Loading…
Loading…
Tender Value
Refer Docs
Closing Date
29 May 2026, 10:55 amClosed
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
58
3 conditions · 3 needing a document upload
Bidders to provide OEM authorisation or dealership certificate along with offer. Failing which offer may not be considered.
Clause wise compliance of the specifications for all the items in the annexure should be provided along with offer. Failing which offer may not be considered.
Offered make and model for all the items in the annexure should be provided along with offer. Failing which offer may not be considered.
24 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Make in India Preference Policy Please refer para 16.0 Part B of Southern Railway tender conditions uploaded in IREPS.
HSN CODE :Tenderers should mention the HSN CODE of the item and Rate of GST applicable. Firm's GST NO. and Firm's Banker details viz., Name & Address of the Bank Account No.., IFSC Code. and MICR No. in their E-Bid.
Tenderers shall confirm the following declaration failing which the offers are likely to be ignored. " I have read the clause regarding restrictions on procurement from a bidder of a country which shares a land border with India.I certify that this bidder is not from such a country or,if from such a country,has been registered with the Competent Authority.I hereby certify hat this bidder fulfills all requirements in this regard and is eligible to be considered.Where applicable,evidence of valid registration by the Competent Authority shall be attached."
PENALTY FOR DELAY IN COMMISSIONING: The Contractor or his agents shall commission the machine within the 30 days from date of supply. This time frame will be applicable from the consignee in respect of readiness and installation of the machine in cases where the machine is to be installed by the consignee. The time schedule includes the time for installation in cases where installation is also to be undertaken by the supplier. The time allowed for commissioning of machine by the contractor or his agent shall be deemed to be the essence of the contract. In case of delay in commissioning of the machine on the part of Contractor, the Purchaser shall be entitled to recover and the Contractor shall be liable to pay pre estimated liquidated damage at the rate of 2% of the total contract value of machine not commissioned for each and every month or part thereof for which commissioning is delayed. Provided always that the entire amount of liquidated damages to be paid under the provision of this clause shall not exceed 10% of the total contract value. After expiry of 5 months period from the date of default i.e. from the date of commissioning provided in the contract, purchaser will be at liberty to invoke the PG Bond submitted by the supplier. Continuance of commissioning work after expiry of stipulated time will also not absolve the contractor from the liquidated damages as stated above. The decision of the Purchase Office, whether the delay in commissioning has taken place on account of reasons attributed to the contractor shall be final. During warranty period, the supplier or his authorized agent shall attend for break down as soon as possible, but in no case later than 72 hours of receipt of intimation of the breakdown. (b) Maximum down time during the warranty period will be 2%. (c) A penalty of @1/2% (half percent) of the price of the store (including elements of taxes, duties, freight, etc) per week or part of the week will be levied for delay in response time for attending and rectification of faults beyond specified time of 72 hours during the warranty period. (d) Maximum penalty to be levied on account of warranty failure will be 10% of the contract value calculated during whole of the warranty period and after that if there is any delay on the part of the supply, purchaser shall be entitled for encashment of WG bonds or from other bills. In such cases ,the bad performance of the firm during the warranty period, the same should be recorded and circulated to all Railways. The same should be given due regards in deciding future orders on the firm and when evidence to the contrary is not available, the firm offer may be even rejected
Performance Guarantee for the warranty obligations, of 10% of the contract value to be submitted at time of supply valid for 3 months beyond the free warranty period. The consignee officials to ensure that the Performance Guarantee is received and given to purchase office before releasing CRN
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1) Door delivery to consignee. Material to be delivered to AMM/Diesel Stores Depot/Erode along with delivery challan , ((RS)/LS/ERODE, Loco Shed, Chennimalai Road, Erode - 638002,) . 2). Unloading the materials to be arranged by firm. 3)Material has to be strictly supplied within delivery date. Otherwise, Liquidated damage (LD) will be imposed viz. 0.5 percentage per week, upper limit being 10 percentage on delayed supply. 4) E-way bill to be submitted along with supply if value of material is more than Rs. 50,000/-. If the material is further not supplied within 3 months after the delivery due date mentioned in P.O, then this purchase order will get cancelled without intimation to firm. 5. Along with supply of material, firm has to submit the following documents in original for passing of bill: (a) Delivery Challan. (b) Original Tax Invoice. (c) GST Annexure. (d) GST Declaration. (e) Warranty/Guarantee/Calibration Certificate if specified. . (f) Test Certificate if specified.
Training to vendors on Environment: 1) Eco-friendly Packing such as Gunny Bags/Carton box is better. Avoid Polyethylene bags of thickness < 50micron. 2) Reduce Logistic Vehicle: Usage of Railway Parcel Service is preferable 3) Use of alternate materials like cotton bags/gunny bags(Jute bags) in place of plastic, polythene and wooden packing material shall be followed to the extent possible. It is expected that this would help in reducing the use of polluting materials.
Ambiguous offer will be summarily rejected. Terms of offer must be pecific and unambiguous.
1 location across Tamil Nadu · 1 Set total
SAFETY HANDWEAR FOR WORKING ON HV TESTING MACHINE RANGE-(0-9KV), NATURAL
58265079~NCR
58265079
Limited - Indigenous
Goods
Tamil Nadu
₹0
Exempted
29 May 2026
21 May 2026
1 item · 1 Set total
Supply installation and commissioning of Advance Electronic LAB Testing and handling setup as per annexu re attached. Note : 1) Firm should submit authorized dealership certificate along with tender. 2)Certificate of compliance of the specifications for all the items in the annexure should be provided during tender & supply of material. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/ELE/DSL/ED, SR | Tamil Nadu | 1.00 Set |
| Total | 1 Set | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5691603.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .