| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 CrAccepted-AOC 402 3RD FLOOR DEV PALACE M G ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | ₹34.0 Cr Quoted ₹34.5 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹35.5 Cr+₹96.3 L (2.79%)Rejected-Finance | ₹35.5 Cr+₹96.3 L (2.79%) | L2 | Rejected-Finance High Quoted |
| 3 | L3₹36.1 Cr+₹1.6 Cr (4.77%)Rejected-Finance NO 5 8 KANKATTI ALA PERIYAKUTTY MADUVU POST VAZHAPPADI TALUK SALEM 636101 | SALEM | SALEM | TAMIL NADU | 636101 | ₹36.1 Cr+₹1.6 Cr (4.77%) | L3 | Rejected-Finance High Quoted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not complied with prequalification |
Tender Value
₹34.0 Cr
EMD Value
₹17.2 L
Closing Date
17 Feb 2026, 11:00 amClosed
Superintending Engineer
Office of the Superintending Engineer Highways C and M Tirunelveli AR Line Road Palayamkottai
Widening from Two Lane to Four lane and Strengthening at of Srivilliputhur Sivakasi Virudhunagar Aruppukottai Thiruchuli Narikudi Parthibanur road including Reconstruction Widening of CD works Construction of Toe wall Retaining wall, Breast wal
2026_HWAY_652452_1
T N No. 43 2025-226 HDO Dated 03 02 2026
Open Tender
Civil Works - Highways
Percentage
360 days
Aruppukottai
Average Annual Turnover
Completed Contracts
Minimum quantities of works in 1yr during the last 5yrs
Personnel capabilities
Equipment capabilities
Financial position
Audited balance sheet for the last 5yrs
Litigation history
Bid capacity
9 documents required · 9 mandatory
₹0
₹17.2 L
23 Mar 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
17 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Picking 5cm to 10cm old metalled surface and sectioning 1Sqm
Picking the existing BT surface upto 50mm depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed of the work and including all other incidental charges etc., | - | - | - | - |
| 2 | Road A | - | Square meter | 23.36 | - |
| 3 | Earthwork excavation in all classes of soils except hard rock requiring blasting, and depositing on bank with all leads and lifts as per SS20B; including cost of all labour charges, materials, tools, equipment and all incidental charges; including compacting with power roller, watering; including all hire and fuel charges for all tools and plants; removal of other deleterious matter and obstructions; trimming of bottom of excavation; backfilling; clearing up the site and disposal of all surplus materials etc., complete as per standard specification. a) Box cutting for widening portion | - | - | - | - |
| 4 | Road A | - | Cubic Metre | 131.89 | - |
| 5 | Road A (Branch Road Improvements) | - | Cubic Metre | 131.89 | - |
| 6 | Providing compaction of berms using the box cut earth including all hire and fuel charges for power roller for compaction,water sprinkler,including all labour charges for laying spreading, watering etc., complete as directed by the departmental engineers for making up of low berms | - | - | - | - |
| 7 | Road A | - | Cubic Metre | 28.17 | - |
| 8 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with vibratory soil compactor, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment / sub grade | - | - | - | - |
| 9 | Road A | - | Cubic Metre | 545.03 | - |
| 10 | Granular Sub-base- Providing, laying, spreading and compacting graded stone aggregates for Granular Sub Base, including premixing the materials with water at OMC in mechanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base course on well-prepared surface and compacting with vibratory roller to achieve the desired density; including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 406 of MORTH Rev-5.-for grading- V Material | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_782320.xls
BOQ • 0.63 MB
PQ.pdf
Additional Documents • 0.39 MB
PB.pdf
Tender Documents • 0.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .