| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 CrAccepted-AOC KH NO 17 B H U NO 74A KAUSHALPURI COLONY KHARGAPUR GOMTINAGAR LUCKNOW U P | ₹8.6 Cr | L1 | Accepted-AOC AS PER UPLOADED |
| 2 | L2₹9.0 CrRejected-Finance | ₹9.0 Cr | L2 | Rejected-Finance AS PER UPLOADED |
| 3 | L3₹9.1 CrRejected-Finance | ₹9.1 Cr | L3 | Rejected-Finance AS PER UPLOADED |
| 4 | Rejected-Technical | - | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| 5 | Rejected-Technical | - | - | Rejected-Technical AS PER TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | M/S BABA TRADERS L3 | M/s Narayan Enterprises L1 | M/s Asha Colonizers and Contractors Private Limited L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting in correcting internal section of canal including all lead & lift, proper disposal, manual compaction required for proper completion of work. | 5,62,731.2 | Cum | 39 ₹2,19,46,516.8 | 35.9 ₹2,02,02,050.08 | 46.75 ₹2,63,07,683.6 |
| 2.00 | Laying of dry brick on edge (soling) including preparation of sub-grade to prescribed slope, filling joint with earth /sand , T&P etc. as per Id sepcification. | 67,697 | Sqm | 495 ₹3,35,10,015 | 440 ₹2,97,86,680 | 425 ₹2,87,71,225 |
| 3.00 | Earth work in excavation in foundation in all type of soil with all lead and lift including back-filling the trench with proper disposal, ramming and dressing required for proper completion of work for boundary pillar. | 47.64 | Cum | 70 ₹3,334.8 | 80 ₹3,811.2 | 70 ₹3,334.8 |
| 4.00 | Fixing of RCC Precast Boundary Pillar including cost of all materials, labour and T&P etc. required for proper completion of work. | 397 | No. | 40 ₹15,880 | 39 ₹15,483 | 30 ₹11,910 |
| 5.00 | Laying C.C. in M-15 (1:2:4) in foundation with cement, coarse sand & stone grit (20 mm to 40 mm.) for boundry pillar including all cost of materials, carraige up to site of work, T&P and labour required for proper completion of work. as per Id sepcification. | 21.84 | Cum | 8,000 ₹1,74,680 | 9,300 ₹2,03,065.5 | 8,600 ₹1,87,781 |
| 6.00 | Laying R.C.C. in M-25 in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige up to site of work, T&P and labour required for proper completion of work. as per Id sepcification. | 1,582.29 | Cum | 9,300 ₹1,47,15,297 | 9,800 ₹1,55,06,442 | 8,900 ₹1,40,82,381 |
| 7.00 | Centering and shuttering of RCC including cost of material, labour, T&Petc. required for proper completion of work. as per Id sepcification. | 3,478.84 | Sqm | 450 ₹15,65,478 | 500 ₹17,39,420 | 690 ₹24,00,399.6 |
| 8.00 | Finishing wall with acrylic smooth exterior paint of required shade including cost of material, labour, T&P etc. required for proper completion of work.as directed by engineer in charge. | 3,224.34 | Sqm | 100 ₹3,22,434 | 100 ₹3,22,434 | 110 ₹3,54,677.4 |
| 9.00 | Reinforcement of steel including cutting, bending & binding including all cost of material, labour, T&Petc. required for proper completion of work. as per Id sepcification. | 174.77 | MT | 73,500 ₹1,28,45,595 | 73,000 ₹1,27,58,210 | 65,662 ₹1,14,75,747.74 |
| 10.00 | Letter Writing for details of canal Boundary Pillars including all cost of material, labour, T&Petc. for proper completion of work. | 9,925 | No. | 20 ₹1,98,500 | 10 ₹99,250 | 8.1 ₹80,392.5 |
Tender Value
Refer Docs
EMD Value
₹24.3 L
Closing Date
17 Feb 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER GANDAK IRRIGATION WORK CIRCLE-1, GORAKHPUR
Construction of Boundary Pillar and Restoration of internal section, reconstruction of damaged 04 no. VRB and Repairing of 24 no. regulators of Chaff branch from km 0.000 to km 39.450 in district Kushinagar.
2026_UPIDC_1111715_2
12/SE/2025-26
Open Tender
Civil Works
365 days
KUSHINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹24.3 L
Yes
27 Mar 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
17 Feb 2026
3 Feb 2026
Earth work in cutting in correcting internal section of canal including all lead & lift, proper disposal, manual compaction required for proper completion of work.
Laying of dry brick on edge (soling) including preparation of sub-grade to prescribed slope, filling joint with earth /sand , T&P etc. as per Id sepcification.
Earth work in excavation in foundation in all type of soil with all lead and lift including back-filling the trench with proper disposal, ramming and dressing required for proper completion of work for boundary pillar.
Fixing of RCC Precast Boundary Pillar including cost of all materials, labour and T&P etc. required for proper completion of work.
Laying C.C. in M-15 (1:2:4) in foundation with cement, coarse sand & stone grit (20 mm to 40 mm.) for boundry pillar including all cost of materials, carraige up to site of work, T&P and labour required for proper completion of work. as per Id sepcification.
Laying R.C.C. in M-25 in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige up to site of work, T&P and labour required for proper completion of work. as per Id sepcification.
Centering and shuttering of RCC including cost of material, labour, T&Petc. required for proper completion of work. as per Id sepcification.
Finishing wall with acrylic smooth exterior paint of required shade including cost of material, labour, T&P etc. required for proper completion of work.as directed by engineer in charge.
Reinforcement of steel including cutting, bending & binding including all cost of material, labour, T&Petc. required for proper completion of work. as per Id sepcification.
Letter Writing for details of canal Boundary Pillars including all cost of material, labour, T&Petc. for proper completion of work.
Dismantling old, damaged & broken brick abutment and pier in pucca work incl. all cost of labour T&P required for proper completion of work.
1st class brick work in 1:4 cement & coarse sand mortar for parapet and gate repairing with M-150 brick, coarse and including all cost of materials, carriage up to site of work, T&P and labours required for proper completion of work.
Centering and shuttering for C.C. work including all cost of materials, T&P, labours and other accessories required for proper completion of work. as per Id sepcification.
Laying CC work in M-20 in foundation with cement, coarse sand & stone grit (10mm to 20mm.) including all cost of materials, carraige upto site of work, T&P and labour required for proper completion of work. as per Id sepcification.
Deep struck Cement pointing in 1:2 cement coarse sand mortor including cost of all material ,carriage up to site of work labour T&P etc required for proper completion of work. as per Id sepcification.
Erection and fabrication charges of gate and gate parts. (Material and labour.)
Lifting mechanism Assembly for gate Repairing charge etc.
Providing two coat enamel paint over one coat primer for gate painting including all materials, labour, T&P etc complete. as per Id sepcification.
Greasing & oiling of Head regulator including cost of all material, labour& T&P etc. for
Providing and fixing Rubber Seal for head/crass regulator including all materials, labour, T&P etc complete. as per Id sepcification.
Dismantling of old and damaged Gate and Gate parts
Providing for repairing gate material .M.S. Channel 100X50X4.70mm, M.S. Channel 75X40X4.40 mm, M.S. Angle 50X50X5 mm,M.S. Angle 60X60X5 mm,M.S. Flat 50X5mm thick and M.S. Flat sheet 3.15mm thick.
Dismantling of Reinforced Cement Concrete work and its proper disposal including cost of labour, T&P for proper completion of work as directed by Engineer-in-Charge and as per I.D. specification.
Earth work in excavation in foundation in all type of soil with all lead and lift including back-filling the trench with proper disposal, ramming and dressing required for proper completion of work for V.R.B . as per Id sepcification.
Earth work for making Diversion including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and I.D. specification.
Supply and laying of 18 MM thick joint filler board in construction joint including cost of all material labour T&P required for proper completion of work.
Boring with 100 mm diameter casing pipe including lowering and extraction of assembly, loading, unloading and carriage including cost of all materials, labour and T&P etc. required for completion work as directed by Engineer-in-Charge as per I.D. specification
Running of 5 H.P. generator set pump for dewatering including arrangement of Pump suction and delivery pipes and other accessories at site including cost of all materials, labour and T&P etc.for complete work as directed by Engineer-in-Charge as per I.D.
Supplying & Fixing wheel guard stone including cost of all material ,labour, t&p etc. required for proper completion of work
Laying PVC Pipe of 75 mm dia in drainage spout including cost of pipe, other material, labour, T&P etc. required for completion work as directed by Engineer-in-Charge and as per drawing and I.D. specification.
Sign board at site for notice both side including Painting & Letter writing cost of all material ,labour, t&p etc. required for proper completion of worK. as directed by Engineer-in-Charge
Earth work in removing of diversion bund and using for making ramp including cost of labour and T&P with proper completion of work as directed by Engineer-in-charge and I.D. specification.
Laying P C.C. in 1:3:6 in foundation with cement, coarse sand & stone grit (20 mm to 40 mm.) including all cost of materials, carrige upto site of work, T&P and labours required for proper completion of work.
Providing one coat of VG -30 bitumen painting with two layer of tarfelt again followed by second coat of bitumen on abutment and pier before laying R.C.C. Slab including cost of all material labour and T & P etc.
S/Laying of filter material as coarse sand, grit, gravel, fine sand. Stone ballast, brick ballast with proper compaction and rolling including cost of all materials, labour and T&P etc.
Stone Grite (12.5 mm to 20 mm )
Grit, gravel (4.75mm to 10 )
Coarse sand
Supply of mechanically woven double twisted hexagonal shaped wire mesh gabion box/crate of 1m³ mesh size 10 cm x12 cm SWG GI wire.
Earth work in excavation in canal internal slope for placing crate/box in all type of soil with all lead and lift including back-filling with proper disposal and dressing required for proper completion of work.
Laying Wire crate filled with brick bat obtained form dismantled of pucca work for protection work including cost of all materials, labour, T&P etc required for proper completion of work as per I.D. specification.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
BID02.pdf
Tender Documents • 2.18 MB
BOQ_2054866.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid