| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Out of Five Contractors, Two Contractors Accepted. Three Contractors Rejected. See the Details in enclosed PDF File |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Out of Five Contractors, Two Contractors Accepted. Three Contractors Rejected. See the Details in enclosed PDF File |
| 5 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Out of Five Contractors, Two Contractors Accepted. Three Contractors Rejected. See the Details in enclosed PDF File |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
21 Mar 2023, 3:00 pmClosed
Block Development Officer (B.P)
Block Development Officer (B.P) Theni.
Providing BT Road and Drain in Main Road East Side to Bus Stand at Govindanagaram in Theni Block at MLACDS 2022-2023
2023_RDTN_295138_1
4946/2022/A3
Open Tender
Civil Works
Works
90 days
THENI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹20,000
Yes
23 Mar 2023
15 Mar 2023
21 Mar 2023
15 Mar 2023
21 Mar 2023
15 Mar 2023
Amount
Picking the Existing BT Surface as Per Standard Specification:
Collection, Supply & Filling of Red Gravel from approved quarry including stacking charges and all other labour charges etc., complete as per standard specification.
Providing and laying WBM for Bottom layer Grading - II ( 75mm to 22.40mm)IRC HBG metal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing 75mm consolidated thickness WBM for Top LAYER using 1 cum of Grade III metal of size 63 -11.2MM IRCsize HBG metal (1M3 Grade II HBG = 0.025Cum of 63mm + 0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of 11.2mm) with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials from approved quarries to roadside and stacking of materials to departmental gauge for premeasurements including labour for laying, spreading new metal, hand packing to camber, watering with all leads for good water even if the season is worst drought condition forming edge bunds and consolidation by 8 to 10 tonne power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete.
Applying tack coat using 4.00 kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered here with including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Providing and laying premix carpet with seal coat type A, 20mmconsolidated thickness using IRC size machine broken HBG metal 0.18cum of 13.2mm and 0.09cum of machine crushed broken HBG metal of 11.20mm with 14.60kg of bitumen for premixing for 10sqm of premix carpet and 0.09cum0.09cum of 6.70mm IRC size machine broken HBG metal with 9.80kgs of bitumen for sealcoat including cost and conveyance of all materials from approved quarry including the cost of bitumen which will be supplied departmentally and cost will be recovered at the rates specified in the special condition appended herewith and including conveyance bitumen to work spot handling charges for the same at both ends including labour charges for heating the bitumen to required temperature and mixing the required quantity of metal and bitumen using mini hot mix plant conveying the mix by wheel borrow including labour charges for spreading the mix to grades, lines and profile and consolidation with power roller rolling etc., including hire, fuel charges and running charges for mini hot mix plant, power roller rolling etc., including hire, fuel charges and running charges for mini hot mix plant, power roller and all other tools and plants employed &all incidental charges such as barricading, providing danger lights etc., complete complying with standard specification(Payment shall be made for the finished item of work after compaction)No.509&513 of MOST
Earth work excavation and depositing on bank with an initial lead of 10m initial lift of 2m in hard stiff clay, stiff block cotton soil and hard red earth shales, murram, ground stony earth and earth mixed with small bounders and hard gravely soil as per SS20B
Cement Concrete 1:4:8 Using 40 mm HBG metal for basement and flooring layers not more than 15cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification.
Supplying and erecting Centering including cost and conveyance of all other labour charges etc., complete.
Culvert
R.C.C 1:1.5:3 using 20mm, gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC flo
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R. Murugesan
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .