| 1 | L1₹72.4 LAccepted-AOC MAYILADUTHURAI | L1 | Accepted-AOC Accepted | |
| 2 | L2₹73.0 L+₹55,891.62 (0.77%)Rejected-AOC | L2 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹74,000
Closing Date
19 Jun 2023, 3:00 pmClosed
JOINT DIRECTOR/PROJECT DIRECTOR
1st floor, DRDA, Collectorate campus,Tiruvarur
1)Strengthening of 18 Pudhukkudi Village road km 0/0-1/0,2)Strengthening of Koonthalur cettiyer salai km 0/0 -0/650 and 3)Strengthening of KANGEYANAGARAM SCHOOL ROAD km 0/0 -0/440
2023_RDTN_326823_1
DIPR/2874/TENDER/2023/kdl3R
Open Tender
Civil Works - Roads
Item Rate
180 days
Kodavasal block
As per Tender Document
3 documents required · 3 mandatory
₹0
₹74,000
12 Jul 2023
13 Jun 2023
19 Jun 2023
13 Jun 2023
19 Jun 2023
13 Jun 2023
Amount
1)Strengthening of 18 Pudhukkudi village Road km -0/0-1/0 (Road code - R-649)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre of gravel of blindage per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.R.T.specification.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Applying tack coat over WBM surface (not treated with primer) using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe
BC 25mm Thick (Grade-II) Using VG30 Bitumen and Polymer Modified Bitumen (PMB) Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of PMB Cubes for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while strips of road marking paint. Rumble Strips = 3 X 3.75 X 0.25 = 2.81
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:-Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc complete as per MORTH&H specification No.803
Proviosion for KM stone
Provision for HM stone
Provision for Name board & Citizen information Board
Provision for sign Boards
Provision for Octogon Curves
2)Strengthening of Koonthalur Cheetiyer Salai km -0/0-0/650 (Road code - R-738)
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre of gravel of blindage per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.R.T.specification.
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while str
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of
Provision for HM stone
Provision for Name board & Citizen information Board
Provision for sign Boards
Provision for Octogon Curves
3)Strengthening of Kangeyanagaram School Road Km 0/0-0/440 (Road code R- 133)
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Providing and laying WBM 75mm compacted thickness using Grade III metal using one cubic metre of 63 – 11.2mm IRC size HBG metal with 0.24 cubic metre of gravel of blindage per 10 sqm including cost and conveyance of all materials labour charges for stacking spreading road side and stack to them departmental gauge including all labour charges for spreading metal and sand gravel mix hand packing to compac watering with all leads for water and compaction by 8-10 tones power roller including hire charges and fuel charges for power rollwr water sprinkler and all other tools and plants employed barrcating etc.,completed as per clause 404 of M.O.R.T.specification.
Applying tack coat over WBM surface (not treated with primer) using 4Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,
Provision of Rumble Strips with premix Bituminous carpet Provision of 15 nos. rumble strips covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre-to-centre approved locations to control speed, marked with while str
Road Marking With Hot Applied Thermoplastic Compound With reflectorising Glass Beads on Bituminous Surface:- Providing and laying of hot applied thermoplastic compound 2.50mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of
Provision for HM stone
Provision for Name board & Citizen information Board
Provision for sign Boards
Provision for Octogon Curves
Towards the charges for routline maintenance of the road work executed under MGSMT Scheme including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
1)Strengthening of 18 Pudhukkudi village Road km -0/0-1/0 (Road code - R-649) Mintenance Estimate
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
2)Strengthening of Koonthalur Cheetiyer Salai km -0/0-0/650 (Road code - R-738) Maintenance estimate
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
3)Strengthening of Kangeyanagaram School Road Km 0/0-0/440 (Road code R- 133)
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Venkatesan B
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .