Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Incomplete Cover-I docs |
Tender Value
₹55,000
EMD Value
₹1,100
Closing Date
29 Jul 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, MID Srinagar
Zaldagar Sgr
Electrical repair works to 100 KVA HT Transformer at LIS Zazna A of MISD Ganderbal
2023_IFC_220519_2
eNIT-11
Open Tender
Electrical and Maintenance Works
Item Rate
5 days
Ganderbal
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Yes
Executive Engineer, MID Srinagar
₹1,100
Yes
31 Jul 2023
8 Jul 2023
31 Jul 2023
8 Jul 2023
29 Jul 2023
8 Jul 2023
Amount
Dismantling of the 100KVA HT transformer by way of removing of their connections at incoming and outgoing terminal. The job also includes dismantling and lowering of the transformer from bed with help of skilled labour. The job also includes complete dismantling of transformer assembly at workshop by way of opening of its top and draining of T-oil. The same shall be kept in a separate barrel which shall be arranged by the firm. The job includes extraction of HT & LT coils, core assembly and its cleaning with K-oil then drying properly through natural heat. The job includes proper checking of the damages
Rewinding /replacing /re-tapping of the HT & LT coils of Al-made of 100 KVA HT transformer damaged/burnt As per S.No. 02 of Part-2 of Tech Specs of tender document.
Cleaning of the Old T-Oil ( 120 liters ) of the transformer by way of proper dehydration method.
Complete reassembling of the transformer core assembly in the tank at work shop then connecting of the body nuts, bolts and filling of the T-Oil available and fresh in to the body with the help of skilled manpower, tools and tackles. The job include dragging/ staking of the transformer up to loading point.
Shifting of the 100 KVA HT Transformer from workshop to site of installation in a pvt arranged load carrier by way of loading and unloading. The job includes loading at workshop and unloading at site respectively with the help of skilled manpower. The job further includes dragging staking and head load at various places up to site. The job further include re-installation of the same on the transformer bed and connecting of all power lines HT and LT side and testing on full load. (Lead distance to and fro = 36km)
Asif Engineering Works
M/S ZARGAR ELECTRICAL
M/S BHAT ENTERPRISES
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .