| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-Finance | L1 | Accepted-Finance Responsive | |
| 2 | L2₹8.3 L+₹44,997.48 (5.72%)Accepted-Finance | L2 | Accepted-Finance Responsive | |
| 3 | L3₹8.3 L+₹45,378.30 (5.77%)Accepted-Finance | L3 | Accepted-Finance Responsive | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.9 L
EMD Value
₹15,859
Closing Date
13 Apr 2023, 3:00 pmClosed
EE PBSD APWD Port Blair
EE PBSD APWD Port Blair
Construction of Retaining wall at back side of Police Qtr AP - 14 and AP-15 (Type-II) at Atlanta Point under AE-I, PBSD, Port Blair - Re - Call
2023_APWD_9924_1
NIT No.142/EE/PBSD/2022-23
Open Tender
Civil Works - Others
Works
60 days
Atlanta Point
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,859
21 Apr 2023
31 Mar 2023
13 Apr 2023
31 Mar 2023
13 Apr 2023
31 Mar 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Providing PVC pipe 75 mm dia in weep holes as per direction of Engineer-in-charge.
6 mm cement plaster of mix :
1:3 (1 cement : 3 fine sand)
M/S SUNDARAM CONSTRUCTION
A. CHINNAIAH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .