Tender Value
₹15.5 L
EMD Value
₹19,400
Closing Date
25 Jul 2026, 5:00 pm
STAFF OFFICER MINING
OFFICE OF THE STAFF OFFICER MINING
Preparation/ Heightening and Widening of roadway for marching of (Continuous Miner) CM from Panel C2 to C3 AND shifting of pump for de-watering of panel in VI Top (Combined) Seam at Bangwar UG Mine
2026_SECL_361832_1
SECL/SGP/SO(M)/2026-27/NIT-738 dated 08-07-2026
Open Tender
Civil Works - Others
90 days
BANGWAR UG MINE
as per NIT
8 documents required · 8 mandatory
₹19,400
8 Jul 2026
8 Jul 2026
27 Jul 2026
8 Jul 2026
25 Jul 2026
9 Jul 2026
8 Jul 2026 - 18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PARTICULAR | |||||
| 1.01 | Roof bolting in u/g including drilling by power drill manually with wet drilling arrangement
(1.50m – 1.80m length with 27mm dia, drill bit for anchoring 20/22 mm dia roof bolts with
resin capsules and fitting of bearing plates and W-strap (as and when required) and tightening
of nuts etc complete.
Note: Hydraullic Roof Bolting Machine wit hydraullic oil & wet drilling arrangement, drill rod, drill bit will be provided by contractor.
(Spacing of bolt to bolt 1.2m Dip/Rise and Level, Total Length 285m/1.2m = 237.50 bolt in a Row @4 Row = 950 Bolt and 25% additional for junction & other support support = 950 + 237.50 = 1187.50 bolt or say 1188 Bolt.) | - | Bolt | 275.49 | - |
| 1.02 | Drilling, Blasting & mucking manually in Stone (Drilling by power Drill | 1 | cubic mtr | 2,172.98 | ₹2,170.81 |
| 1.03 | Cleaning/Removal of debris/Stone from galleries and stacking within 50m distance | 1 | cubic mtr | 545.17 | ₹544.62 |
| 1.04 | Groove cutting in stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50m.distance.
Cutting in hard stone by chisel & hammer. (Drain cutting along 38LE from 23D TO 32 D, 237.00 x 0.50 x 0.50 = 59.25 m3 | - | cubic mtr | 6,707.91 | - |
| 1.05 | Shifting of face pump (11LPS) with all accessories i.e. motor starter, power cable, sectiopn pipe and extension pipe with a lead of 30m. In same working section including dismantling, carrying manually, and assembling the same as per instruction of Exe. in charge(Nos. of shifting from 35D to 57D = 550m/30m per shifting = 18 Set/shifting of 01 no. Pump | - | Set | 7,793.5 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.56 MB
BOQ_374720.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid