Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance 11 ANUPAM VIHAR ENGINEERS ENCLAVE GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | L1 | Admitted-Finance | ||
| 2 | L2₹2.2 L+₹6,834.65 (3.20%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.2 L+₹6,873.93 (3.22%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.2 L+₹9,427.10 (4.42%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.3 L+₹18,265 (8.56%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
1 Dec 2025, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Lane with interlocking tiles from baba raja mandlik towards choraha chowk via hans raj (gullu ji) house wno 1
2025_RDPR_296122_5
e-NIT No.242/REW/K of 2025-26 Dated 24/11/2025
Open Tender
Civil Works
Percentage
30 days
Dinga Amb
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹7,840
15 Dec 2025
24 Nov 2025
2 Dec 2025
24 Nov 2025
1 Dec 2025
24 Nov 2025
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil :
Providing and laying dry stone aggregate using 40mm Nominal Size Angular aggregates
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge.
Carriage of Materials avg. lead by M.T including loading, unloading and stacking Sand and Aggregate 7km by MT
Add Cost of Sign Board
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_959183.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .