Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.0 LAccepted-Finance | ₹8.0 L | L-1 | Accepted-Finance ok |
| 2 | L-2₹8.3 L+₹20,911 (2.60%)Accepted-Finance | ₹8.3 L+₹20,911 (2.60%) | L-2 | Accepted-Finance ok |
| 3 | L-3₹8.5 L+₹48,411 (6.02%)Accepted-Finance LOHARU HARYANA | ₹8.5 L+₹48,411 (6.02%) | L-3 | Accepted-Finance ok |
| 4 | L-4₹8.7 L+₹64,911 (8.07%)Accepted-Finance | ₹8.7 L+₹64,911 (8.07%) | L-4 | Accepted-Finance ok |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Vikas Kumar Contractor L3 | JAI SINGH CONTRACTOR L1 | Arvind L2 | New Krishan Building Material Suppliers Girdharpur L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance Water Supply Scheme Sehlanga Tehsil and District Jhajjar including Water Works at Sehlanga Tubewells, Installation pumping machinery, electric installation, street light, chlorination system and all other installation including existing Distribution system and Rising Main for 11 months from the date of commencement excluding repair of civil structures and disinfectant (For the year 2025-26) | 11 | Months | 77,500 ₹8,52,500 | 73,099 ₹8,04,089 Lowest | 75,000 ₹8,25,000 | 79,000 ₹8,69,000 |
Tender Value
₹10.0 L
EMD Value
₹19,940
Closing Date
15 Jan 2026, 4:00 pmClosed
RAJESH KUMAR KAUSHIK
Jhajjar PHED No. 1
Annual Maintenance Estimate for water supply scheme Sehlanga Tehsil and Disrict Jhajjar for the year 2025-26. OandM for the next 11 Months
2026_HRY_495147_1
202621C6BDF1 6A23 4637 976B B1CF90C69EF8590PUH
Open Tender
Civil Works
Works
340 days
SELANGA
2 documents required · 2 mandatory
₹1,000
₹19,940
Yes
24 Aug 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
15 Jan 2026
6 Jan 2026
Operation and Maintenance Water Supply Scheme Sehlanga Tehsil and District Jhajjar including Water Works at Sehlanga Tubewells, Installation pumping machinery, electric installation, street light, chlorination system and all other installation including existing Distribution system and Rising Main for 11 months from the date of commencement excluding repair of civil structures and disinfectant (For the year 2025-26)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_573609.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .