GEMC-511687733481164
Awarded to POOJA BUILDCON CONSTRUCTION
₹67.1 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Layer2 managed switch | Layer2 Managed Switch | 8517 | 4 Nos | 47,200 | 188,800 |
| 1G SFP Transceiver Module | 1G SFP Transceiver Module | 8517 | 14 Nos | 3,540 | 49,560 |
| Serial to IP Convertor with accessories | Serial To IP Convertor With Accessories | 8517 | 8 Nos | 11,800 | 94,400 |
| 12 or 24 Volt Power Adapter for serial convertor | 12 Or 24 Volt Power Adapter For Serial Convertor | 8517 | 8 Nos | 2,360 | 18,880 |
| 24 core Armoured OFC cable | 24 Core Armoured OFC Cable | 8517 | 9,000 meters | 82.6 | 743,400 |
| 24 Core Jointing Enclosure IP 67 | 24 Core Jointing Enclosure IP 67 | 8517 | 10 Nos | 3,540 | 35,400 |
| 48 Port LIU with pigtel including splicing | 48 Port LIU With Pigtel Including Splicing | 8517 | 6 Nos | 41,300 | 247,800 |
| OFC patch cord- 5Mtr | OFC Patch Cord- 5Mtr | 8517 | 74 Nos | 708 | 52,392 |
| CAT-6 Patch cord | CAT-6 Patch Cord | 8544 | 14 Nos | 1,770 | 24,780 |
| CAT-6 STP cable | CAT-6 STP Cable | 8544 | 300 meters | 70.8 | 21,240 |
| 9U Network rack | 9U Network Rack | 7308 | 4 Nos | 17,700 | 70,800 |
| 42U Network rack | 42U Network Rack | 7308 | 1 Nos | 106,200 | 106,200 |
| GI Pipe | GI Pipe | 7307 | 100 meters | 1,180 | 118,000 |
| HDPE Pipe | HDPE Pipe | 3917 | 7,500 meters | 118 | 885,000 |
| PVC Conduit | PVC Conduit | 3917 | 250 meters | 472 | 118,000 |
| Electronic Route marker | Electronic Route Marker | 8529 | 50 Nos | 3,540 | 177,000 |
| Metal Engraved Route Marker on wall HDPE Pipe | Metal Engraved Route Marker On Wall HDPE Pipe | 9984 | 30 Nos | 2,950 | 88,500 |
| Krone Box | Krone Box | 9984 | 4 Nos | 2,360 | 9,440 |
| Krone with surge protector | Krone With Surge Protector | 9984 | 5 Nos | 2,360 | 11,800 |
| Inspection Chamber or manhole | Inspection Chamber Or Manhole | 9984 | 70 Nos | 8,260 | 578,200 |
| Laying of RC Line through ground at depth 1 mtr | Laying Of RC Line Through Ground At Depth 1 Mtr | 9984 | 3,500 meters | 35.4 | 123,900 |
| Digging backfilling and laying of OFC through HDPE pipe | Digging Backfilling And Laying Of OFC Through HDPE Pipe | 9984 | 7,000 meters | 206.5 | 1,445,500 |
| HDD Digging backfilling and laying of OFC through HDPE pipe | HDD Digging Backfilling And Laying Of OFC Through HDPE Pipe | 9984 | 300 meters | 2,360 | 708,000 |
| Concrete Digging backfilling and laying of OFC through HDPE pipe | Concrete Digging Backfilling And Laying Of OFC Through HDPE Pipe | 9984 | 200 meters | 826 | 165,200 |
| FXO devices | FXO Devices | 9984 | 5 Nos | 59,000 | 295,000 |
| OFC Splicing | OFC Splicing | 9984 | 168 Nos | 590 | 99,120 |
| SITC | SITC | 9984 | 1 Nos | 236,000 | 236,000 |