Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹42.5 LAdmitted-Finance | -27.99% | ₹42.5 L | L1 | Admitted-Finance |
| 2 | L2₹46.5 L+₹4.0 L (9.42%)Admitted-Finance | -21.21% | ₹46.5 L+₹4.0 L (9.42%) | L2 | Admitted-Finance |
| 3 | L3₹52.0 L+₹9.5 L (22.4%)Admitted-Finance | -11.87% | ₹52.0 L+₹9.5 L (22.4%) | L3 | Admitted-Finance |
Tender Value
₹59.0 L
EMD Value
₹1.2 L
Closing Date
2 Jul 2026, 6:00 pmClosed
SEWDSCPALI
SEWDSCPALI
Construction of CCT, MPT, Tanka in MJSA 2.0 Phase-3 Rani Station
2026_WDSC_569816_1
889/19-6-26RANI
Open Tender
Civil Works
Percentage
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Secretary, RREIS
₹1.2 L
Yes
9 Jul 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
2 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr¼thds,u 2025 vkbZVe ua- 191½ | 2,35,600 | sqm | 2.86 | ₹6,73,816 |
| 2 | c.M ij 5 ls 7-5 lseh xgjkbZ dk Mkxcsfyax dk;Z ¼thds,u 2025 vkbZVe ua- 6 c½ | 83,360 | m | 1.71 | ₹1,42,545.6 |
| 3 | जे-सी-बी- मशीन@ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य] खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर] पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन ¼काट क्षेत्रफल में½ प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी- एवं लिफ्ट 3 मी- तक। Draft based on chapter 5th of irrigation page number 32 to 34 ¼दिनाँक 01-04-2022 से मान्य½ ईकाई 1 घन मी.(GKN 2025 item 196 b) | 35,347.99 | cum | 88.5 | ₹31,28,297.11 |
| 4 | Benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m (WRD BSR 2022/CH-V/ ITEM 20) | 1,604 | cum | 73.63 | ₹1,18,102.52 |
| 5 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी : 4 पत्थर एग्रीगेट अनुपात में 12 मिमी नामीय माप की एग्रीगेट के साथ डालना,कूटना तथा तराई आदि सहित । | 11.38 | cum | 4,495.29 | ₹51,156.4 |
| 6 | Compaction of earth or highly weathered strata by mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of. (i) at least 95% of Standard Proctor's density | 8,139.6 | cum | 21.82 | ₹1,77,606.07 |
| 7 | Dressing of uneven embankment in required profile (WRD BSR 2022/CH-V/ ITEM 23) | 5,555.4 | sqm | 10.73 | ₹59,609.44 |
| 8 | Watering of earth incluing cost of carriage of water when source of water upto 2 km. | 8,139.6 | cum | 14.45 | ₹1,17,617.22 |
| 9 | ग्रिल/गेट आदि में लौहे का कार्य जिसमें सपाट कोनिया, टी तथा नाळीदार (चेनल), को काटना, चढ़ाना तथा लगाना आदि। | 90 | kg | 105.99 | ₹9,539.1 |
| 10 | 110 मिमी व्यास के पी.वी.सी. पाईप का डालना मय अन्य आवश्यक सामग्री साहित | 20 | rm | 247.8 | ₹4,956 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 35.21 MB
NIT4.pdf
Tender Documents • 35.19 MB
BOQ_1013954.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .