| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.3 CrAccepted-AOC F 31 INDUSTRIAL AREA PHASE VIII SAS NAGAR MOHALI 160071 | S A S NAGAR | PUNJAB | 160071 | ₹18.3 Cr | L1 | Accepted-AOC Total awarded cost |
| 2 | L2₹18.4 CrRejected-AOC | ₹18.4 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹18.9 CrRejected-AOC | ₹18.9 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹26.7 CrRejected-AOC | ₹26.7 Cr | L4 | Rejected-AOC L4 |
Tender Value
₹18.9 Cr
EMD Value
₹37.9 L
Closing Date
10 Jan 2020, 6:00 pmClosed
AGM ENGG ELECT
Asstt. General Manager Engg. Elect Airports Authority of India OFFICE of ED Engg. SR CHQ, Rajiv Gandhi Bhawan, New Delhi 110 003
As per NIT
2019_AAI_36661_1
AAI/CHQ/ED/SR/CHN/STP/REV/19
Open Tender
Electrical Works
212 days
CHENNAI
As per NIT
8 documents required · 8 mandatory
₹3,360
AIRPORTS AUTHORITY OF INDIA
₹37.9 L
Yes
29 Jun 2021
4 Dec 2019
16 Jan 2020
4 Dec 2019
10 Jan 2020
5 Dec 2019
5 Dec 2019 - 13 Dec 2019
Amount
SEWAGE TREATMENT PLANT (MBR- TECHNOLOGY)- CAPACITY-2.25 MLD
Design, supplying, installing, testing & commissioning of Sewage Treatment Plant (excluding excavation, back filling & disposal of surplus earth MS/Civil construction work) for the following duty, complete in all respects as per directions of Engineer in charge and as per Technical specification.
Nature of effluent - Sewage from toilets, kitchen shall be discharged into the STP. Design to take consideration of same.
Daily average flow - 112.5 Cum / hr.
Total Numbers of Trains-2 (2x1.125 MLD Each)
Working Hours of Plant 20 Hour and remaining hours will be as rest period and CIP period, if required / softener regenration etc
Inlet Parameters-Effluent Parameters before treatment
BOD5 - 100- 400 mg/L
S. Solids - 200- 450 mg/L
COD - 300- 1000 mg/L
Oil & Grease - 50-100 mg / L
Total Phosphorus - 15 mg/L
Total Nitrogen - 50 mg/L
Outlet Parameters-Effluent discharge standard after treatment
BOD5 - Less than 5 mg/L
S. Solids - Less than 5 mg/L
COD - Less than 30 mg/L
Oil & Grease - Less than 2 mg / L
Total Phosphorus - Less than 5 mg/L
Total Nitrogen - Less than 10 mg/L
Turbidity - Less than 2 NTU
E. coli - B.D.L (Below Detectable Level)
Hardness - Commercial Zero (less than 5 mg/L)
Screen chamber
Oil & Grease Trap with Skimmer
Sewage equalization tank/sump
Fine Screening
Anoxic Tank
Bioreactor Tank (D.O. shall be not less then 2 PPM)
MBR tanks
Permeate Tank
Backwash Tank
Sludge Holding Tank with Supernatant valve.
Soft Water Tank
Treated Water Tank
Plantroom Sump Platform and foundation for tanks and equipment Ladder, Railway, Cat work, Inserts, flanges, manhole cover etc.
Air Blowers, Pumps & equipment
Piping, valves etc
Electrical Panel & Cabling
Common plant room adjacent to STP.
TRAIN 1- 1125 cum/day Membrane
TRAIN 2 -1125 cum/day Membrane
Supply, installation, testing & commissioning of 1 No Stainless Steel SS-304 Perforated, Coarse (10 mm) & 1 Nos Fine Bar Screen(2mm) with suitable lifting(Mechnical type) arrangement (size 1000 mm wide x 600 mm high approx)-Manual Operation,complete in all respects as per directions of Engineer in charge.Capacity-190 cu.m/hr.
Designing, Supply, installation, testing & commissioning of Stainless Steel Mechanical perforated screw screen with automatic self cleaning system Size: 3 mm Type : Perforated screw screen with 3 mm opening MOC : SS-304, complete in all respects as per directions of Engineer in charge.
Designing, Supply, installation, testing & commissioning of Oil & Grease removal chamber of adequate capacity including belt type oil skimmer of suitable size with all fitting & accessories, complete in all respects as per directions of Engineer in charge.
Supply of MS hot dip galvanized puddle flanges in accordance to BS:10 table E as required to be provided (in the structural slab and wall) of various diameters. Puddle flanges shall be provided for all the structural component of the STP. The installation of the puddle flanges shall be carried out by the Civil contractor in accordance to the Civil GA drawing (to be prepared by the STP contractor) at the required levels & position; under the supervision of the STP contractor, complete in all respects as per directions of Engineer in charge.
Supply of plastic encapsulated step/foot rest (@ 300 mm c/C) with polypropelene compound injection molded around 12 mm dia (Fe-415) steel reinforcing bar. Provision of the foot rest is envisaged in various tanks/ components of the STP for the purpose of accessability. The installation of the foot rest shall be done by the civil contractor as per civil GA drawing, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of electronic type level indicator, instrumation and controller for automatic operation of the system with high/low level alarm complete with auxillary NO/NC contacts, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of sight tube (of 4.0 to 5.5 m length) with isolation valve at top/bottom, demarcation on tube & for making the installation complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of Dissolved Oxygen meter with all necessary auxillaries complete for satisfactory functioning, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of Turbidimeter with all necessary auxillaries complete for satisfactory functioning, complete in all respects as per directions of Engineer in charge.
Contractor shall ensure submission of detailed GA drawings (Plan & Section), P & I diagram, schematic diagram for the above mentioned component and additional component if so required for the complete working of the STP.
Supply, installation, testing & commissioning of Submersible Sewage, Non clog type having solid handling capacity of 80 MM. The pumps shall be of Non-self priming,single stage,centrifugal type, the impeller shall be of non-clog to provide pasaage of solid upto 80 mm. The pump housing,motor top, and impeller made of cast iron (EN-GJL-250). The shaft seal shall be of double mechanical seal bidirectional type incorporated in single unit cartridge seal system for easy replacement.The pump shall have stainless-steel clamp arrangement to enable quick and easy disassembly of pump from the motor unit for service.The pumps shall be with all accessories, motor of required capacity, Pressure gauge on delivery line with isolation cock, level controller (with wiring) to control the level of sump automatically with auto coupling & guide rail lifting assembly complete in all respect along with stand alone BMS Compatible panel & Float switches (N+1) complete in all respect with a minimum efficiency of 55%.
Sewage Sump pumps in Collection Well 15 LPS @20m (1 Set = 3W+1S) 15 KW Each. (T1,T2,T3,Cargo & Admin-Collection Well)
Supply, installation, testing & commissioning of non clogging submersible type pumps capable of handling solids of 20 mm. The pumps shall be of Non-self priming,single stage,centrifugal type, the impeller shall be of non-clog type to provide pasaage of solid upto 20 mm. The pump housing,motor top, and impeller made of cast iron (EN-GJL-250).The pump shall be suitable for auto / manual operation. The installation shall be complete with all necessary ancillaries & accessories including auto coupling & guide rail complete as required. (1Working + 1Standby)., along with stand alone BMS Compatible panel & Flooat switches (N+1) complete in all respects with a minimum efficiency of 55%.
Non clog Submersible Pump for pump room drainage Sump - 15 LPS @ 20 m Head (1 Set = 1W + 1S) 5.5 KW Each.
Submerssible Mixer in Anoxic Tank
Supply, installation, testing & commissioning of submersible mixer of MOC SS316 having the suitable Motor (HP) to agitate the sewerage in the Anoxic Tank, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of non clogging type pumps capable of handling solids upto 40 mm having C.I casing & C.I impeller complete with all accessories, motor of required capacity, Pressure gauge on delivery line with isolation cock, level controller (with wiring) to control the level of sump automatically. Pumps shall have following duty:Note:-IP ratings for all submerssible pumps shall be IP-67, complete in all respects as per directions of Engineer in charge.
Sludge handling capacity - 30-40 mm
Bioreactor feed pumps 1 Set –(1W+ 1S)
Flow rate = 26.5 LPS ( Each)
Head = 10-12 Mts
Pump KW = 7.5 (Each)
Providing, fixing, testing & commissioning of horizontal, centrifugal, non clog Sludge recirculation pump for the disposal of settled sludge from Membrane tank to Sludge Holding Tank & Anoxic Tank. The pumps shall have CI casing, CI Impeller & SS shaft & sleeve with mechanical rotary shaft seal connected by a flexible tier type coupling to TEFC induction motor mounted on a common channel base-plate with coupling guard, 150 mm dia pressure gauge with isolation cock on delivery line of each pump, suitable vibration eliminator pads of approved design. Motor to be suitable for 415± 10%, 3 Phase, 50 Hz AC Power supply including all necessary interconnecting piping, valves (Ball valve/butterfly valve & Non-Return Valve), level controller complete with Probs, dry running protection and other accessories complete as required, complete in all respects as per directions of Engineer in charge.
RAS/Drain Pump 1 Set – (2W+ 1S)
Sludge handling capacity - 7-10 mm
Flow rate = 59 LPS (Each)
Head = 10-12 Mts
Pump KW = 12.5 Each
Supplying, installing, testing & commissioning of horizontal / vertical centrifugal pumps CI Head & Base, C.I Impeller, mechanical seal along with motor, pressure gauge with isolation cock, Isolation valve, NRV on delivery line. Isolation valve(PN-10), stainer (with by-pass) at suction. Mechanical seal, suitable vibration elimination pads of approved design, drain pipe with valve (25 dia) for the pump. The pump shall be suitable for 415±10% volts 3 phase AC supply including necessary instrumation for inter locking the pumps with motorized 2 / 3 way valve, complete in all respects as per directions of Engineer in charge.
Membrane Permeate Cum Back Pulse Pumps with VFD on working pumps. 1 Set –(2W+1S)
Capacity : 15-17 LPS (Each)
Head : 10 M
Pump KW = 0.5 (Each)
Supply, installation, testing and commissioning of Centrifuge system-5.5 cu.m Capacity with Filter press feed pump – 2 No. (1 working + 1 standby)-Cap-1.5 LPS with 1 No. standby stator, interconnecting piping and poly dosing system.
Designing, Supply, installation, testing & commissioning of poly electro type dosing system comprising of 1000 ltrs HDPE/FRP/PE tank with 100 lph electronic metering type pump and SS agitator complete with motor, complete in all respects as per directions of Engineer in charge.
Designing,Supply, installation, testing & commissioning of MBR modules of ultra-filtration membranes with SS – 304 skid for housing the membranes & air grid for scouring the sludge, permeate` s S.S.-304 piping etc. complete as required. Membranes shall be reinforced hollow fibre capable of regular backwashing with and without cleaning chemicals to minimize pore fouling. At least 30lmh flux @ 25deg C shall be considered to arrive at total membrane area required to treat specified waste water quantity. The Membrane manufacturer should offer minimum 2 years full replacement warranty and additional 5 years of pro rate basis . Membrane shall be physically strong enough to withstand the operating conditions associated with continuous operation in an aerated tank of mixed liquor at concentrations up to 12000 mg/l. The membrane module and membrane cassettes shall be by one manufacturer. MBR module immersed type with permeate capacity of 95 M3/ Hr considering 20 Hour of operation per Day. The maximum pore size of the membrane shall be 0.04 micron. The cost of the MBR shall be inclusive of automation required for the working of complete plant. if any instrument is required as per membrane manufacturer, which is integral part fo the MBR optimum performance then the same shall be provided at no extra cost, complete in all respects as per directions of Engineer in charge.
Capacity of Module-2.25 MLD-( 1.125 MLD x 2 nos.)
Supply, installation, testing & commissioning of the PLC based control panel (Common for both stream) with interlocking arrangement with supply pumps,suction pumps,chemical cleaning tank, modulating or shut-off valves including necessary wiring, magnetic switches & sensors complete to make the system functional with following interlocking. The PLC should have minimum 30 minutes power backup, complete in all respects as per directions of Engineer in charge.
Suction pump stop Suction pump`s head loss greater then set suction head
Supply pump stop Suction pump stop & Chemical cleaning pump start
Suction pump`s head loss greater then set suction head
Suction pump`s suction header valve stop
Suction pump`s head loss greater then set suction head
Chemical pumps delivery valve open in suction pump`s suction header, complete in all respects as per directions of Engineer in charge.
Supplying, installing, testing & commissioning of vertical multi stage inline centrifugal Softener feed water pumps CI with CED coating Head & Base, SS-304 Impeller along with motor, pressure gauge with isolation cock, Isolation valve, NRV on delivery line. Isolation valve(PN-10), stainer ( with by-pass) at suction. Mechanical seal, suitable vibration elimination pads of approved design, drain pipe with valve (25 dia) for the pump.The pump shall have IE-5 permanent magnetic motor suitable for 415±10% volts 3 phase AC supply, complete in all respects as per directions of Engineer in charge.
Capacity : 5.0 LPS
Head : 35 M
Softener Feed Pumps- (1 Set = 2W + 1S) 3.0 KW Each.
Supply, installation, testing & commissioning of Water Softening plant (MSEP) for make-up water for cooling towers comprising of Frontal Piping and required Isolation valves for operation with brine ejector and plastic piping complete with 2 KL HDPE brine tank with SS Agitator and gear mounted motor connection for preparation of brine solution (1.5 m dia and 2.00 m high aproximate)with fittings and brine filtering media and complete charge of cation exchange resin as per speciftication for the capacity as given below. The Softner shall be Lateral Header system. Softner thichness shall be 6 mm and Dish will be 8 mm. The shells shall be painted with two coats of redoxide primer and a coat of seimens grey paint on the external surface with adequate sized legs duly fasteneed to the foundation, complete in all respects as per directions of Engineer in charge.
Water Flow - 5.0 LPS/ Softener System (1 Set = 2W+1S)
Incoming hardness 300 Mg/L
Working pressure 3.5 Kg/cm2
Test pressure 5.0 Kg/cm2)
Outgoing hardness less than 5 ppm
OBR - 650 M3/Softener
Resin Qty - 3600 Liters/Softener
Resin Type - 220 Na
Regeneration Period - 20 Hrs.
Supply, installation, testing & commissioning of High Flow UV system for tertiary water treatment. The UV chamber shall be internally & externally electro polished with double side flange, drain part & probe bar. The unit shall use quartz glass technology for superior UV transmission and specialized high intensity UV lamp rated for 16000 hour operation. The UV dosage shall be greater than 60,000 uW-Sec / sq.cm, complete in all respects as per directions of Engineer in charge.
Unit flow : 16 LPS (For T, T2 & T3-Terminals)
Unit flow : 8 LPS (For Admin & Cargo)
Unit flow : 10 LPS
Electrical Dosing pump diaphragm type MOC, PP, Elecronic of suitable range (LPM)
Chemical cleaning Pump for Membrane System - Hypo
Capacity :60- 555 LPH
Head : 10 M
Chemical cleaning Pump for Membrane System - Citric
Capacity : 117-215 LPH
Head : 10 M
Hypo dosing Pump for Permeate System
Supply, installation, testing & commissioning of 500 & 300 ltrs HDPE/FRP/PE tank with with chemical for cleaning of membrains complete as required.
Air diffusion system shall include the following:
2 Nos. twin type rotary Air Blowers with VFD (1 working & 1 standby) for equalization & sludge thickner tank of capable of delivering 325 m3/hr (each) of free air at 4500 mmwc driven through “V” belt or directly coupled through flexible coupling to a TEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply, complete in all respects as per directions of Engineer in charge.
3 Nos. twin type rotary Air Blowers with VFD (2 working & 1 standby) for Bio Reactor tank, capable of delivering 591 m3/hr (each) of free air at 5400 mmwc driven through “V” belt or directly coupled through flexible coupling to a TEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply, complete in all respects as per directions of Engineer in charge.
3 Nos. twin type rotary Air Blowers with VFD (2working & 1 standby) for MBR tank, capable of delivering 286-356 m3/hr (each) of free air at 5400 mmwc driven through “V” belt or directly coupled through flexible coupling to a TEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply, complete in all respects as per directions of Engineer in charge.
Air piping shall comprise of pipes droppers/ laterals with M S (epoxy coated) Header complete with all fittings such as tees, crosses, plugs, sockets, elbows, reducers, supports & clamps, puddle flanges etc cutting chases & making good. Contactor to submit detailed P & I indicating their proposal complete in all respects as per directions of Engineer in charge.
Non clog type air dispersion system capable of handling 3-5 cfm of air with oxygen transfer efficiency of 3-4% per/meter water depth. Air dispersion grid shall be assembled in modular form so that they can be replaced / repaired easily from plat form at the top. (Imported fine bubble membrane diffusers), complete in all respects as per directions of Engineer in charge.
Bronze Ball valve and air dispersion grid as required for STP as described above, complete in all respects as per directions of Engineer in charge.
Designing, Supply, installation, testing & commissioning of Air dispersion system shall be provided for equalization Sump/ tank, Aerobic digester cum Thickner & MBR Tank, complete in all respects as per directions of Engineer in charge.
Providing and fixing all piping (as described below) and isolation control valves for making the system complete, complete in all respects as per directions of Engineer in charge.
Submerged air piping: uPVC heavy duty Type B, conforming to IS 13592
Non Submerged air piping: GI (Heavy)
PVC piping : Tank overflow pipe & pump sewerage line
GI (Heavy) : Interconnecting pipe line after delivery header of pump/ filter.
Providing, fixing, testing and commissioning Magnetic/Integral Flow Meter with reading m3/hr, electrode material 316L, Hc, Hb, Ti, Ta, Liner material neoprene, conductivity greater than or equal to 5 µs/cm, highly accurate, wide measuring range, IP65, IP67 protection class, analogue output signal 4~20 mA, medium temperature range as suitable, Electrical power voltage 220 VAC, 50 Hz, 24 VDC with all integral parts with flanged ends including all necessary fitting such as threaded pieces, unions, pressure gauge and isolation cock, flanges piece for future removal, flanges / unions complete with all necessary testing charges and obtaining test certificates from municipal authorities, on following size pipe lines (1 no. strainer & 2 nos. pressure gauges shall be provided at inlet & outlet and cost shall be inclusive for the same). The meter shall comply to ISO 4064 standard, feasible for Sewage aplication. Meter shall be integrated with SCADA. (For measuring incoming flow and installation on delivery side of Raw Sewage feed pumps), complete in all respects as per directions of Engineer in charge.
150 mm dia-233 KL/Hr
100 mm dia
150 mm dia
Supply, Installation, Testing, & Commissioning of a pre-engineered, factory fabricated, assembled & tested, fully integrated, highly efficient pump, IE5 permanent magnet motors, skid mounted, complete ready-to-connect packaged variable speed pressure boosting system as follows.
a.a. In-Line, Multisage, centrifugal pumps with SS-304 casing chamber and impeller and SS-316 shaft, Cast iron with CED coated base & head with (IE-5) Permanent magenetic motor and integrated drives(with mechanical seal)
(Vendor to submit performance curves and technical catalog of the proposed model for review & information)
b. The packaged variable speed water pressure booster system should operate on proportional pressure control mode based on external flow meter connected to the pump controller. The system shall be complete with vertical multi stage centrifugal main pumps and pilot pump connected in parallel(pilot pump capacity should be designed for 20% of one main pump capacity), high efficiency IE 5 motors with integrated variable frequency drive for each pump, intelligent multi-pump controller. The controller shall be mounted in a control cabinet with an IP 41 enclosure of suitable rating, digital energy meter in the control panel; Modbus for BMS; hot Dipped Galvanised suction and delivery manifolds; isolation ball valves on suction and discharge of each pump; non return valve on discharge side of each pump; flow meter with 4-20mA output; hot dip galvanised common base frame; and diaphragm pressure vessel PN16.
c.A dedicated intelligent Multi-pump logic controller for control and monitoring of pumps shall be from the pump manufacturer with easy interface graphical 320 X 240 Pixels colour display unit with key function.Controller should operate on proportional pressure control mode based on variable flow demand to optimise the system performance. Pilot pump operation should be able to monitored and control from the Multi pump cotroller controller and same should be always operated as a lead pump in the sequence of operation.Pump curve data should be inbuilt with Multi pump controller to optimise the system performance. Controller should able to monitor multiple operating parameters (flow, inlet pressure, outlet pressure, instant flow estimation, cumulative flow and speed etc) to calculate best operating algorithm to pump sequence optimally.Mentioned features should be available, automatic pump alternations for run time equalization, Programmable number of starts/stops per hour to prevent pump hunting, Friction Loss Compensation, Redundant primary sensor for pressure monitoring, soft pressure built-up, log graph display for key paramters, Clock program for multiple set point for scheduled system operation. The system should be compatible with BMS through MODBUS.Complete Skid mounted system comprising of all accessories such as PLCs, pressure switches, pressure transducers, control wiring and any other necessary imports etc. (list to be provided by the vendor)
d. Precharged diaphram pressure vessel with food grade membrane, charging connection, connected to outlet header with necessary flanges, gaskets, isolating valves, nuts/bolts etc complete.
e. Set of accessories such as pressure switches, pressure transducers, inter connecting power & control cabling etc. complete
f. Accessories like pressure gauge, MS base frame (Synthetic enamel painted over a coat of primer), complete in all respects as per directions of Engineer in charge.
Flushing water hydropneumatic pumping system
For T1, T2 & T3 Terminals
No. of pumps 3 Nos (2W + 1S) 7.5 KW each.
No. of Pilot pumps 1 No. 3.0 KW each.
Water Flow Rate : 8.0 LPS (Combined Flow - 16 LPS)
Water Flow Rate of Pilot pump : 2.0 LPS
Head-70 M
For Admin & cargo
No. of pumps 3 Nos (2W + 1S) 5.0 KW each.
No. of Pilot pumps 1 No. 3.0 KW each.
Water Flow Rate : 4.0 LPS (Combined Flow - 8 LPS)
Water Flow Rate of Pilot pump : 2.0 LPS
Head-70 M
Supply, Installation, Testing, & Commissioning of a pre-engineered, factory fabricated, assembled & tested, fully integrated, highly efficient vertical multistage inline pump, IE5 permanent magnet motors, skid mounted, complete ready-to-connect system for Soft water transfer. The pump shall consist of Cast iron with CED coated base & head, SS-304 casing chamber and impeller and SS-316 shaft along with TEFC motor & mechanical seal, pressure transmitter, NRV, Isolation valve on delivery line. Isolation valve(PN-16), stainer at suction. The pump shall be suitable for 415±10% volts 3 phase AC. Supply, complete in all respects as per directions of Engineer in charge.
IE 5 permanent magnetic motor with integrated drives
Capacity : 5 LPS (Combined Flow - 10 LPS)
Head : 50-60 m
(1 Set = 2W + 1S) 5.5 KW each.
Supply, Installation, Testing, & Commissioning of a pre-engineered, factory fabricated, assembled & tested, fully integrated, highly efficient vertical multistage inline pump, IE5 permanent magnet motors, skid mounted, complete ready-to-connect system for Irrigation water transfer. The pump shall consist of Cast iron with CED coated base & head, SS-304 casing chamber and impeller and SS-316 shaft along with TEFC motor & mechanical seal, pressure transmitter, NRV, Isolation valve on delivery line. Isolation valve(PN-16), stainer at suction. The pump shall be suitable for 415±10% volts 3 phase AC. Supply, complete in all respects as per directions of Engineer in charge.
IE 5 permanent magnetic motor with integrated drives
Capacity : 8.0 LPS
Head : 40 m
2Nos= ( 1W + 1S) 5.5 KW each.
Providing, fixing, testing and commissioning of uPVC pipes High pressure threaded pipes confirming to ASTM D - 1785, including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
40 mm dia
150 mm dia
Supplying, fixing, testing and commissioning of following valves, gauges and strainers for water circulation as per specifications.Soft water lifting pumps valve shall be PN-16) complete in all respects as per directions of Engineer in charge.
BALL VALVE with CI body SS disc nitrile sheet & O - ring & PN 16 pressure rating as specified.
25 mm dia
Providing, fixing, testing and commissioning of GI C class pipes and fittings threaded pipes confirming to IS 1239, including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
50 mm Dia
65 mm Dia
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia (6 mm thick)
250 mm Dia (6 mm thick)
300 mm Dia (8 mm thick)
400 mm Dia (8 mm thick)
Providing, fixing, testing and commissioning of SS-304 Sch-20 pipes and fittings argon welded pipes, including all necessary fittings, jointing with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
300 mm Dia Sch-20
Providing, fixing, testing and commissioning of CI Hubless pipes and fittings pipes confirming to IS 15905, including all necessary fittings, couplings, jointing with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
200 mm Dia
Supplying, Installation, Testing and Commissioning of CI body flanged (both ends) type serviceable suction / Y strainer with (stainless steel / brass mesh) conforming to relevant IS specifications amended upto date complete including providing and fixing nuts, bolts, washers, gaskets etc. complete as required.
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
300 mm Dia
Supplying, Installation, Testing and Commissioning of Butterfly valves of PN 1.6 rating of following sizes with nitrile Bronze / G.M. seat duly ISI marked and stainless steel stem with lever/gear operation and cast iron body in powder coated finish for fire fighting application complete in all respects confirming to IS: 13095 as required.
400 mm dia
250 mm dia
200 mm dia
150 mm dia
100 mm dia
80 mm dia
65 mm dia
Providing, Installation, Testing and Commissioning of double flanged cast iron Non-Return Valve, PN 1.6 of following sizes confirming to IS : 5312 complete with rubber gasket, Gl bolts, nuts, washers etc. as required.
150 mm dia
80 mm dia
65 mm dia
Providing and fixing Puddle Flange made out of M.S. pipe heavy class sleeve 750mm long, threaded on both sides upto 50 mm dia and flanged ends(both side) above 65 mm dia pipes with 6mm thick M.S. plate 100mm wide welded alround in the centre of pipe as per detail complete in all respects The Puddle flange shall be hot dip galvanised after fabreication.
400 mm dia 6mm thickness
300 mm dia 6mm thickness
300 mm dia SS-304 Sch-20 6mm thickness
200 mm dia 6mm thickness
150 mm dia 5.4mm thickness
100 mm dia 5.4mm thickness
80 mm dia 4.85mm thickness
65 mm dia 4.50mm thickness
25 mm dia 4.05mm thickness
Supplying, installing, testing, commissioning of level Indiactors for Storage tanks with transparent pvc tube with float and ball valve complete in all respect as per direction of project incharge.
Supplying, installing, testing, commissioning of level controller for autonmation of pumping system having three levels probes complete in all respect including cabling up to pumps starter panel as per direction of project incharge.
Supplying, Installing testing and commissioning of non rendundant type PLC panel IP 67 Rated, with 7" HMI with Printing option for Automation of all Pumps and WTP elements required for theTertiary treatment, complete in all respects as per directions opf project incharge.
Supplying, installing, testing, commissioning of level switches for autonmation of pumping system having three levels probes complete in all respect including cabling up to pumps starter panel as per direction of project incharge.
Supplying, installing, testing, commissioning of Heavy Duty 600 mm dia CI double seal Cover and frame complete in all respect as per direction of project incharge.
Supplying, installing, testing, commissioning of 400 mm dia Pot Strainer complete in all respect as per direction of project incharge.
Supply, Erection, Testing and Commisioning of monorail for lifting, mobility, and necessary placement, repairs of membranes, suitable for 5 T load, as required for the satisfactory functioning , complete in all respects as per directions of Engineer in charge.
Supply, installation, testing and commissioning of Air Compressor Sytem with all necessary piping and other auxillaries to pneumatically operate the valves as required, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing and commissioning of Vacuum ejector for Priming Sytem with all necessary piping and other auxillaries as required, complete in all respects as per directions of Engineer in charge.
Providing, testing and commissioning of 100 mm dia dial type pressure gauge with pressure scale of 0 to 20 Kg / sqm. Provision of isolation ball valve shall also be included in the cost, complete in all respects as per directions of Engineer in charge.
Air Treatment System
for EqualizationTank
Designing, Supply, installation, testing & commissioning of STP exhaust odour control machine with ozone injection technology comprising of ozone generators working on outdoor air feed with multi plate type corona discharge plates,3 stage step controller, all necessary controls etc. Machine shall be UL E 337863 listed. Other details of the machine shall be as per technical specification
For Equalization Tank - (1000 CFM) - 1 Set - 1W+1S
Supplying, installation, testing and commissioning of SISW(Single Inlet Single Width) fan with PP Construction having suitable motor & VFD.
Capacity: 1000 CFM - 1 Set - 1W+1S
Supply, Installing , Testing and Commisssioning of 18 G SS 304 contact Chamber with inlet and outlet collar made out of SS 304 for accomodating SS duct complete in all respect including base frame and mounting arrangement as per direction of project In Charge
Supplying, installation, testing and commissioning of Sensors.
H2S Sensors mounted in weather proof enclosure
Ozone Sensors mounted in weather proof enclosure
Supplying, installation, testing and commissioning of Stainless Steel (hairline finish SS304) Ducting for STP exhaust odor control system with SSsupports, SS angle, SS hanging rods,SS nut bolts and all other allied accessories to complete the system. The SS sheet shall be Hailine finish with transverse jointsframes made out of SS304 angle.The system shall be complete with SS bends, SS blank off etc as required.Duct joints will be sealed with silicon sealent.
Stainless Steel Ducting Work -22 Gauge
Supply Installation, testing and commissioning of Stainless Steel (SS304) Low Leakage Motorized Shutoff Damper for STP exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Motorized Shutoff Damper (300 x 300mm)
Supply Installation, testing and commissioning of Stainless Steel (SS304) Manual Damper for STP exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Volume Control Manual Damper (300 x 300mm)
Supply & fixing of Round/Square Flexible Connector having silicone cloth & SS304 frame for blower inlet & outlet.
Supply & fixing of SS louver with bird screen
Size=400 x 400 mm
Supply Installation, testing and commissioning of Stainless Steel (SS304) Drain Port with ball valve & Drain plug.
Providing, fixing, testing and commissioning of SS304 Sch 20 pipes and fittings argon welded joints including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
300 mm dia
Supply Installation, testing and commissioning of Stainless Steel (SS304) Tank inlet air cowls with SS Bird screen
Inlet cowl with bird screen (300x 300 mm)
Stainless steel drain port with blankoff
Supply & fixing of SS Collar for fixing fan with SS 304 pipe
Supply of MS Base/Platform for equipment
for T1,T2,T3 Wet well
Supply, Installation, testing and commissioning of STP exhaust odour control machine with ozone injection technology comprising of ozone generators working on outdoor air feed with multi plate type corona discharge plates,3 stage step controller, all necessary controls etc. Machine shall be UL E 337863 listed. Other details of the machine shall be as per technical specification
For Wet Well - (500 CFM) - 1 Set - 1W+1S
Supplying, installation, testing and commissioning of SISW(Single Inlet Single Width) fan with PP Construction having suitable motor & VFD.
Capacity: 500 CFM - 1 Set - 1W+1S
Supply, Installing , Testing and Commisssioning of 18 G SS 304 contact Chamber with inlet and outlet collar made out of SS 304 for accomodating SS duct complete in all respect including base frame and mounting arrangement as per direction of project In Charge
Supplying, installation, testing and commissioning of Sensors.
H2S Sensors mounted in weather proof enclosure
Ozone Sensors mounted in weather proof enclosure
Exhaust Air Quality monitor
Supplying, installation, testing and commissioning of Stainless Steel (hairline finish SS304) Ducting for Wet well exhaust odor control system with SSsupports, SS angle, SS hanging rods,SS nut bolts and all other allied accessories to complete the system. The SS sheet shall be Hailine finish with transverse jointsframes made out of SS304 angle.The system shall be complete with SS bends, SS blank off etc as required.Duct joints will be sealed with silicon sealent.
Stainless Steel Ducting Work -22 Gauge
Supply Installation, testing and commissioning of Stainless Steel (SS304) Low Leakage Motorized Shutoff Damper for Wet Well exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Motorized Shutoff Damper (300 x 300mm)
Supply Installation, testing and commissioning of Stainless Steel (SS304) Manual Damper for Wet Well exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Volume Control Manual Damper (300 x 300mm)
Supply & fixing of Round/Square Flexible Connector having silicone cloth & SS304 frame for blower inlet & outlet.
Supply & fixing of SS louver with bird screen
Size=225 x 225 mm
Supply Installation, testing and commissioning of Stainless Steel (SS304) Drain Port with ball valve & Drain plug.
Providing, fixing, testing and commissioning of SS304 Sch 20 pipes and fittings argon welded joints including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
300 mm dia
Supply Installation, testing and commissioning of Stainless Steel (SS304) Tank inlet air cowls with SS Bird screen
Inlet cowl with bird screen (300x 300 mm)
Stainless steel drain port with blankoff
Supply & fixing of SS Collar for fixing fan with SS 304 pipe
Supply of MS Base/Platform for equipment
Supply & installation of 5 star BEE rated 365 Liters double door refrigerator complete in all respects.
ELECTRICAL WORKS FOR STP
Supply, Installation, Testing and Commissioning of cubicle LT panel as per IEC 61439-1 & 2, IP42, suitable for 415V+/-10%, 3 Phase, 4 wire 50 Hz AC supply system, form 4b construction, fabricated in compartmentalized modular design from CRCA sheet steel of 2 mm thick for frame work and covers, , plates i/c cleaning & finishing complete with powder coating in approved shade, having TPN Aluminium alloy bus bars for high conductivity, SMC bus bar supports,with short circuit withstand capacity of 35 KA for 1 sec , bottom base frame of not less than 75 mm thickness, fabrication shall be done in transportable sections, entire panel shall have a common 50 mm x 6 mm earth bar sized for prospective earth fault , solid / flexible connections from main bus bar to switchgears and from switchgear output to cable termination in cable alley with required size of AL conductors / bus bars and control wiring with 2.5 sqmm PVC insulated copper conductor cable (FRLS), cable alleys, cable gland plates , i/c providing following switchgears / accessories as per specifications. Panel shall be completed in all respect and must follow tech specs & drawings.
2 No.MCCB, 400Amps, (Ics= 100% Icu),4 Pole, 25 kA with microprocessor release unitwith O/L & S/C proteciton with current adjustability , with extended rotary handle as per technical specification. and with following accessories.
Each Incomer shall have one set of the following items:
1 No. digital MFM meter and one set of 3 nos. CTs of ratio 400/5A , Class I accuracy and 10 VA burden- 1set.
3 Nos.phase indicating LED lamps each with 2 amp back up MCB.
Indication lamps for ON/OFF/TRIP status of motors.
BUSCOUPLER
1 No. 400 Amp,4 Pole, 25 kA with microprocessor release unit with O/L & S/C proteciton with current adjustability as per specification.
BUSBARS
TPN aluminium bus bars of minimum 400 Amps capacity with heat shrinkable coloured sleeves and i/c, SMC bus bars supports at required intervals complete for cross section, size supports & their spacing etc. for withstanding fault level of 25 KA for 1 sec.
OUTGOING UNITS
a. Feeder Suitable for 15 KW, 4No.(3W+1S) motor including 160 amps TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA) for Sewage Sump Pumps in Collection well, complete in all respects as per directions of Engineer in charge.(T1,T2,T3,Cargo & Admin-Collection Well)
b.Automatic DOL starter suitable for 1.5 KW motor including 2.5-4 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA)- ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for automaic screen - 1 no., complete in all respects as per directions of Engineer in charge.
c. DOL starter suitable for 0.5 KW, motor including 1.5 - 2.5A TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C,contactor (Ics = Icu = 25 KA) , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Centrifuge , complete in all respects as per directions of Engineer in charge.
d.Automatic DOL starter suitable for 7.5 KW motor including 11-16 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA)- ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for air blower(MBR) - 3 no.(2W+1S), complete in all respects as per directions of Engineer in charge.
e.Automatic DOL starter suitable for 7.5 KW motor including 11-16 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 10 KA)- ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for air blower(eqt. & Sludge holding) - 2 no.(1W+1S), complete in all respects as per directions of Engineer in charge.
f.Fully automatic DOL starter suitable for 5.5 KW motor including 6.3-10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA)- ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for air blower (Bioreactor) - 3 no.(2W+1S), complete in all respects as per directions of Engineer in charge.
g.DOL starter suitable for 2.2 KW motor including 4-6.3 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA)- ,Contactor ,Overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators etc. for mixer (Anoxic Tank) - 2 no.(1W+1S), complete in all respects as per directions of Engineer in charge.
h. DOL starter suitable for 7.5 KW, 2No. (1W+1S) motor including 11 - 16 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C,(Ics = Icu = 25 KA)contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Bioreactor feed pumps , complete in all respects as per directions of Engineer in charge.
i. Star Delta starter suitable for 12.5 KW, 3 No.(2W+1S) motor including 40 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA), Contactor , Overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators etc. for RAS/Drain Pumps , complete in all respects as per directions of Engineer in charge.
j. DOL starter suitable for 0.5 KW, 3 No.(2W+1S) motor including 2 - 4.5 A TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA), Contactor , Overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators etc. for Permeate Cum Back Pulse pumps , complete in all respects as per directions of Engineer in charge.
k. DOL starter suitable for 5.5 KW, 2No.(1W+1S) motor including 6.3-10A TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Non clog Submersible Pump for pump room drainage , complete in all respects as per directions of Engineer in charge.
l. DOL starter suitable for 3.0 KW, 3No.(2W+1S) motor including 4-6.3 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch,digital ammeter with CT etc. for Softener Feed pumps, complete in all respects as per directions of Engineer in charge.
m. Feeder suitable for 5 KW,32A TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C, for UV system, complete in all respects as per directions of Engineer in charge.
n. Automatic DOL starter suitable for 0.5 KW, 1No. motor including 1-1.6 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Hypo Dosing Pumps, complete in all respects as per directions of Engineer in charge.
o. DOL starter suitable for 0.50KW, 1No. motor including 1-1.6 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Citric Dosing Pumps , complete in all respects as per directions of Engineer in charge.
p. Feeder suitable for 7.5 KW, 3No.(2W+1S) motor including 100 amps MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA) for Flushing water hydropneumatic pumps, complete in all respects as per directions of Engineer in charge. (for T1, T2 & T3)
q. Feeder suitable for 5.0 KW, 3No.(2W+1S) motor including 63 amps TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA) for Flushing water hydropneumatic pumps, complete in all respects as per directions of Engineer in charge. (for Cargo & Admin)
r. DOL starter suitable for 5.5 KW,3 no.(2W+1S) motor including 6.3 - 10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch,digital ammeter with CT etc. for Soft water transfer pump , complete in all respects as per directions of Engineer in charge.
s. DOL starter suitable for 5.5 KW, 2 no.(1W+1S) motor including 6.3-10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Irrigation water transfer pump, complete in all respects as per directions of Engineer in charge.
t. DOL starter suitable for 2 KW, 3No(2W+1S). motor including 4-6.3 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for ozone generatoring machine Equilization tank , complete in all respects as per directions of Engineer in charge.
u. DOL starter suitable for 1 KW, 3No(2W+1S). motor including 2.5-4 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for ozone generatoring machine for Wet Well , complete in all respects as per directions of Engineer in charge.
v. VFD starter suitable for 5 KW, 3No(2W+1S). motor including 9-13A TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for SISW fan Equilization tank , complete in all respects as per directions of Engineer in charge.
w. VFD starter suitable for 3 KW, 3No(2W+1S). motor including 4-6.3 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA), ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for SISW fan Wet Well , complete in all respects as per directions of Engineer in charge.
Spare MCB’s of following capacities
1- 63 amps 4P MCB’s - 4 Nos.
2- 32 amps 4P MCB’s - 4 Nos.
3- 63 amps TPN MCCB’s - 2 Nos.
4- 40 amps TPN MCCB’s - 1 Nos.
5- 10-16A TP MPCB - 2 Nos.
6- 24 - 32 A TP MPCB 2 Nos.
7- 32 Amp DP 5 Nos.
All outgoing MCCB shall be with adjustable O/L protection
All incomers and Buscoupler breakers shall be mechanical interlocked with suitable accessories.
All breakers breaking capacities shall be Icu=Ics upto 433 V.
Breaker ON,OFF & TRIP indication LED light with back up 2 Amp SP MCB for each Buscoupler & Outgoing.
1 Set Rotary operating mechanism and terminal extension spreaders for all the MCCBs.
All switch gear/panels sall be suitable for 25 KA rating.
All outgoing will have 96 sq mm size ammeter and CT.
All Starter units shall be provided with 3 level liquid level indicator.
All outgoing units to have ON/OFF status of pump.
All pumps to be provided with over load relay.
One No. of Single Phase preventer in incoming of panel.
All Starter/Feeder shall be BMS Compatible.
Necessary cable alleys, internal / cabling, wiring, cabling from MCC to various pumps / equipment and interlocking, earthing for all equipment shall also included
MCC for STP as described above
CABLE and Cable termination (2.25 MLD STP)
a) Cable
Supply Installation Testing and Commissioning of 1.1 KV grade,4 core, copper , armoured, XLPE confirming to IS 7098 part-I including laying of the cable in ground/wall/surface/cable tray/trench etc.as per the requirement in accordance with technical specification complete in all respect as per the direction of engineer incharge
Including the accessories as mentiioned below.
Capacity - As per Control Panels and machines to be connected.
Control Cable - Multi core Copper armoured (No. of cores to be decided as per control panel, Machine to be connected.
b) Cable Termination
Double compression heavy duty glands and copper lugs as required
c) Earthing Suitable plate/pipe Eathing for equipments as per IS 3043 as per requirement complete in all respect as required.
SITC Cable , termination , earthing as mentioned above
SEWAGE TREATMENT PLANT (MBR- TECHNOLOGY)- CAPACITY-1.20 MLD
Design, supplying, installing, testing & commissioning of Sewage Treatment Plant (excluding excavation, back filling & disposal of surplus earth MS/Civil construction work) for the following duty, complete in all respects as per directions of Engineer in charge and as per Techical Specification.
Nature of effluent - Sewage from toilets, kitchen shall be discharged into the STP. Design to take consideration of same.
Daily average flow - 60 Cum / hr.
Total Numbers of Trains-2 (2x0.6 MLD Each)
Working Hours of Plant 20 Hour and remaining hours will be as rest period and CIP period, if required / softener regenration etc
Inlet Parameters-Effluent Parameters before treatment
BOD5 - 100- 400 mg/L
S. Solids - 200- 450 mg/L
COD - 300- 1000 mg/L
Oil & Grease - 50-100 mg / L
Total Phosphorus - 15 mg/L
Total Nitrogen - 50 mg/L
Outlet Parameters-Effluent discharge standard after treatment
BOD5 - Less than 5 mg/L
S. Solids - Less than 5 mg/L
COD - Less than 30 mg/L
Oil & Grease - Less than 2 mg / L
Total Phosphorus - Less than 5 mg/L
Total Nitrogen - Less than 10 mg/L
Turbidity - Less than 2 NTU
E. coli - B.D.L (Below Detectable Level)
Hardness - Commercial Zero (less than 5 mg/L)
Sewage treatment plant shall include the following items:
(All tanks constructed in R.C.C.)
Screen chamber
Oil & Grease Trap with Skimmer
Sewage equalization tank/sump
Fine Screening
Anoxic Tank
Bioreactor Tank (D.O. shall be not less then 2 PPM)
MBR tanks
Permeate Tank
Backwash Tank
Sludge Holding Tank with Supernatant valve.
Soft Water Tank
Treated Water Tank
Plantroom Sump Platform and foundation for tanks and equipment Ladder, Railway, Cat work, Inserts, flanges, manhole cover etc.
Air Blowers, Pumps & equipment
Piping, valves etc
Electrical Panel & Cabling
Common plant room adjacent to STP.
TRAIN 1- 600 cum/day Membrane
TRAIN 2 -600 cum/day Membrane
Supply, installation, testing & commissioning of 1 No Stainless Steel SS-304 Perforated, Coarse (10 mm) & 1 Nos Fine Bar Screen(2mm) with suitable lifting(Mechnical type) arrangement (size 1000 mm wide x 600 mm high approx)-Manual Operation,complete in all respects as per directions of Engineer in charge.Capacity-100 cu.m/hr.
Designing, Supply, installation, testing & commissioning of Stainless Steel Mechanical perforated screw screen with automatic self cleaning system Size: 3 mm Type : Perforated screw screen with 3 mm opening MOC : SS-304, complete in all respects as per directions of Engineer in charge.
Designing, Supply, installation, testing & commissioning of Oil & Grease removal chamber of adequate capacity including belt type oil skimmer of suitable size with all fitting & accessories, complete in all respects as per directions of Engineer in charge.
Supply of MS hot dip galvanized puddle flanges in accordance to BS:10 table E as required to be provided (in the structural slab and wall) of various diameters. Puddle flanges shall be provided for all the structural component of the STP. The installation of the puddle flanges shall be carried out by the Civil contractor in accordance to the Civil GA drawing (to be prepared by the STP contractor) at the required levels & position; under the supervision of the STP contractor, complete in all respects as per directions of Engineer in charge.
Supply of plastic encapsulated step/foot rest (@ 300 mm c/C) with polypropelene compound injection molded around 12 mm dia (Fe-415) steel reinforcing bar. Provision of the foot rest is envisaged in various tanks/ components of the STP for the purpose of accessability. The installation of the foot rest shall be done by the civil contractor as per civil GA drawing, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of electronic type level indicator, instrumation and controller for automatic operation of the system with high/low level alarm complete with auxillary NO/NC contacts, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of sight tube (of 4.0 to 5.5 m length) with isolation valve at top/bottom, demarcation on tube & for making the installation complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of Dissolved Oxygen meter with all necessary auxillaries complete for satisfactory functioning, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of Turbidimeter with all necessary auxillaries complete for satisfactory functioning, complete in all respects as per directions of Engineer in charge.
Contractor shall ensure submission of detailed GA drawings (Plan & Section), P & I diagram, schematic diagram for the above mentioned component and additional component if so required for the complete working of the STP.
Supply, installation, testing & commissioning of Submersible Sewage, Non clog type having solid handling capacity of 80 MM. The pumps shall be of Non-self priming,single stage,centrifugal type, the impeller shall be of non-clog to provide pasaage of solid upto 80 mm. The pump housing,motor top, and impeller made of cast iron (EN-GJL-250). The shaft seal shall be of double mechanical seal bidirectional type incorporated in single unit cartridge seal system for easy replacement.The pump shall have stainless-steel clamp arrangement to enable quick and easy disassembly of pump from the motor unit for service.The pumps shall be with all accessories, motor of required capacity, Pressure gauge on delivery line with isolation cock, level controller (with wiring) to control the level of sump automatically with auto coupling & guide rail lifting assembly complete in all respect along with stand alone BMS Compatible panel & Float switches (N+1) complete in all respect with a minimum efficiency of 55%.
Sewage Sump pumps in Collection Well 15 LPS @30m (1 Set = 1W+1S) 10.0 KW Each. (T4-Terminal Collection Well)
Supply, installation, testing & commissioning of non clogging submersible type pumps capable of handling solids of 20 mm. The pumps shall be of Non-self priming,single stage,centrifugal type, the impeller shall be of non-clog super vortex type to provide pasaage of solid upto 20 mm. The pump housing,motor top, and impeller made of cast iron (EN-GJL-250).The pump shall be suitable for auto / manual operation. The installation shall be complete with all necessary ancillaries & accessories including auto coupling & guide rail complete as required. (2Working + 1Standby)., along with stand alone BMS Compatible panel & Flooat switches (N+1) complete in all respects with a minimum efficiency of 55%.
Non clog Submersible Pump for pump room drainage Sump - 10 LPS @ 20 m Head (1 Set = 1W + 1S) 5.0 KW Each.
Submersible Mixer in Anoxic Tank
Supply, installation, testing & commissioning of submersible mixer of MOC SS316 having the suitable Motor (HP) to agitate the sewerage in the Anoxic Tank, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing & commissioning of non clogging type pumps capable of handling solids upto 40 mm having C.I casing & C.I impeller complete with all accessories, motor of required capacity, Pressure gauge on delivery line with isolation cock, level controller (with wiring) to control the level of sump automatically. Pumps shall have following duty:Note:-IP ratings for all submerssible pumps shall be IP-67, complete in all respects as per directions of Engineer in charge.
Sludge handling capacity - 30-40 mm
Bioreactor feed pumps 1 Set –(1W+ 1S)
Flow rate = 14 LPS ( Each)
Head = 10-12 Mts
Pump KW = 5.0 (Each)
Providing, fixing, testing & commissioning of horizontal, centrifugal, non clog Sludge recirculation pump for the disposal of settled sludge from Membrane tank to Sludge Holding Tank & Anoxic Tank. The pumps shall have CI casing, CI Impeller & SS shaft & sleeve with mechanical rotary shaft seal connected by a flexible tier type coupling to TEFC induction motor mounted on a common channel base-plate with coupling guard, 150 mm dia pressure gauge with isolation cock on delivery line of each pump, suitable vibration eliminator pads of approved design. Motor to be suitable for 415± 10%, 3 Phase, 50 Hz AC Power supply including all necessary interconnecting piping, valves (Ball valve/butterfly valve & Non-Return Valve), level controller complete with Probs, dry running protection and other accessories complete as required, complete in all respects as per directions of Engineer in charge.
RAS/Drain Pump 1 Set – (1W+ 1S)
Sludge handling capacity - 7-10 mm
Flow rate = 32 LPS (Each)
Head = 10-12 Mts
Pump KW = 7.5 (Each)
Supplying, installing, testing & commissioning of horizontal / vertical centrifugal pumps CI Head & Base, C.I Impeller, mechanical seal along with motor, pressure gauge with isolation cock, Isolation valve, NRV on delivery line. Isolation valve(PN-10), stainer (with by-pass) at suction. Mechanical seal, suitable vibration elimination pads of approved design, drain pipe with valve (25 dia) for the pump. The pump shall be suitable for 415±10% volts 3 phase AC supply including necessary instrumation for inter locking the pumps with motorized 2 / 3 way valve, complete in all respects as per directions of Engineer in charge.
Membrane Permeate Cum Back Pulse Pumps with VFD on working pumps. 1 Set –(1W+1S)
Capacity : 15-17 LPS (Each)
Head : 10 M
Pump KW = 0.5 (Each)
Supply, installation, testing and commissioning of Centrifuge system-2.0 cu.m Capacity with Filter press feed pump – 2 No. (1 working + 1 standby)-Cap-0.6 LPS with 1 No. standby stator, interconnecting piping and poly dosing system.
Designing, Supply, installation, testing & commissioning of poly electro type dosing system comprising of 1000 ltrs HDPE/FRP/PE tank with 100 lph electronic metering type pump and SS agitator complete with motor, complete in all respects as per directions of Engineer in charge.
Designing, Supply, installation, testing & commissioning of MBR modules of ultra-filtration membranes with SS – 304 skid for housing the membranes & air grid for scouring the sludge, permeate` s S.S.-304 piping etc. complete as required. Membranes shall be reinforced hollow fibre capable of regular backwashing with and without cleaning chemicals to minimize pore fouling. At least 30lmh flux @ 25deg C shall be considered to arrive at total membrane area required to treat specified waste water quantity. The Membrane manufacturer should offer minimum 2 years full replacement warranty and additional 5 years of pro rate basis . Membrane shall be physically strong enough to withstand the operating conditions associated with continuous operation in an aerated tank of mixed liquor at concentrations up to 12000 mg/l. The membrane module and membrane cassettes shall be by one manufacturer. MBR module immersed type with permeate capacity of 50 M3/ Hr considering 20 Hour of operation per Day. The maximum pore size of the membrane shall be 0.04 micron. The cost of the MBR shall be inclusive of automation required for the working of complete plant. if any instrument is required as per membrane manufacturer, which is integral part fo the MBR optimum performance then the same shall be provided at no extra cost, complete in all respects as per directions of Engineer in charge.
Capacity of Module-1.2 MLD-( 0.6 MLD x 2 nos.)
Supply, installation, testing & commissioning of the PLC based control panel (Common for both stream) with interlocking arrangement with supply pumps,suction pumps,chemical cleaning tank, modulating or shut-off valves including necessary wiring, magnetic switches & sensors complete to make the system functional with following interlocking. The PLC should have minimum 30 minutes power backup, complete in all respects as per directions of Engineer in charge.
Suction pump stop Suction pump`s head loss greater then set suction head
Supply pump stop Suction pump stop & Chemical cleaning pump start
Suction pump`s head loss greater then set suction head
Suction pump`s suction header valve stop
Suction pump`s head loss greater then set suction head
Chemical pumps delivery valve open in suction pump`s suction header, complete in all respects as per directions of Engineer in charge.
Supplying, installing, testing & commissioning of vertical multi stage inline centrifugal Softener feed water pumps CI with CED coating Head & Base, SS-304 Impeller along with motor, pressure gauge with isolation cock, Isolation valve, NRV on delivery line. Isolation valve(PN-10), stainer ( with by-pass) at suction. Mechanical seal, suitable vibration elimination pads of approved design, drain pipe with valve (25 dia) for the pump.The pump shall have IE-5 permanent magnetic motor suitable for 415±10% volts 3 phase AC supply, complete in all respects as per directions of Engineer in charge.
Capacity : 4.0 LPS
Head : 35 M
Softener Feed Pumps- (1 Set = 2W + 1S) 5.0 KW Each.
Supply, installation, testing & commissioning of Water Softening plant (MSEP) for make-up water for cooling towers comprising of Frontal Piping and required Isolation valves for operation with brine ejector and plastic piping complete with 2 KL HDPE brine tank with SS Agitator and gear mounted motor connection for preparation of brine solution (1.5 m dia and 2.00 m high aproximate)with fittings and brine filtering media and complete charge of cation exchange resin as per speciftication for the capacity as given below. The Softner shall be Lateral Header system. Softner thichness shall be 6 mm and Dish will be 8 mm. The shells shall be painted with two coats of redoxide primer and a coat of seimens grey paint on the external surface with adequate sized legs duly fasteneed to the foundation, complete in all respects as per directions of Engineer in charge.
Water Flow - 4.0 LPS/ Softener System (1 Set = 2W+1S)
Incoming hardness 300 Mg/L
Working pressure 3.5 Kg/cm2
Test pressure 5.0 Kg/cm2)
Outgoing hardness less than 5 ppm
OBR - 650 M3/Softener
Resin Qty - 3600 Liters/Softener
Resin Type - 220 Na
Regeneration Period - 20 Hrs.
Supply, installation, testing & commissioning of High Flow UV system for tertiary water treatment. The UV chamber shall be internally & externally electro polished with double side flange, drain part & probe bar. The unit shall use quartz glass technology for superior UV transmission and specialized high intensity UV lamp rated for 16000 hour operation. The UV dosage shall be greater than 60,000 uW-Sec / sq.cm, complete in all respects as per directions of Engineer in charge.
Unit flow : 14 LPS
Unit flow : 8 LPS
Electrical Dosing pump diaphragm type MOC, PP, Elecronic of suitable range (LPM)
Chemical cleaning Pump for Membrane System - Hypo
Capacity :60- 555 LPH
Head : 10 M
Chemical cleaning Pump for Membrane System - Citric
Capacity : 117-215 LPH
Head : 10 M
Hypo dosing Pump for Permeate System
Supply, installation, testing & commissioning of 200 ltrs HDPE/FRP/PE tank with with chemical for cleaning of membrains complete as required.
Air diffusion system shall include the following:
2 Nos. twin type rotary Air Blowers with VFD (1 working & 1 standby) for equalization & sludge thickner tank of capable of delivering 350 m3/hr (each) of free air at 4500 mmwc driven through “V” belt or directly coupled through flexible coupling to a TEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply, complete in all respects as per directions of Engineer in charge.
3 Nos. twin type rotary Air Blowers with VFD (1 working & 1 standby) for Bio Reactor tank, capable of delivering 631 m3/hr (each) of free air at 5400 mmwc driven through “V” belt or directly coupled through flexible coupling to a TEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply, complete in all respects as per directions of Engineer in charge.
2 Nos. twin type rotary Air Blowers with VFD (1working & 1 standby) for MBR tank, capable of delivering 298-356 m3/hr (each) of free air at 5400 mmwc driven through “V” belt or directly coupled through flexible coupling to a TEFCmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply, complete in all respects as per directions of Engineer in charge.
Air piping shall comprise of pipes droppers/ laterals with M S (epoxy coated) Header complete with all fittings such as tees, crosses, plugs, sockets, elbows, reducers, supports & clamps, puddle flanges etc cutting chases & making good. Contactor to submit detailed P & I indicating their proposal complete in all respects as per directions of Engineer in charge.
Non clog type air dispersion system capable of handling 3-5 cfm of air with oxygen transfer efficiency of 3-4% per/meter water depth. Air dispersion grid shall be assembled in modular form so that they can be replaced / repaired easily from plat form at the top. (Imported fine bubble membrane diffusers), complete in all respects as per directions of Engineer in charge.
Bronze Ball valve and air dispersion grid as required for STP as described above, complete in all respects as per directions of Engineer in charge.
Designing, Supply, installation, testing & commissioning of Air dispersion system shall be provided for equalization Sump/ tank, Aerobic digester cum Thickner & MBR Tank, complete in all respects as per directions of Engineer in charge.
Providing and fixing all piping (as described below) and isolation control valves for making the system complete, complete in all respects as per directions of Engineer in charge.
Submerged air piping: uPVC heavy duty Type B, conforming to IS 13592
Non Submerged air piping: GI (Heavy)
PVC piping : Tank overflow pipe & pump sewerage line
GI (Heavy) : Interconnecting pipe line after delivery header of pump/ filter.
Providing, fixing, testing and commissioning Magnetic/Integral Flow Meter with reading m3/hr, electrode material 316L, Hc, Hb, Ti, Ta, Liner material neoprene, conductivity greater than or equal to 5 µs/cm, highly accurate, wide measuring range, IP65, IP67 protection class, analogue output signal 4~20 mA, medium temperature range as suitable, Electrical power voltage 220 VAC, 50 Hz, 24 VDC with all integral parts with flanged ends including all necessary fitting such as threaded pieces, unions, pressure gauge and isolation cock, flanges piece for future removal, flanges / unions complete with all necessary testing charges and obtaining test certificates from municipal authorities, on following size pipe lines (1 no. strainer & 2 nos. pressure gauges shall be provided at inlet & outlet and cost shall be inclusive for the same). The meter shall comply to ISO 4064 standard, feasible for Sewage aplication. Meter shall be integrated with SCADA. (For measuring incoming flow and installation on delivery side of Raw Sewage feed pumps), complete in all respects as per directions of Engineer in charge.
150 mm dia-233 KL/Hr
100 mm dia
65 mm dia
Supply, Installation, Testing, & Commissioning of a pre-engineered, factory fabricated, assembled & tested, fully integrated, highly efficient pump, IE5 permanent magnet motors, skid mounted, complete ready-to-connect packaged variable speed pressure boosting system as follows.
a.a. In-Line, Multisage, centrifugal pumps with SS-304 casing chamber and impeller and SS-316 shaft, Cast iron with CED coated base & head with (IE-5) Permanent magenetic motor and integrated drives(with mechanical seal)
(Vendor to submit performance curves and technical catalog of the proposed model for review & information)
b. The packaged variable speed water pressure booster system should operate on proportional pressure control mode based on external flow meter connected to the pump controller. The system shall be complete with vertical multi stage centrifugal main pumps and pilot pump connected in parallel(pilot pump capacity should be designed for 20% of one main pump capacity), high efficiency IE 5 motors with integrated variable frequency drive for each pump, intelligent multi-pump controller. The controller shall be mounted in a control cabinet with an IP 41 enclosure of suitable rating, digital energy meter in the control panel; Modbus for BMS; hot Dipped Galvanised suction and delivery manifolds; isolation ball valves on suction and discharge of each pump; non return valve on discharge side of each pump; flow meter with 4-20mA output; hot dip galvanised common base frame; and diaphragm pressure vessel PN16.
c.A dedicated intelligent Multi-pump logic controller for control and monitoring of pumps shall be from the pump manufacturer with easy interface graphical 320 X 240 Pixels colour display unit with key function.Controller should operate on proportional pressure control mode based on variable flow demand to optimise the system performance. Pilot pump operation should be able to monitored and control from the Multi pump cotroller controller and same should be always operated as a lead pump in the sequence of operation.Pump curve data should be inbuilt with Multi pump controller to optimise the system performance. Controller should able to monitor multiple operating parameters (flow, inlet pressure, outlet pressure, instant flow estimation, cumulative flow and speed etc) to calculate best operating algorithm to pump sequence optimally.Mentioned features should be available, automatic pump alternations for run time equalization, Programmable number of starts/stops per hour to prevent pump hunting, Friction Loss Compensation, Redundant primary sensor for pressure monitoring, soft pressure built-up, log graph display for key paramters, Clock program for multiple set point for scheduled system operation. The system should be compatible with BMS through MODBUS.Complete Skid mounted system comprising of all accessories such as PLCs, pressure switches, pressure transducers, control wiring and any other necessary imports etc. (list to be provided by the vendor)
d. Precharged diaphram pressure vessel with food grade membrane, charging connection, connected to outlet header with necessary flanges, gaskets, isolating valves, nuts/bolts etc complete.
e. Set of accessories such as pressure switches, pressure transducers, inter connecting power & control cabling etc. complete
f. Accessories like pressure gauge, MS base frame (Synthetic enamel painted over a coat of primer), complete in all respects as per directions of Engineer in charge.
Flushing water hydropneumatic pumping system
For T4 Terminals
No. of pumps 3 Nos (2W + 1S) 12.5 KW each.
Water Flow Rate : 7.0 LPS (Combined Flow - 14 LPS)
Head-70 M
Supply, Installation, Testing, & Commissioning of a pre-engineered, factory fabricated, assembled & tested, fully integrated, highly efficient vertical multistage inline pump, IE5 permanent magnet motors, skid mounted, complete ready-to-connect system for Soft water transfer. The pump shall consist of Cast iron with CED coated base & head, SS-304 casing chamber and impeller and SS-316 shaft along with TEFC motor & mechanical seal, pressure transmitter, NRV, Isolation valve on delivery line. Isolation valve(PN-16), stainer at suction. The pump shall be suitable for 415±10% volts 3 phase AC. Supply, complete in all respects as per directions of Engineer in charge.
IE 5 permanent magnetic motor with integrated drives
VFD on working pump.
Capacity : 4 LPS (Combined Flow - 8 LPS)
Head : 50-60 m
(1 Set = 2W + 1S) 5.0 KW each.
Supply, Installation, Testing, & Commissioning of a pre-engineered, factory fabricated, assembled & tested, fully integrated, highly efficient vertical multistage inline pump, IE5 permanent magnet motors, skid mounted, complete ready-to-connect system for Irrigation water transfer. The pump shall consist of Cast iron with CED coated base & head, SS-304 casing chamber and impeller and SS-316 shaft along with TEFC motor & mechanical seal, pressure transmitter, NRV, Isolation valve on delivery line. Isolation valve(PN-16), stainer at suction. The pump shall be suitable for 415±10% volts 3 phase AC. Supply, complete in all respects as per directions of Engineer in charge.
IE 5 permanent magnetic motor with integrated drives
Capacity : 4.0 LPS
Head : 40 m
2Nos= ( 1W + 1S) 4.5 KW each.
Providing, fixing, testing and commissioning of uPVC pipes High pressure threaded pipes confirming to ASTM D - 1785, including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
40 mm dia
150 mm dia
Supplying, fixing, testing and commissioning of following valves, gauges and strainers for water circulation as per specifications.Soft water lifting pumps valve shall be PN-16) complete in all respects as per directions of Engineer in charge.
BALL VALVE with CI body SS disc nitrile sheet & O - ring & PN 16 pressure rating as specified.
25 mm dia
Providing, fixing, testing and commissioning of GI C class pipes and fittings threaded pipes confirming to IS 1239, including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
50 mm Dia
65 mm Dia
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia (6 mm thick)
250 mm Dia (6 mm thick)
300 mm Dia (8 mm thick)
Providing, fixing, testing and commissioning of SS-304 Sch-20 pipes and fittings argon welded pipes, including all necessary fittings, jointing with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
300 mm Dia Sch-20
Providing, fixing, testing and commissioning of CI Hubless pipes and fittings pipes confirming to IS 15905, including all necessary fittings, couplings, jointing with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
200 mm Dia
Supplying, Installation, Testing and Commissioning of CI body flanged (both ends) type serviceable suction / Y strainer with (stainless steel / brass mesh) conforming to relevant IS specifications amended upto date complete including providing and fixing nuts, bolts, washers, gaskets etc. complete as required.
80 mm Dia
100 mm Dia
150 mm Dia
200 mm Dia
250 mm Dia
Supplying, Installation, Testing and Commissioning of Butterfly valves of PN 1.6 rating of following sizes with nitrile Bronze / G.M. seat duly ISI marked and stainless steel stem with lever/gear operation and cast iron body in powder coated finish for fire fighting application complete in all respects confirming to IS: 13095 as required.
300 mm dia
200 mm dia
150 mm dia
100 mm dia
80 mm dia
65 mm dia
Providing, Installation, Testing and Commissioning of double flanged cast iron Non-Return Valve, PN 1.6 of following sizes confirming to IS : 5312 complete with rubber gasket, Gl bolts, nuts, washers etc. as required.
150 mm dia
80 mm dia
65 mm dia
Providing and fixing Puddle Flange made out of M.S. pipe heavy class sleeve 750mm long, threaded on both sides upto 50 mm dia and flanged ends(both side) above 65 mm dia pipes with 6mm thick M.S. plate 100mm wide welded alround in the centre of pipe as per detail complete in all respects The Puddle flange shall be hot dip galvanised after fabreication.
300 mm dia 6mm thickness
300 mm dia SS-304 Sch-20 6mm thickness
200 mm dia 6mm thickness
150 mm dia 5.4mm thickness
100 mm dia 5.4mm thickness
80 mm dia 4.85mm thickness
65 mm dia 4.50mm thickness
25 mm dia 4.05mm thickness
Supplying, installing, testing, commissioning of level Indiactors for Storage tanks with transparent pvc tube with float and ball valve complete in all respect as per direction of project incharge.
Supplying, installing, testing, commissioning of level controller for autonmation of pumping system having three levels probes complete in all respect including cabling up to pumps starter panel as per direction of project incharge.
Supplying, Installing testing and commissioning of non rendundant type PLC panel IP 67 Rated, with 7" HMI with Printing option for Automation of all Pumps and WTP elements required for theTertiary treatment, complete in all respects as per directions opf project incharge.
Supplying, installing, testing, commissioning of level switches for autonmation of pumping system having three levels probes complete in all respect including cabling up to pumps starter panel as per direction of project incharge.
Supplying, installing, testing, commissioning of Heavy Duty 600 mm dia CI double seal Cover and frame complete in all respect as per direction of project incharge.
Supplying, installing, testing, commissioning of 300 mm dia Pot Strainer complete in all respect as per direction of project incharge.
Supply, Erection, Testing and Commisioning of monorail for lifting, mobility, and necessary placement, repairs of membranes, suitable for 5 T load, as required for the satisfactory functioning , complete in all respects as per directions of Engineer in charge.
Supply, installation, testing and commissioning of Air Compressor Sytem with all necessary piping and other auxillaries to pneumatically operate the valves as required, complete in all respects as per directions of Engineer in charge.
Supply, installation, testing and commissioning of Vacuum ejector for Priming Sytem with all necessary piping and other auxillaries as required, complete in all respects as per directions of Engineer in charge.
Providing, testing and commissioning of 100 mm dia dial type pressure gauge with pressure scale of 0 to 20 Kg / sqm. Provision of isolation ball valve shall also be included in the cost, complete in all respects as per directions of Engineer in charge.
Air Treatment System
for EqualizationTank
Designing, Supply, installation, testing & commissioning of STP exhaust odour control machine with ozone injection technology comprising of ozone generators working on outdoor air feed with multi plate type corona discharge plates,3 stage step controller, all necessary controls, cable etc. Machine shall be UL E 337863 listed. Other details of the machine shall be as per technical specification
For Equalization Tank - (500 CFM) - 1 Set - 1W+1S
Supplying, installation, testing and commissioning of SISW(Single Inlet Single Width) fan with PP Construction having suitable motor & VFD.
Capacity: 500 CFM - 1 Set - 1W+1S
Supply, Installing , Testing and Commisssioning of 18 G SS 304 contact Chamber with inlet and outlet collar made out of SS 304 for accomodating SS duct complete in all respect including base frame and mounting arrangement as per direction of project In Charge
Supplying, installation, testing and commissioning of Sensors.
H2S Sensors mounted in weather proof enclosure
Ozone Sensors mounted in weather proof enclosure
Supplying, installation, testing and commissioning of Stainless Steel (hairline finish SS304) Ducting for STP exhaust odor control system with SSsupports, SS angle, SS hanging rods,SS nut bolts and all other allied accessories to complete the system. The SS sheet shall be Hailine finish with transverse jointsframes made out of SS304 angle.The system shall be complete with SS bends, SS blank off etc as required.Duct joints will be sealed with silicon sealent.
Stainless Steel Ducting Work -22 Gauge
Supply Installation, testing and commissioning of Stainless Steel (SS304) Low Leakage Motorized Shutoff Damper for STP exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Motorized Shutoff Damper (225 x 225mm)
Supply Installation, testing and commissioning of Stainless Steel (SS304) Manual Damper for STP exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Volume Control Manual Damper (225 x 225mm)
Supply & fixing of Round/Square Flexible Connector having silicone cloth & SS304 frame for blower inlet & outlet.
Supply & fixing of SS louver with bird screen
Size=300 x 300 mm
Supply Installation, testing and commissioning of Stainless Steel (SS304) Drain Port with ball valve & Drain plug.
Providing, fixing, testing and commissioning of SS304 Sch 20 pipes and fittings threaded pipes including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
300 mm dia
Supply Installation, testing and commissioning of Stainless Steel (SS304) Tank inlet air cowls with SS Bird screen
Inlet cowl with bird screen (225x 225 mm)
Stainless steel drain port with blankoff
Supply & fixing of SS Collar for fixing fan with SS 304 pipe
Supply of MS Base/Platform for equipment
for T4 Wet well
Supply, Installation, testing and commissioning of Wet Well exhaust odour control machine with ozone injection technology comprising of ozone generators working on outdoor air feed with multi plate type corona discharge plates,3 stage step controller, all necessary controls etc. Machine shall be UL E 337863 listed. Other details of the machine shall be as per technical specification
For Wet Well - (500 CFM) - 1 Set - 1W+1S
Supplying, installation, testing and commissioning of SISW(Single Inlet Single Width) fan with PP Construction having suitable motor & VFD.
Capacity: 500 CFM - 1 Set - 1W+1S
Supply, Installing , Testing and Commisssioning of 18 G SS 304 contact Chamber with inlet and outlet collar made out of SS 304 for accomodating SS duct complete in all respect including base frame and mounting arrangement as per direction of project In Charge
Supplying, installation, testing and commissioning of Sensors.
H2S Sensors mounted in weather proof enclosure
Ozone Sensors mounted in weather proof enclosure
Exhaust Air Quality Monitor
Supplying, installation, testing and commissioning of Stainless Steel (hairline finish SS304) Ducting for Wet well exhaust odor control system with SSsupports, SS angle, SS hanging rods,SS nut bolts and all other allied accessories to complete the system. The SS sheet shall be Hailine finish with transverse jointsframes made out of SS304 angle.The system shall be complete with SS bends, SS blank off etc as required.Duct joints will be sealed with silicon sealent.
Stainless Steel Ducting Work -22 Gauge
Supply Installation, testing and commissioning of Stainless Steel (SS304) Low Leakage Motorized Shutoff Damper for Wet Well exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Motorized Shutoff Damper (225 x 225 mm)
Supply Installation, testing and commissioning of Stainless Steel (SS304) Manual Damper for Wet Well exhaust odor control system Damper frame & blade shall be 18G & hardware ie, bush,pin, nut bolts etc shall be SS304 & sealing gasket will be silicone sheet to complete the system etc. as required.
Stainless Steel Low Leakage Volume Control Manual Damper (225 x 225 mm)
Supply & fixing of Round/Square Flexible Connector having silicone cloth & SS304 frame for blower inlet & outlet.
Supply & fixing of SS louver with bird screen
Size=300 x 300 mm
Supply Installation, testing and commissioning of Stainless Steel (SS304) Drain Port with ball valve & Drain plug.
Providing, fixing, testing and commissioning of SS304 Sch 20 pipes and fittings threaded pipes including all necessary fittings, threading, jointing with teflon tape with galvanised Mild Steel supports, complete in all respects as per directions of Engineer in charge.
300 mm dia
Supply Installation, testing and commissioning of Stainless Steel (SS304) Tank inlet air cowls with SS Bird screen
Inlet cowl with bird screen (225x 225 mm)
Stainless steel drain port with blankoff
Supply & fixing of SS Collar for fixing fan with SS 304 pipe
Supply of MS Base/Platform for equipment
Supply & installation of 5 star BEE rated 365 Liters double door refrigerator complete in all respects.
ELECTRICAL WORKS FOR STP
Supply, Installation, Testing and Commissioning of cubicle LT panel as per IEC 61439-1 & 2, IP42, suitable for 415V+/-10%, 3 Phase, 4 wire 50 Hz AC supply system, form 4b construction, fabricated in compartmentalized modular design from CRCA sheet steel of 2 mm thick for frame work and covers, , plates i/c cleaning & finishing complete with powder coating in approved shade, having TPN Aluminium alloy bus bars for high conductivity, SMC bus bar supports,with short circuit withstand capacity of 35 KA for 1 sec , bottom base frame of not less than 75 mm thickness, fabrication shall be done in transportable sections, entire panel shall have a common 50 mm x 6 mm earth bar sized for prospective earth fault , solid / flexible connections from main bus bar to switchgears and from switchgear output to cable termination in cable alley with required size of AL conductors / bus bars and control wiring with 2.5 sqmm PVC insulated copper conductor cable (FRLS), cable alleys, cable gland plates , i/c providing following switchgears / accessories as per specifications. Panel shall be completed in all respect and must follow tech specs & drawings.
2 No.MCCB, 400Amps, (Ics= 100% Icu),4 Pole, 25 kA with microprocessor release unitwith O/L & S/C proteciton with current adjustability , with extended rotary handle as per technical specification. and with following accessories.
Each Incomer shall have one set of the following items:
1 No. digital MFM meter and one set of 3 nos. CTs of ratio 400/5A , Class I accuracy and 10 VA burden- 1set.
3 Nos.phase indicating LED lamps each with 2 amp back up MCB.
Indication lamps for ON/OFF/TRIP status of motors.
BUSCOUPLER
1 No. 400 Amp,4 Pole, 25 kA with microprocessor release unit with O/L & S/C proteciton with current adjustability as per specification.
BUSBARS
TPN aluminium bus bars of minimum 400 Amps capacity with heat shrinkable coloured sleeves and i/c, SMC bus bars supports at required intervals complete for cross section, size supports & their spacing etc. for withstanding fault level of 25 KA for 1 sec.
OUTGOING UNITS
a. Feeder Suitable for 1 No. X 20 KW including 100A TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C for Sewage Sump Pumps in Collection well, complete in all respects as per directions of Engineer in charge.(T4 Terminal-Collection Well)
b.Automatic DOL starter suitable for 1.5 KW motor including 10A TP MCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 10 KA)- ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for automaic screen - 1 no., complete in all respects as per directions of Engineer in charge.
c. DOL starter suitable for 0.5 KW, motor including 1.5 - 2.5A TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C,contactor (Ics = Icu = 25 KA) , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Centrifuge , complete in all respects as per directions of Engineer in charge.
d.Automatic DOL starter suitable for 7.5 KW motor including 11-16 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA) ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for air blower(MBR) - 2 no.(1W+1S), complete in all respects as per directions of Engineer in charge.
e.Automatic DOL starter suitable for 7.5 KW motor including 11-16 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA) ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for air blower(eqt. & Sludge holding) - 2 no.(1W+1S), complete in all respects as per directions of Engineer in charge.
f.Fully automatic DOL starter suitable for 5.5 KW motor including 6.3-10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA) ,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for air blower (Bioreactor) - 3 no.(2W+1S), complete in all respects as per directions of Engineer in charge.
g.DOL starter suitable for 2.2 KW motor iincluding 4-6.3 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA- ,Contactor ,Overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators etc. for mixer (Anoxic Tank) - 2 no.(1W+1S), complete in all respects as per directions of Engineer in charge.
h. Feeder Suitable for 2 No. X 5 KW, including 32A TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C for Bioreactor feed pumps, complete in all respects as per directions of Engineer in charge.
i. Feeder Suitable for 3 No. X 7.5 KW, including 63A TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C for RAS/Drain Pumps, complete in all respects as per directions of Engineer in charge.
j. Feeder Suitable for 3 No. X 0.5 KW, 2No.(1W+1S) motor including 25A TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C for Permeate Cum Back Pulse Pumps, complete in all respects as per directions of Engineer in charge.
k. DOL starter suitable for 5 KW, 2No.(1W+1S) motor including 6.3-10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA), Contactor , Overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators etc. for Submersible Drainage Water Pumps Pump room drainage sump , complete in all respects as per directions of Engineer in charge.
l. DOL starter suitable for 5.0 KW, 3No.(2W+1S) motor including 6.3-10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch,digital ammeter with CT etc. for Softener Feed pumps, complete in all respects as per directions of Engineer in charge.
m. Feeder suitable for 5 KW, 32 A TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C, for UV system, complete in all respects as per directions of Engineer in charge.
n. Automatic DOL starter suitable for 0.5 KW, 1No. motor including 0.8-1A TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Hypo Dosing Pumps, complete in all respects as per directions of Engineer in charge.
o. DOL starter suitable for 0.50KW, 1No. motor including 0.8-1A TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C,Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Citric Dosing Pumps , complete in all respects as per directions of Engineer in charge.
p. Feeder Suitable for 1 No.X 25 KW including 125A TPN MCCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA), for Flushing water hydropneumatic pumps, complete in all respects as per directions of Engineer in charge. (for T4-Terminal)
q. DOL starter suitable for 5.0 KW,3 no.(2W+1S) motor including 6.3-10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch,digital ammeter with CT etc. for Soft water transfer pump , complete in all respects as per directions of Engineer in charge.
r. DOL starter suitable for 4.5 KW, 2 no.(1W+1S) motor 6.3-10 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for Irrigation water transfer pump, complete in all respects as per directions of Engineer in charge.
s. DOL starter suitable for 1 KW, 2 No (1W+1S). motor including 2.5-4 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for ozone generatoring machine , complete in all respects as per directions of Engineer in charge.
t. DOL starter suitable for 1 KW, 2 No (1W+1S). motorincluding 2.5-4 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA),Contactor , overload relay ,start/stop Push Button, ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for ozone generatoring machine for Wet Well, complete in all respects as per directions of Engineer in charge.
u. VFD starter suitable for 2 KW, 2No( 1W+1S). motor including 4-6.3 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA), ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for SISW fan , complete in all respects as per directions of Engineer in charge.
v. VFD starter suitable for 2 KW, 2No( 1W+1S). motor including 4-6.3 amps TP MPCB with built in thermal magnetic release unit with fixed setting with O/L,S/C (Ics = Icu = 25 KA), ON/OFF/TRIP Indicators, Auto/Manual switch, etc. for SISW fan for Wet Well , complete in all respects as per directions of Engineer in charge.
Spare MCB’s of following capacities
1- 63 amps 4P MCB’s - 4 Nos.
2- 32 amps 4P MCB’s - 4 Nos.
3- 63 amps TPN MCCB’s - 2 Nos.
4- 40 amps TPN MCCB’s - 1 Nos.
5- 10-16A TP MPCB - 2 Nos.
6- 24 - 32 A TP MPCB 2 Nos.
All outgoing MCCB shall be with adjustable O/L protection
All incomers and Buscoupler breakers shall be mechanical interlocked with suitable accessories.
All breakers breaking capacities shall be Icu=Ics upto 433 V.
Breaker ON,OFF & TRIP indication LED light with back up 2 Amp SP MCB for each Buscoupler & Outgoing.
1 Set Rotary operating mechanism and terminal extension spreaders for all the MCCBs.
All switch gear/panels sall be suitable for 25 KA rating.
All outgoing will have 96 sq mm size ammeter and CT.
All Starter units shall be provided with 3 level liquid level indicator.
All outgoing units to have ON/OFF status of pump.
All pumps to be provided with over load relay.
One No. of Single Phase preventer in incoming of panel.
All Starter/Feeder shall be BMS Compatible.
Necessary cable alleys, internal / cabling, wiring, cabling from MCC to various pumps / equipment and interlocking, earthing for all equipment shall also included
MCC for STP as described above
CABLE and Cable termination (1.2 MLD STP)
a) Cable
Supply Installation Testing and Commissioning of 1.1 KV grade,4 core, copper , armoured, XLPE confirming to IS 7098 part-I including laying of the cable in ground/wall/surface/cable tray/trench etc.as per the requirement in accordance with technical specification complete in all respect as per the direction of engineer incharge
Including the accessories as mentiioned below.
Capacity - As per Control Panels and machines to be connected.
Control Cable - Multi core Copper armoured (No. of cores to be decided as per control panel, Machine to be connected.
b) Cable Termination
Double compression heavy duty glands and copper lugs as required
c) EarthingSuitable plate/pipe Eathing for equipments as per IS 3043 as per requirement complete in all respect as required.
SITC Cable , termination , earthing as mentioned above
COMMON ITEMS FOR SEWAGE TREATMENT PLANT MBR TECHNOLOGY OF2.25 AND 1.2 MLD
Testing Apparatus & Chemicals Kit
Supplying, Installing the complete kit for testing of influent/Effluent parameters (BOD,COD,TDS,TSS,Residual Chlorine, Total Nitrogen, Total Phosphorus, PH, Oil & Grease and Microbial presence) complete with chemicals and apparatus required along with a suitable sized wall mounted shelf to accomodate the same, complete in all respects as per directions of project incharge.
BUILDING MANAGEMENT SYSTEM WEB-BASED SERVER SOFTWARE
Software and Operator Workstation
Supply, installation, testing and commissioning of core i7-4790k or Xeon E5-1650 v3 processor, Memory of 32 GB, Hard disk size (2x 800 GB Professional/Enterprise SSD with SATA or SAS), Giga speed Network card with 2 GB Graphic card of Resolution 2.560 x 1600 with Onboard Intel 4600 HD Windows 8.1, 64 bit Edition or Windows Server 2008 R2 and original anti virus software.
32 Inch HD Color LED Monitor.
Laser jet Printer (A4 size, Colour)
Supply, installation, testing and commissioning of Layer 2/3 managed switch with 16 or 24 ports (RJ-45) port. The switch shall have 2 RSTP enabled ports to communicate with other switches to built a ring topology network on CAT6 A cable. The switch shall have 1 GB port to communicate with other switches including Passive components inbuilt 2 SFP ports including SFP modules, rack mountable, SMPS power supply & other termination accessories (Like Pigtails/LIUs/ Convertors/Splicing equipment ,Patch panel, Patch Cord, Etc) complete as per specifications and as required for BMS DDC Panel Networking. The switch to switch distance shall not exceed beyond 80 meters. Vendor to decide the quantity of network switches based on their network design.
Supply, Installation, Testing & Commissioning of software for Building Management Software with features like 3D vector dynamic graphics with Autocad import of plan with Zoom In & Zoom Out facility, Graphic Builder, Plant Viewer, Trend Viewer, Object Viewer, Report Viewer, Alarm router, Log Viewer. The Web-Based Server software shall permit use of Standard Web-Browsers such as Microsoft Internet Explorer, Netscape Navigator, etc. The software shall be capable of integartion third-party systems and should supports latest IP technology (IP V4/V6). The Management Stations shall match the BACnet Profile B-AWS (Advanced workstation) as per the BTL Listing. The Web based software shall include 1 Client License for remote viewing. Sms/Email feature for accessing critical alarms on mobile phone & Mobile App and Web Service sessions. The Vendor shall include cost of GSM Module in the quoted price. Number of IO points shall be considered as per the IO summary considering 15% spares.
Supply, Installation, Testing & Commissioning of High-quality CAPACTIVE touch 7.0'' panels for technical on-site operation of plants as well as room operation. The Touch Panel shall have integrated web server and a BACnet/ IP web interface to connect a HTML5 browser to a device on the network. Generic operation and monitoring of plant functions (alarms, schedulers, calendars, set point changes, display of actual values, etc.)
PROGRAMMABLE & APPLICATION SPECIFIC CONTROLLER (DDC) - UL LISTED/BTL certified.
Supply, Installation, Testing & Commissioning of True IP Based Standalone 32 Bit Intelligent, BTL Listed & UL certified interoperable DDC as per the specification. Each DDC Controller shall have inbuilt IP port & shall directly connect to the Network switches. No Supervisory Controller/Router shall be acceptable for IP conversion. The DDC shall be Programmable and Application specific with Real Time clock.The Controller shall have minimum 18 onboard points and can be expandable upto max of 52 points. The DDC must support trending & scheduling at Controller level. All trend data must be created and saved to the automation station to achieve gap-free trend documentation during communication failure.
The above shall be housed in IP 55 vandal proof, lockable & secure MS Cabinets to be supplied along with all necessary switchgear protections as required. Number of controllers shall have spare capacity of 15% for future expansion.
Ventilation system , Electrical System and Plumbing system
DDC for Ventilation System
DDC for Electrical System
DDC for Plumbing System
SYSTEM INTEGRATION UNITS for 3rd party integartions - UL listed Controllers & BTL label
Supply, Installation, Testing & Commissioning of True IP Based System Integration unit consisting of microprocessor based controller units BTL & UL Listed for third party integration. The same should support operations/ monitoring via portable operator terminal. .The controller shall be Native BACnet type with communication via BACnet/LonTalk, Integration platforms and system controllers for third-party devices and systems via KNX, Modbus, M-Bus and other protocols into the automation level via BACnet. The same shall Support operation via local or network-compatible operator units. It should store trend logs and event buffer for a typical duration of up to 30 Days. All the Integrators shall be seperate. Note: No 3rd party make integartor shall be accepted.
Integration of WTP on MODbus
Integration of VFD on MODbus
Integration Plumbing PLC to be on Modbus RTU with RS 485 Communication Port - 150 Points
Field instruments
Supplying, installing, testing and commissioning of the following sensors / transducers / transmitters.
Supply, Installation, Testing & Commissioning of Bi Level Switch
Supply, Installation, Testing & Commissioning of Water Pressure Sensor
Cabling and Conduiting (Contractor to provide exact quantities based on final shop drawings)
Supplying, laying, termination, testing and commissioning of signal cables. (2 core x 1.5 Sq.mm), PVC insulated, Shielded tinned copper conductor cable.
Supplying, laying, termination, testing and commissioning of signal cables. (4 core x 1.5 Sq.mm), PVC insulated, Shielded tinned copper conductor cable.
Supplying, laying, termination, testing and commissioning of 3 Core 1.5 Sqmm, unarmoured ATC conductor multistranded, FRLS cable for Powering DDC , Actuators.
Supplying, laying, termination, testing & commissioning of CAT 6A unarmoured Cables with required accessories like RJ45 connector etc.
Supply, Installation, Testing & Commissioning of MS Conduit 25 mm for Signal & Communication Cable
Supply, Installation, Testing & Commissioning of GI Flexible
Supplying, installing, testing and commissioning of 2 mm thick GI perforated cable trays of the following sizes complete with angle iron supports/hanging arrangement etc
Annual Operation & Routine Maintenance
Operation anr routine maintenance of Sewage Treatment Plant including electrical panels, BMS and associated equipments complete in all respects as per requirements complete in all respect as per condition of contract
1st year of operation during DLP
2nd year of operation during DLP
1st year of operation after 2 Years of DLP.
2nd year of operation after 2 Years of DLP.
3rd year of operation after 2 Years of DLP.
4th year of operation after 2 Years of DLP.
5th year of operation after2 Years of DLP.
All inclusive Comprehensive Maintenance of all Sewage Treatment Plant (STP) after DLP as provided under the main contract including trouble shooting, preventive maintenance and breakdown maintenance etc. as required as per good engineering practice, recommendation of the manufacturer, instructions of Engineer-in-Charge and as per terms and conditions specified .
1st year after 2 Years of DLP.
2nd year after 2 Years of DLP.
3rd year after 2 Years of DLP.
4th year after 2 Years of DLP.
5th year after2 Years of DLP.
Sophisticated Industrial Materials Analytic Labs Pvt Ltd
AYYAPPA INFRA PROJECTS PVT LTD
Effwa Infra and Research Pvt Ltd
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid