Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.4 LAdmitted-Finance | -43.00% | ₹47.4 L | L1 | Admitted-Finance |
| 2 | L2₹51.3 L+₹4.0 L (8.40%)Admitted-Finance | -38.21% | ₹51.3 L+₹4.0 L (8.40%) | L2 | Admitted-Finance |
| 3 | L3₹58.2 L+₹10.8 L (22.8%)Admitted-Finance AT PO KARABARA PS FATEGARH DIST NAYAGARH 752063 | NAYAGARH | ODISHA | 752063 | -29.99% | ₹58.2 L+₹10.8 L (22.8%) | L3 | Admitted-Finance |
| 4 | L4₹59.3 L+₹12.0 L (25.3%)Admitted-Finance | -28.59% | ₹59.3 L+₹12.0 L (25.3%) | L4 | Admitted-Finance |
| 5 | L5₹60.0 L+₹12.7 L (26.7%)Admitted-Finance | -27.77% | ₹60.0 L+₹12.7 L (26.7%) | L5 | Admitted-Finance |
Tender Value
₹83.1 L
EMD Value
₹83,100
Closing Date
4 Aug 2026, 5:00 pmClosed
Executive Engineer
O/o the E.E, Drainage Division, Khordha
Improvement to Nalla with Structures
2026_CEDC_136412_2
e-Procurement Notice No.02 (DD-KHR) OF 2026-27
National Competitive Bid
Civil Works - Others
Percentage
270 days
Daspalla Block of Nayagarh District
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹83,100
Yes
21 Aug 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
20 Jul 2026 - 4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of Drain by mechanical means in all kinds of soil including stony earth gravel, morum etc. inter spared with boulders up to 0.50 cum size with all lifts, delfts including trimming of slopes and depositing the excavated materials away on both sides of the drain including spreading and leveling the earth in layers not exceeding 22.5 cm including hire and running charges of all the macheniries, T&p,taxes, cess etc as per direction of Engineer in charge. | 2,06,928.33 | Cum | 35.6 | ₹73,66,648.55 |
| 2 | Earth work in excavation of foundation by mechanical means in all kinds of soil including stony earth gravel, morum etc. inter spared with boulders up to 0.50 cum size with all lifts, delfts including trimming of slopes and depositing the excavated materials away on both sides of the drain including spreading and leveling the earth in layers not exceeding 22.5 cm including hire and running charges of all the macheniries, T&p, taxes, cess etc as per direction of Engineer in charge. | 144.63 | Cum | 42.7 | ₹6,175.7 |
| 3 | Filling foundation and plinth with sand watered and rammed in proper way including all cost, conveyance royalty labour charges of materials and T & P required for materials etc. complete as per direction of Engineer-in-charge. | 3.54 | Cum | 1,001.58 | ₹3,545.59 |
| 4 | Random rubble hard granite stone masonry in sand grouted in foundation and plinth with hard granite stone 30cm and above size and sand grouting including cost, conveyance, labour and royalty etc complete as per the direction of Engineer-in-charge. | 25.09 | Cum | 4,172 | ₹1,04,675.48 |
| 5 | Cement concrete M15 grade with 40mm & down graded hard granite crusher broken metal including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries, T&P required for the work site proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 4.99 | Cum | 6,175.64 | ₹30,816.44 |
| 6 | Cement Concrete M20 with 20mm nominal hard granite crusher broken chips including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries, T&P required for the work site proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 55.1 | Cum | 7,003.41 | ₹3,85,887.89 |
| 7 | Cement Concrete M25 with 20mm nominal hard granite crusher broken chips including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries, T&P required for the work site proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 23.87 | Cum | 7,432.23 | ₹1,77,407.33 |
| 8 | Supplying, fitting including straightening, Cutting, Bending and Binding the M.S/Tor reinforcement for R.C.C. work and tying the grills and placing in position including cost, conveyance of M.S/Tor rod and binding wire 18 to 20 gauge quality control teting, loading unloading including cess etc complete as per direction of Engineer -in-charge. | 14.15 | Rtm | 7,820.03 | ₹1,10,653.42 |
| 9Rigid & smooth centering and shuttering fo R.C.C/C.C works including false work & dismantling them after casting including cost, conveyance of all materials including cess and labour etc complete as per direction of the Engineer-in-charge. | |||||
| 9.01 | R.C.C Foundation and plinth band, fottings, bases of columns. mass concrete, precast slabs etc | 138.96 | Sqm | 249.82 | ₹34,714.99 |
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.48 MB
DTCN_03MangalpurNALLA.pdf
Tender Documents • 1.88 MB
BOQ_602308.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .