Tender Value
₹9.8 L
EMD Value
₹19,500
Closing Date
21 Aug 2025, 2:00 pmClosed
SE-II, 2x200MW, BTPS, Obra
SE-II, 2x200MW, BTPS, Obra
Work of overhauling of Pumps, Hydraulic Couplings, Heat Exchangers, of Turbine side, during overhauling of Unit 13
2025_RVUNL_1058040_1
W/OBR/SE2/TMD2/8924/OH-13
Open Tender
Miscellaneous Works
Fixed-rate
365 days
BTPS, Obra
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Dy CAO, CFA and BO BTPS, Obra
₹19,500
13 Oct 2025
18 Jul 2025
23 Aug 2025
18 Jul 2025
21 Aug 2025
18 Jul 2025
18 Jul 2025 - 21 Aug 2025
Amount
Overhauling of Boiler Feed Pump up to balancing disc (Pump 200KHI, 200KHIS)
Inspection/Rectification of fault of BFP Motor driving end bearing.
Inspection/Rectification of fault of BFP Motor Non driving end bearing.
Inspection/Rectification of fault of BFP Suction end bearing.
Inspection/Rectification of fault of BFP discharge end bearing.
O/H of BFP Booster Pump (Pump 8/10' BLE, M&P Make)
Complete O/H of CEP (28BHRC Make: KBL)
Cleaning by steam wash and hydraulic testing of BFP Lube oil cooler after taking bunch out
Cleaning by steam wash and hydraulic testing of BFP working oil cooler after taking bunch out
Cleaning of Bearing cooling Water line of BFP Booster Pump
Revision/Checking and hydraulic testing of tube of SWC heat exchanger
Cleaning, leakage Checking and leakage attending of tube of BCW heat exchanger
Cleaning, leakage Checking and leakage attending of tube of SW heat exchanger
Re-visioning & Checking and of wire mesh (Strainer) of CEP suction line
O/H of C.W. Booster pump.
O/H of H2 gas cooling pump.
O/H of BCW pump.
O/H of SWC Pump
O/H of SW Pump
O/H of hydrazine Dozing Pump
O/H of Phosphate Dozing Pump
Clean of Suction Strainer of BFP Booster Pump
Cleaning & inside painting of Condensate storage tank
Cleaning & inside painting of BCW (-) 4-meter level.
Cleaning and rectification of components & Inside Painting of BCW overhead tank (27 M Elevation)
Clean and OH of components & Inside Painting of Phosphate tank
Cleaning and OH of internal component & Inside Painting of Hydrazine tank
Cleaning and OH of internal component & Inside Painting of SWC tank
COMPLETE O/H OF HYDRAULIC COUPLING of BFP (Voith Make R16, R17 Series)
Fabrication/Replacement of BFP cooling Header (inlet)
Fabrication/Replacement of BFP cooling Header (outlet)
Complete Overhauling of Drip Pump. (Model 100CJH/9 BHEL make)
Alignment of hydraulic coupling with motor and pump.
Cleaning of cooling line of drip pump.
Replacement of the inside stator assembly of BFP.
Re-adjustment of bearing for replacement of BFP motor
Straightening of CEP shaft & Rectification of Thread
Revision & check of control block of scoop of BFP Hydraulic Coupling (Voith R17, R16 Series)
Overhauling of Hot-well Make up Pump (Make- S.U. Motors Pvt. Ltd. Model: CPP1-100X80-315)
M/S ADITIYA VISHWAKARMA CONTRACTOR (BID ID -5464630)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .