Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.1 LAccepted-AOC | ₹71.1 L Quoted ₹94.6 L | L1 | Accepted-AOC L1 rate |
| 2 | L2₹78.8 LRejected-Finance NO 203 204 PLAZA CENTER 129 G N CHETTY ROAD CHENNAI 600 006 | CHENNAI | TAMIL NADU | 600006 | ₹78.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SRI SARAVANA INDUSTRIES L2 | U-TECH CONSULTANTS AND ENGINNERS PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Labour Charges for Re-tubing of 1 No LP Heater Tube Nest for 210 MW LMW Design Turbine by 90/10 Cupro Nickel Tubes. (As per Scope of Work and special conditions) | 1 | No. | 12,01,000 ₹14,17,180 Lowest | 12,41,234 ₹14,64,656.12 |
| 2.00 | Material cost for Re-Tubing of LP Heater tube nest of 210 MW LMW design Turbine by 90/10 Cupro Nickel Tubes. Material Specification:
Tube Size : Outer Dia-16 mm , Inner Dia-14 mm
Material : 90/10 Cupro Nickel tubes.
Total No. of tubes : 1150 Nos
Total Length of tubes : 7576.65 Mtr
Hydraulic test : 30 KSC | 1 | No. | 56,90,000 ₹67,14,200 Lowest | 57,01,207 ₹67,68,724.26 |
| 3.00 | Transportation charges of LP Heater tube nest from MTPS-I to work spot (To & Fro) | 1 | LS | 35,000 ₹41,300 | 26,000 ₹30,680 Lowest |
| 4.00 | Loading & Unloading charges (Both ends) | 1 | LS | 4,500 ₹5,310 | 1,106 ₹1,305.08 Lowest |
| 5.00 | Insurance Charges (To & Fro) | 1 | LS | 35,000 ₹41,300 | 34,713 ₹40,961.34 Lowest |
| 6.00 | Packing & Forwarding charges (Both ends) | 1 | LS | 60,000 ₹70,800 Lowest | 69,424 ₹81,920.32 |
| 7.00 | Less credit estimate value of eroded admiralty brass tube (Scrap) | 1 | LS | 9,90,000 ₹11,68,200 | 8,09,300 ₹9,54,974 Lowest |
Tender Value
Refer Docs
EMD Value
₹65,500
Closing Date
15 Jul 2024, 2:00 pmClosed
CE MTPS I
CE MTPS I Mettur Dam 6
Re tubing of LP Heater Tube nest by 90/10 Cupro Nickel Tubes 1 No
2024_EB_458153_1
CE MTPSI SE PA EE SI AEE1 OT No 04 2024 25
Open Tender
Miscellaneous Goods
Buy
90 days
Mettur Dam 6
As enclosed
4 documents required · 4 mandatory
₹0
₹65,500
Yes
23 Jul 2026
28 Jun 2024
16 Jul 2024
28 Jun 2024
15 Jul 2024
29 Jun 2024
Labour Charges for Re-tubing of 1 No LP Heater Tube Nest for 210 MW LMW Design Turbine by 90/10 Cupro Nickel Tubes. (As per Scope of Work and special conditions)
Material cost for Re-Tubing of LP Heater tube nest of 210 MW LMW design Turbine by 90/10 Cupro Nickel Tubes. Material Specification: Tube Size : Outer Dia-16 mm , Inner Dia-14 mm Material : 90/10 Cupro Nickel tubes. Total No. of tubes : 1150 Nos Total Length of tubes : 7576.65 Mtr Hydraulic test : 30 KSC
Transportation charges of LP Heater tube nest from MTPS-I to work spot (To & Fro)
Loading & Unloading charges (Both ends)
Insurance Charges (To & Fro)
Packing & Forwarding charges (Both ends)
Less credit estimate value of eroded admiralty brass tube (Scrap)
SRI SARAVANA INDUSTRIES (BID ID -1082080)
U-TECH CONSULTANTS AND ENGINNERS PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].