| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-AOC | 1 | Accepted-AOC Accepted | |
| 2 | 2₹14.9 L+₹2,523.72 (0.17%)Rejected-AOC | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SANTHOSHKUMAR CONTRACTOR L1 | SARAVANAKUMAR CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Part 01 : Construction of Waitingshed, Culvert and Providing Paverblock Pavement at Keelmathinipatty burial ground in Sriramapuram panchayat Estimate Amount Rs.15.00 Lakhs | |||||
| 2.00Waiting shed | |||||
| 3.00 | Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete. | 14.84 | cum | 246.52 ₹3,658.36 Lowest | 250 ₹3,710 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. | 4.63 | cum | 5,117.95 ₹23,696.11 Lowest | 5,200 ₹24,076 |
| 5.00 | Refilling the excavated earth including cost and conveyance of all matials to site and all labour charges etc., complete. | 6.53 | cum | 42.85 ₹279.81 Lowest | 42.85 ₹279.81 Lowest |
| 6.00 | Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete. | 11.79 | cum | 5,953.41 ₹70,190.7 Lowest | 5,953.41 ₹70,190.7 Lowest |
| 7.00Supply & erection of centering for sides & soffits of all R.C.C. works including cost & conveyance of all materials to site and all labour charges etc., complete. | |||||
| 8.00 | Below GL | 14.48 | sqm | 516.5 ₹7,478.92 Lowest | 516.5 ₹7,478.92 Lowest |
| 9.00 | Above GL | 79.35 | sqm | 1,033 ₹81,968.55 Lowest | 1,033 ₹81,968.55 Lowest |
| 10.00 | Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. | 0.7 | mt | 89,912.94 ₹62,939.06 Lowest | 89,912.94 ₹62,939.06 Lowest |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
5 Aug 2025, 6:00 pmClosed
Block Development Officer(BP)
Panchayat Union Vedasandyur
Construction of Waitingshed, Culvert and Providing Paverblock Pavement at Keelmathinipatty burial ground in Sriramapuram panchayat
2025_RDTN_586690_1
13/2025/A7
Open Tender
Civil Works - Buildings
Item Rate
90 days
Vedasandur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
12 Aug 2025
29 Jul 2025
5 Aug 2025
29 Jul 2025
5 Aug 2025
29 Jul 2025
Amount
Part 01 : Construction of Waitingshed, Culvert and Providing Paverblock Pavement at Keelmathinipatty burial ground in Sriramapuram panchayat Estimate Amount Rs.15.00 Lakhs
Waiting shed
Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Refilling the excavated earth including cost and conveyance of all matials to site and all labour charges etc., complete.
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply & erection of centering for sides & soffits of all R.C.C. works including cost & conveyance of all materials to site and all labour charges etc., complete.
Below GL
Above GL
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete.
RCC 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials & all labour charges etc., complete.
Cement Concrete 1:2:4 mix using 20mm ISS HBG Metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labor charges etc complete.
Construction of Culvert
Earthwork excavation and depositing on bank with an initial lead and lift in all classes of soils and sub soils except in hard rock including all labour charges etc . Complete.
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Below sill
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Above sill
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Above sill
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. Above sill
Supply & erection of centering for sides & soffits of all R.C.C. works including cost & conveyance of all materials to site and all labour charges etc., complete.
Below Sill
Above Sill
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete.
Supplying and Filling of Gravel including cost & conveyance of steel as per std. Specification etc., complete.
Providing Paver Block Pavement
Earthwork excavation for foundation in all clauses of soils and subsoils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, struting and bailing out water wherever neccessary and refilling the sides of foundation
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying and erecting centering for sides & soffits including supports and strutting up to 3.29m height for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90cm x 60cm and 10 gauge stiffened welded with mild steel angl
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and
Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Spec
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SARAVANAKUMAR CONTRACTOR (BID ID -1419881)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .