Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.2 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹40.9 L+₹1.7 L (4.23%)Rejected-Finance FRIENDS COLONY STREET A DHANGU ROAD PATHANKOT 145001 PB | PATHANKOT | PATHANKOT | PUNJAB | 145001 | L2 | Rejected-Finance Other then L1 | |
| 3 | L3₹54.7 L+₹15.5 L (39.4%)Rejected-Finance | L3 | Rejected-Finance Other then L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Not recommended Contractor not upload certain docs in 1st Cover | |
| 5 | Rejected-Technical | - | Rejected-Technical Not recomended NO remark in WLR of CEWC Qtr ending mar 2024 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
8 Jul 2024, 6:00 pmClosed
GE (AF) Pathankot
GE (AF) Pathankot
Repair to Painting, Rigid Portion of Runway dispersals and TAxis in Technical Area at AFS Pathankot
2024_MES_659059_1
GE/PAF-07/2024-25
Open Tender
Civil Works
Item Rate
180 days
GE (AF) Pathankot
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE (AF) Pathankot
₹80,000
Yes
24 Sept 2024
11 Jun 2024
15 Jul 2024
11 Jun 2024
8 Jul 2024
25 Jun 2024
Amount
Preparation of old treated horizontal concrete or bituminous roads, pavement surfaces ,painting lines, dashes, strips, circles and other markings of exceeding 10 cm width or girth with Grinding Machine or other mechanical methods and remove all scrap material outside Technical area and applying one coat of thinnable/matt finished road marking paint white/orange/yellow/black or any other colour as approved by GE using mechanical pavement marking machine as approved by GE complete all as specified and as directed by Engr-in-Charge. Note :- (1) The site shall be available based on the Flying Operation, hence Contractor shall quote their rate accordingly and this condition will be apllicable for all type of work in this contract. The site for the above work shall be available in piecemeal as and when informed by Engineer-in-charge. The rate for the same shall be deemed to be included in the quoted rate. (2)Thickness of paint shall be minimum 40micron ( Dry film thickness) for each coat. (3) An exclusive team of adequate number of labourers for painting activity shall be deployed by the contractor as per directions of Engr-in-Charge. (4) The execution of 30% quantity is to be completed within 60 days from the date of commencement failing to meet this execution target by given due date shall incur irreversible penal recovery of Rs. 10000. (5) Next 50% quantity is to be completed within 120 days from the date of commencement of contract; failing to meet this execution target by given due date shall incur irreversible panel recovery of Rs. 15000. (6) Balance 20% quantity is to be completed before completion date of contract.
Preparation of old treated horizontal concrete or bituminous roads, pavement surfaces ,painting lines, dashes, strips, circles and other markings of not exceeding 10 cm width or girth with Grinding Machine or other mechanical methods and remove all scrap material outside Technical area and applying one coat of thinnable/matt finished road marking paint white/orange/yellow/black or any other colour as approved by GE using mechanical pavement marking machine line approved by GE complete all as specified and as directed by Engr-in-Charge. Note : Thickness of paint shall be minimum 40micron ( Dry film thickness) for each coat.
Material and labour for applying one coat of synthetic enamel paint to rigid / flexible portion of PTT/ Runway surfaces of any description Exc. 10cm in width or girth including preparation of old surface with steel wire brush/coir brush, brooming and removing dust, moulds, etc all as specified and directed by Engr-in-charge.
Material and labour for applying one coat of white wash to old decorative / concrete / bituminous surface including preparation of old surface with steel wire brush/coir brush, brooming and removing dust, moulds, etc all as specified and directed by Engr-in-charge.
Material and labour for Spreading and levelling in layers and exc 25 cm of best quality coarse Sand For Filling and including removal of any pebbles/stone which is found in mixed with coarse sand Where directed , Complete all as specified and directed by Engineer-In-Charge.
Material and labour for Ploughing of SGA sand with tractor, cultivator and all required accessories as per the requirement of user. Note : Rate quoted by contractor will be included for fuel, tractor, cultivator, accessories, driver and labour etc complete all as specified and directed by Engineer-in-Charge.
Material and labour for cleaning/racking out cracks/joints on flexible portion of runway and making to maximum width upto 50mm and depth 50mm (For cracks above 3 to 5mm wide ) by cutting with cutter machine in flexible pavement and removing all existing loose and foreign materials to a distance exceeding 50 metres but not exceeding 100 metres, cleaning the surface with wire brushes and then cleaning the surfaces with compressed air using compressor, priming the surfaces with primer Dencote Primer 601 and filling with Epoxy tar compound levelled with trowel complete all as specified and directed by Engr-in-charge.
Repair to Pop out spalled joints, corner, pot holes in concrete slab by cutting, chiseling manually/ mechanical cutter, side perpendicular to a minimum depth of 2.5 to 3 cm and cleaned off all loose or broken material and remove outside Technical area cleaning the surface with mechanical blower to remove all dust/loose particle outside Technical area and repair concrete slab floor with concrete based adhesives resin epoxy to match the existing surface including fomwork where required, complete all as specified and directed by Engineer-in-Charge. The resin and the materials to be used must be of approved manufecturer. Contractor shall take approval from GE by showing the packaged, anthentic material sample obtained from any of the three manufacturers only. After approval, contractor must procure complete quantity required for this item of work and get the same verified by GE. Only thereafter, he shall be permitted to commence execution. Decision of GE shall be final & binding in this aspect complete all as specified and directed by Engr-in-charge. Note : (1) Application shall be as per manufacturers instructions. (2) All the health and safety measures shall be followed by the contractor during use of epoxy resin. (3) An exclusive team of adequate number of labourers for painting activity shall be deployed by the contractor as per directions of Engr-in-Charge. (4) The execution of 30% quantity is to be completed within 60 days from the date of commencement failing to meet this execution target by given due date shall incur irreversible penal recovery of Rs. 10000. (5) Next 50% quantity is to be completed within 120 days from the date of commencement of contract; failing to meet this execution target by given due date shall incur irreversible panel recovery of Rs. 15000. (6) Balance 20% quantity is to be completed before completion date of contract.
Repair to pop out spalled joints, corner, pot holes in concrete slab by cutting, chiselnng manually & mechanical cutter, side prependicular to a minimum depth of 2.5 to 3 cm and cleaned off all loose or broken material remove outside Technical area, cleaning the surface with mechanical blower to remove all dust/loose particle outside Technical area and repair concrete slab floor with elastomeric PU concrete including apply primer as per manufacturer instruction to match the existing surface including fomwork where required complete all as specified and directed by Engr-in-charge. NOTES: (1) Application shall be followed as per manufacture instruction. (2) All the health and safety measurer shall be followed by the contractor during used of flexo elastromeric concrete. (3) An exclusive team of adequate number of labourers for repair to joints/corners with elastromeric PU concrete shall be deployed by the contractor as per directions of Engr-in-Charge. (4) The execution of 30% quantity is to be completed within 60 days from the date of commencement failing to meet this execution target by given due date shall incur irreversible penal recovery of Rs. 10000. (5) Next 50% quantity is to be completed within 120 days from the date of commencement of contract; failing to meet this execution target by given due date shall incur irreversible panel recovery of Rs. 15000. (6) Balance 20% quantity is to be completed before completion date of contract.
M/S SINGH AND ASSOCIATES (BID ID -3053795)
Surya & Gautam Builders (BID ID -3046231)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .