| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹10.6 L+₹8,917.72 (0.85%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | srivinayagaengineers L2 | PARAMOUNT ENGINEERING ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Construction of Compound wall to Anganwadi Building near Bodipalayam Panchayat Union School Seerapalayam H/O Seerapalayam panchayat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed. | 80.9 | Cum | 250 ₹20,225 | 246.52 ₹19,943.47 Lowest |
| 3.00 | Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers | 7.33 | Cum | 5,070 ₹37,163.1 | 5,069.88 ₹37,162.22 Lowest |
| 4.00 | Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications | 163.37 | Sqm | 520 ₹84,952.4 | 516.5 ₹84,380.61 Lowest |
| 5.00Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
| 6.00 | Foundation & Basement | 21.93 | Cum | 8,999 ₹1,97,348.07 | 8,994.27 ₹1,97,244.34 Lowest |
| 7.00 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., | 2.19 | MT | 89,923 ₹1,96,931.37 | 89,920.3 ₹1,96,925.46 Lowest |
| 8.00 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 27.5 | Cum | 7,500 ₹2,06,250 | 7,496.37 ₹2,06,150.18 Lowest |
| 9.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 279.18 | Sqm | 270 ₹75,378.6 | 267.68 ₹74,730.9 Lowest |
| 10.00 | Painting with enamel paint two coats over Mild steel doors and windows including all charges | 279.18 | Sqm | 270 ₹75,378.6 | 249.06 ₹69,532.57 Lowest |
Tender Value
₹10.9 L
EMD Value
₹11,000
Closing Date
23 Jul 2025, 3:00 pmClosed
Additional Collector (Dev), Coimbatore
DRDA, Coimbatore
Construction of school compound wall to Anganwadi Building near bodipalayam P.U.School H/o Seerapalayam in Madukkarai Block of COIMBATORE District Package No TN02-81 under National RURBAN MISSION(NRUM) PHASE-I 2016-17 to 2018-19 Scheme
2025_RDTN_577652_1
DIPR/06/Tender/2016/B4 dated 23.06.2025
Open Tender
Civil Works
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹11,000
15 Oct 2025
4 Jul 2025
23 Jul 2025
4 Jul 2025
23 Jul 2025
4 Jul 2025
Amount
Construction of Compound wall to Anganwadi Building near Bodipalayam Panchayat Union School Seerapalayam H/O Seerapalayam panchayat
Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed.
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Foundation & Basement
Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc.,
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Painting with enamel paint two coats over Mild steel doors and windows including all charges
Provision for Name board etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
srivinayagaengineers (BID ID -1409245)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .