| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.7 LAccepted-AOC SINGAMARI SINGTAM ROAD NORTH POINT DARJEELING WB | DARJEELING | DARJEELING | WEST BENGAL | ₹48.7 L | L1 | Accepted-AOC Rate accepted |
| 2 | L2₹49.1 LRejected-Finance | ₹49.1 L | L2 | Rejected-Finance L2 bidder |
| 3 | L3₹49.2 LRejected-Finance | ₹49.2 L | L3 | Rejected-Finance L3 bidder |
| 4 | L4₹49.7 LRejected-Finance K D PRADHAN ROAD DIST KALIMPONG WB | KALIMPONG | WEST BENGAL | ₹49.7 L | L4 | Rejected-Finance L4 bidder |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹49.2 L
EMD Value
₹98,402
Closing Date
12 Mar 2026, 2:00 pmClosed
Director, PNHZP, Darjeeling
Office of the Director, PNHZ Park, Darjeeling
Restoration of Landslide below Lesser Carnivore enclosures by way of providing Gravity wall or RCC retaining wall at PNHZ Park, Darjeeling
2026_WBZA_1014932_1
NIeT_28_PNHZP_2025-26
Open Tender
CIVIL WORKS
180 days
Darjeeling
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹98,402
4 Jun 2026
26 Feb 2026
16 Mar 2026
26 Feb 2026
12 Mar 2026
26 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
(b) Depth of excavation additional depth beyond 1,500 mm. and up to 3,000 mm. but not requiring shoring.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
Cost of stone boulder 150 mm size delivered ans stacked at site.
(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor.
(B) With N.B variety stone metal.
(a) 1:3:6 proportion.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
(ii) River bazree.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
(b) River bazree.
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
(i) (1:3:6) proportion.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
( c ) 9 to 12 mm. thick approved quality ply board shuttering in any concrete work.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.
SAIL/ TATA/RINL
Providing weep holes (150 x 75 mm)in abutment, wing wall, retaining wall for the entire thickness 1in 20 towards drainage surface including packing with brick bats or boulders of different sizes of approved quality including cost and carriage of materials.
Earth work in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc.layer by layer complete .(payment to be made on the basis of measurement of finished quantity of work).
(a) With earth obtained from excavation of foundation.
Add GST @ 18%
Add Labour Welfare Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.68 MB
BOQ_2492921.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid