Tender Value
₹2.4 Cr
EMD Value
₹3.6 L
Closing Date
17 May 2025, 9:30 pmClosed
Public Works Department
Improvements to Mudagal-Kudithini Road (SH-29) from km 87.00 to 88.70 (Fort Entrance to New Bus stand) in Kampli town limits under 5054-SH Improvements
PWD/2024-25/RD/WORK_INDENT19202
PWD/2024-25/RD/WORK_INDENT19202
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Ballari
₹5,000
₹3.6 L
8 May 2025
8 May 2025
19 May 2025
14 May 2025
12 May 2025
Improvement of Road from Ch. 87.000km to 88.730km (Flexible pavement)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Clearing and grubbing road land including uprooting rank
vegetation, grass, bushes, shrubs, saplings and trees girth up to
300 mm, removal of stumps of trees cut earlier and disposal of
unserviceable ...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Compacting original ground supporting embankment : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth o...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (COMMON SR 2023-...
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading,...
Granular Sub-Base
A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
Wet Mix Macadam (Plant mix method)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical ...
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on Prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0....
Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned w...
Filling Pot-holes and Patch Repairs with Open-Graded
Premix surfacing, 20mm (using VG-30 Grade Bitumen)
Removal of all failed material, trimming of completed excavation to provide firm vertical faces...
Bituminous Macadam Grading - II for traffic less than 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with b...
Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with40/60 TPH capacity hot mix plant batch type using crushedaggregates of specified grading premixed with bituminous...
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectoris...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal ...
Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed ove...
Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (COM...
Kilometre Stone
Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary kilometer stone (precast)...
Reinforced cement concrete M15grade 200m stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (iii)200m stone (precast) (COMMON SR 2021-22, Vol-3 Page No...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...
Utility Ducts and Pipes
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and ...
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak p...
Providing, fabricating and fixing at site various diameter MS MJ ends to suit CI / DI pipe as per the sketch . The cost is inclusive of all materials, i.e, rubber 'O' rings, flanges, bolts and nuts, c...
Supply and delivery at site special moulded variety PVC service saddles Supply and delivery at site special moulded variety PVC service saddles as per IS 7834/ 1987 and fabricated as per IG124/ 1984 w...
Supply and delivery at site special moulded variety PVC tee as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments (COMMON SR 2023-24, Vol-5, P.NO -117, SL. ...
Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Construction of Box Culvert - 1V 5.0mX2.0mX12m at Ch.87.820km
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-char...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Appendix I - Additionalities for Formwork, Centering & Scaffolding -Bridges-SI.No.6-Box Culvert 20% (volume-1 Pg No:112) For Depth of Key Slab ---- including cost of all materials, with all lead and l...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Appendix I - Additionalities for Formwork, Centering & Scaffolding -Bridges-SI.No.6-Box Culvert 20% ((volume-1 Pg No:112) ---- including cost of all materials, with all lead and lifts, loading and un-...
Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The ...
Appendix I - Additionalities for Formwork, Centering & Scaffolding -SI.No.11- Earth Retaining structures 10% (volume-1 Pg No:112) For Retaining Wall ---- including cost of all materials, with all lead...
Provision of an Reinforced cement concrete crash barrier at the bridge deck & approaches to bridge structure, constructed with Reinforced cement concrete with TMT reinforcement conforming to MORT&H sp...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than ...
Back filling behind abutment, wing wall and return wall
complete including compaction as per drawing and Technical
Specification . A Granular material 710.1.4.of IRC:78 &2200 (COMMON SR 2023-24 Vol-3,...
Granular Sub-Base A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification 2700 (COMMON SR 2023-24,Vol-3 P.NO -121, SI.No -13.8) ---- including cost of all materials, with ...
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) 1500, 1600, 1700 & 2704 (COMMON SR 2023...
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) 2702 (COMMON SR 2023-24 Vol-3, P.NO -121, S...
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towar...
Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying ...
Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification 2705 (COMMON SR 2023-24 Vol-3, P.NO -121, SI.No -13.7) ---- including cost of all materials, with all lead and...
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applyin...
Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (COM...
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material i...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Maintenance of Culverts at Ch.89.850km, 87.120km and 87.820km
Maintenance of Culverts Slab type :- Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and
Protection works as per drawing and technical ...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (SR 2023-24, Vol-2 SL.No. 5.4, P. No. 9) ---- including cost of all materials, wit...
Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, includi...
Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (COMMON SR 2023-24, Vol-3 Sl.No.8.10, P.No - 66) ---- including cost of all ...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
ROAD MAINTANANCE FOR 3rd, 4th & 5th YEAR
Road Maintenance for 3rd year for road with BM+SDBC as wearing coat Maintenance of road for 3rd year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by ...
Road Maintenance for 4th year for road with BM+SDBC as wearing coat Maintenance of road for 4th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by ...
Road Maintenance for 5th year for road with BM+SDBC as wearing coat Maintenance of road for 5th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by ...
Pole Shifting PART-A Labour
RCC Pole - 9 Mtr Long, 145 Kg WL ELE SR 2023-24, (Page No- 1, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and...
Horizontal X-arms with HTSTS ELE SR 2023-24, (Page No- 1, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-loadin...
LT 4 Pin Cross Arm with clamps, bolts, nuts and
washers ELE SR 2023-24, (Page No- 5, BESCOM V Cost Data Sheet-1,) ---- including cost of all materials, with all lead and lifts, loading and un-loading...
No.15 Strain Insulator ELE SR 2023-24, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and u...
Releasing & Restringing of Conductor ELE SR 2023-24, (Page No- 3, BESCOM IV ,) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of la...
Spiral Earth Electrode ELE SR 2021-22, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and ...
Fish Plate-MS ELE SR 2021-22, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading ...
Anchor Rod using 12mm round/GI ELE SR 2021-22 (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-loading ...
Turn buckle (GI) ELE SR 2021-22, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading an...
G.I Grounding pipe,B-Class, 4 ELE SR 2021-22, (Page No- 17, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-l...
Pole Shifting PART-A Material
RCC Pole - 9 Mtr Long, 145 Kg WL ELE SR 2023-24, (Page No- 1, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and...
Horizontal X-arms with HTSTS ELE SR 2023-24, (Page No- 1, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-loadin...
11 kV, 5 kN Composite/Polymeric Pin Insulator ELE SR 2023-24, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-loading cha...
LT 4 Pin Cross Arm with clamps, bolts, nuts and
washers ELE SR 2023-24, (Page No- 5, BESCOM V Cost Data Sheet-1,) ---- including cost of all materials, with all lead and lifts, loading and un-loading...
1.1 kV Ceramic Pin Insulator (Shell only) ELE SR 2023-24, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-loading...
1.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator ELE SR 2023-24, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-loading c...
No.8 Strain Insulator ELE SR 2023-24, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and...
No.15 Strain Insulator ELE SR 2023-24, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and u...
Releasing & Restringing of Conductor ELE SR 2023-24, (Page No- 3, BESCOM IV ,) ---- including cost of all materials, with all lead and lifts, loading and un-loading charges, cost of la...
Spiral Earth Electrode ELE SR 2021-22, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and ...
Fish Plate-MS ELE SR 2021-22, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading ...
Anchor Rod using 12mm round/GI ELE SR 2021-22 (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-loading ...
Turn buckle (GI) ELE SR 2021-22, (Page No- 2, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading an...
G.I Grounding pipe,B-Class, 4 ELE SR 2021-22, (Page No- 17, PART - II Distribution (ESCOMs),) ---- including cost of all materials, with all lead and lifts, loading and un-l...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .