrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50...
Rates of Formwork Shall be Added on percentage basis to finished concrete Item rate ForVarious Work Addendum I Percentage Additionalities for Formwork,Centering & Scaffolding Earth retaining structur...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Mechanical Means:
Mechanical Means: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not ...
Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading...
Granular Sub-Base A Plant Mix Method: Construction of Granular Sub-Base of required grading asper design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
Wet Mix Macadam (Plant mix method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical...
Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential S...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, rrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50...
Rates of Formwork Shall be Added on percentage basis to finished concrete Item rate ForVarious Work Addendum I Percentage Additionalities for Formwork,Centering & Scaffolding Earth retaining structu...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Mechanical Means:
Mechanical Means: Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not ...
Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading...
Granular Sub-Base A Plant Mix Method: Construction of Granular Sub-Base of required grading asper design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
Wet Mix Macadam (Plant mix method): Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW2 20.15 L (SC) P2.doc
Tender Document • 0.36 MB
Reservation 2024-25 tender.pdf
Others - Reservation Details • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .