Loading…
Loading…
Tender Value
₹25.0 L
EMD Value
₹50,000
Closing Date
8 Aug 2026, 3:00 pmClosed
VIMAL KUMAR
Executive Officer
NAGAR PARISHAD DEHRI-DALMIANAGAR
VIMAL KUMAR
Executive Officer
Construction of RCC Drain from Ambika Prasad house to Lal Bangala bhathi via Dilip Gupta house in ward no. 10
137105
NIT 04/2026-27/Gr-11
Open Tender
CIVIL
Rohtas
• Name of the Bidder
• Name of the Firm/Company
• Address of Firm/Company
• PAN Number
• GSTIN
• Registration Certificate No.
• Contacts Details
• Email ID
CIVIL
PERCENTAGE
L1
1
9 documents required · 9 mandatory
₹5,000
Processing Fee: 1180
₹50,000
SAMARAT ASHOK BHAWAN NAGAR PARISHAD CAMPUS
28 Jul 2026
28 Jul 2026
9 Aug 2026
29 Jul 2026
8 Aug 2026
29 Jul 2026
30 Jul 2026
Construction of RCC Drain from Ambika Prasad house to Lal Bangala bhathi via Dilip Gupta house in ward no. 10
ESTIMATED COST :- 2497700
EARNEST MONEY :- 50000
COST OF B.O.Q. :- 5000
BID PROCESSING FEE :- As Per Eproc
TIME OF COMPLITION :- 04 Month
Sl. No. Name of Items Units Quantity Rate
In Figure In Words Amount
1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Per M3 135.7 360.7 Three Hundred Sixty Rupees and Seventy Paisa Only 48947
2 Dismantling of Brick Work…………..Do…………….. Per M3 9 823.7 Eight Hundred Twenty Three Rupees And Seventy Paisa Only 7413
3 Dismantling of Concrete Work…………..Do……………. Per M3 2.7 970.9 Nine Hundred Seventy Rupees And Ninety Paisa Only 2621
4 Supplying and Filling in plinth with local sand and under floors including, watering , ramming consolidating and dressing complete. Per M3 16.3 287.3 Two Hundred Eighty Seven Rupees And Thirty Paisa Only 4683
5 Providing designation 100 A one brick flat soling joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/l, Per M2 163 283.3 Two Hundred Eighty Three Rupees And Thirty Paisa Only 46178
6 Providing and laying in position Cement concrete of………..E/…….. Per M3 109.82 4649 Four Thousand Six Hundred Forty Nine Rupees And Zero Paisa Only 595049
7 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of Centring ,shuttering, finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size) Per M3 70.52 5670 Five Thousand Six Hundred Seventy Rupees And Zero Paisa Only 399820
8 Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars TMTC-500-10mm dia. Per Kg 4936.05 92.60.00 Ninety Two Rupees and Sixty Paisa Only 457078
9 Centring and shuttering including strutting, propping etc. and removal of form for.Foundations, footings, bases of columns etc. for mass concrete. Per M2 124.2 211.6 Two Hundred Eleven Rupees and Sixty Paisa Only 26281
10 Centring and shuttering including strutting, propping etc. and removal of form for.Foundations, footings, bases of columns etc. for mass concrete. Per M2 379.2 211.6 Two Hundred Eleven Rupees and Sixty Paisa Only 80239
11 Centring and shuttering including strutting, propping etc. and removal of form for.Suspended floors, roofs, landings, balconies and access platform with water proofply 12 mm thick. Per M2 163 437.5 Four Hundred Thirty Seven Rupees & Fifty Paisa Only 71313
12 CARRIAGE OF MATERIAL
(i) BRICKS %O 2762 1367.69 One Thousand Three Hundred Sixty Seven Rupees And Sixty Nine Paisa Only 3777
(ii) LOCAL SAND - M3 18.61 310.46 Three Hundred Ten Rupees And Forty Six Paisa Only 5778
(iii) COURSE SAND M3 77.54 727.5 Seven Hundred Twenty Seven Rupees And Fifty Paisa Only 56410
(iv) STONE CHIPS M3 155.08 2591.81 Two Thousand Five Hundred Ninety One Rupees And Eighty One Paisa Only 401938
(v) CEMENT+Steel MT 70.49 1169.04 One Thousand One Hundred Sixty Nine Rupees And Four Paisa Only 82401
(vi) Earth Disposel MT 110.55 276.04 Two Hundred Seventy Six Rupees And Four Paisa Only 30516
(vii) Carrege of Material by Manual Labor EACH 7 395 Three Hundred Ninty Five Rupees And Zero Paisa Only 2765
Different Cost of Materials (i) Cement Bags 1311 30.79 Thirty Rupees And Seventy Nine Paisa Only 40366
(ii) Bricks %O 2762 270.13 Two Hundred Seventy Rupees And Twenty Three Paisa Only 746
Less Cost of bricks %O 2500 4852 -12130
13 SIAGNIORANG FEE 13910
14 SIGNBOARD AND PHOTO EACH 1 4500 4500
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Nit 04-2026-27.pdf
NIT • 2.88 MB
Nit 04-2026-27.pdf
NIT • 2.88 MB
GR 11.xls
NIT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .