| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.7 LAccepted-AOC NO 129 INDIRA NAGAR ATTIPATTU CHENNAI 120 | CHENNAI | 120 | ₹70.7 L Quoted ₹74.0 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹76.1 LRejected-AOC NO 36 KALAIVANAR STREET BHARATHI NAGAR MINJUR 601 203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | ₹76.1 L | L2 | Rejected-AOC L2 bidder |
| 3 | L3₹81.7 LRejected-AOC OLD NO 79 1 NEW NO 14 KAPPAL POLU STREET OLD WASHERMENPET CHENNAI 21 | CHENNAI | TAMIL NADU | ₹81.7 L | L3 | Rejected-AOC L3 bidder |
| Sl No | Description | Qty | Unit | RAMYA ELECTRICAL WORKS L2 | SUDHA ELECTRICAL SERVICE L3 | ADHITHAN L1 |
|---|---|---|---|---|---|---|
| 1.00 | Maintenance of carbon brushes /Replacement of worn out carbon brushes in Unit III/ Unit IV Generator shaft Earthing & Rotor E/F sensing carbon brush. | 100 | Nos. | 179 ₹21,122 | 182 ₹21,476 | 171.84 ₹20,277 |
| 2.00 | Maintenance of 110KV Breakers/ Generator Transformers/Station Transformers/UAT/ Battery Chargers /Diode Voltage Regulator panel. | 324 | Nos. | 500 ₹1.9 L | 700 ₹2.7 L | 1,155 ₹4.4 L |
| 3.00 | Maintenance of Battery cells and once in a week / Bi-monthly | 22,904 | Nos. | 30 ₹8.1 L | 30 ₹8.1 L | 5.5 ₹1.5 L |
| 4.00 | Maintenance of 110 KV isolators, CTs, CVTs, LAS,SF 6 gas top up, earth pit maintenance, earth switches, etc., Regular (once in 3 months) & Break down. | 1,611 | Nos. | 250 ₹4.8 L | 270 ₹5.1 L | 287 ₹5.5 L |
| 5.00 | Works on Connectors / Fittings in 110KV Buses,Generator Transformers, Generator Breakers & All Feeder Breakers. | 7,536 | Nos. | 8 ₹71,139.84 | 10.5 ₹93,371.04 | 9.8 ₹87,116.16 |
| 6.00 | Calibration of Bimetallic relays Electromagnetic relays and static relays including safe release of relay from panel/testing relay and physical verification, cleaning attending minor defects, repair/adjustment, refixing, checking for correctness and restoring normalcy, handling of testing kits/equipment and maintaining of registers etc, as directed by the engineer in charge. | 520 | Nos. | 300 ₹1.8 L | 400 ₹2.5 L | 586 ₹3.6 L |
| 7.00 | Maintenance of LT Modules below 45KW rating & breakdown works (once in 3 months). | 312 | Nos. | 210 ₹77,313.60 | 230 ₹84,676.80 | 203 ₹74,736.48 |
| 8.00 | Maintenance of LT Modules and Breakers above 45KW rating regular & breakdown works (once 3 months). | 75 | Nos. | 350 ₹30,975 | 370 ₹32,745 | 338.54 ₹29,961 |
| 9.00 | Testing of AVR/Testing of Generators / Testing of Power transformers / Testing of 110KV Breakers Contact Resitance/Testing of 110KV Breakers Open Close Time / Testing of 11KV Breakers /Testing of 11KV Bus duct /Testing of Diode wheel in Exciter/Testing of Switch yard interlock circuits/Cleaning of 11KV bus duct & 415V bus duct / Conduting Load test on 125 Volt and 220 Volt Battery set/ Cleaning, checking of tightness, testing of IR value in MCC LT Bus bars. | 83 | Nos. | 700 ₹68,558 | 1,200 ₹1.2 L | 2,342.62 ₹2.3 L |
| 10.00 | Testing of Unit I to IV Generator space heater and panel heater / Checking the terminal tightness of CCR panels /11KV Switchgear panels /415V Switchgear panels / SCR panels / FWPH panels/ GT protection panel / GT Marshalling Panel /RTCC Panel /OLTC panel / Terminal Tightiness of draw out type 11kv & 415v CTs/PTs in GAC, MCC, HT & LT Room / Cleaning of Cable Gallery trays / Terminal tightness of AVR Panel of Unit I to IV. | 674 | Nos. | 260 ₹2.1 L | 280 ₹2.2 L | 237 ₹1.9 L |
Tender Value
Refer Docs
EMD Value
₹70,000
Closing Date
31 Oct 2025, 2:00 pmClosed
Chief Engineer MTS and GTS
Chief Engineer MTS and Gas Turbine Schemes, TNPGCL, 144, Anna Salai, Chennai 600002,Tamil Nadu
Preventive Breakdown and General Works in respect of Electrical maintenance Sub Division and Mechanical Maintenance I section for the period of one year from the date of commencement of work during the year2025 26 at Basin Bridge GTPS
2025_EB_612425_1
SE/GTS/OT-05/2025-26
Open Tender
Electrical and Maintenance Works
365 days
Chennai
As per Specification
4 documents required · 4 mandatory
₹0
₹70,000
Yes
14 Jan 2026
10 Oct 2025
1 Nov 2025
10 Oct 2025
31 Oct 2025
13 Oct 2025
10 Oct 2025 - 27 Oct 2025
Amount
Maintenance of carbon brushes /Replacement of worn out carbon brushes in Unit III/ Unit IV Generator shaft Earthing & Rotor E/F sensing carbon brush.
Maintenance of 110KV Breakers/ Generator Transformers/Station Transformers/UAT/ Battery Chargers /Diode Voltage Regulator panel.
Maintenance of Battery cells and once in a week / Bi-monthly
Maintenance of 110 KV isolators, CTs, CVTs, LAS,SF 6 gas top up, earth pit maintenance, earth switches, etc., Regular (once in 3 months) & Break down.
Works on Connectors / Fittings in 110KV Buses,Generator Transformers, Generator Breakers & All Feeder Breakers.
Calibration of Bimetallic relays Electromagnetic relays and static relays including safe release of relay from panel/testing relay and physical verification, cleaning attending minor defects, repair/adjustment, refixing, checking for correctness and restoring normalcy, handling of testing kits/equipment and maintaining of registers etc, as directed by the engineer in charge.
Maintenance of LT Modules below 45KW rating & breakdown works (once in 3 months).
Maintenance of LT Modules and Breakers above 45KW rating regular & breakdown works (once 3 months).
Testing of AVR/Testing of Generators / Testing of Power transformers / Testing of 110KV Breakers Contact Resitance/Testing of 110KV Breakers Open Close Time / Testing of 11KV Breakers /Testing of 11KV Bus duct /Testing of Diode wheel in Exciter/Testing of Switch yard interlock circuits/Cleaning of 11KV bus duct & 415V bus duct / Conduting Load test on 125 Volt and 220 Volt Battery set/ Cleaning, checking of tightness, testing of IR value in MCC LT Bus bars.
Testing of Unit I to IV Generator space heater and panel heater / Checking the terminal tightness of CCR panels /11KV Switchgear panels /415V Switchgear panels / SCR panels / FWPH panels/ GT protection panel / GT Marshalling Panel /RTCC Panel /OLTC panel / Terminal Tightiness of draw out type 11kv & 415v CTs/PTs in GAC, MCC, HT & LT Room / Cleaning of Cable Gallery trays / Terminal tightness of AVR Panel of Unit I to IV.
Maintenance of HT circuit breakers regular & breakdown works (once in 3 months).
Testing of IR value, BDV oil test, silica gel replacing works in Generator Transformer/ Station transformer / Collecting & sending of oil samples from Generator Transformer & Station Transformer to R&D lab for DGA test & BDV test /Generator Transformer OLTC gear box mechanism and Tap Position Indicator mechanism servicing work / Assist the R&D team for Generator Transformer Tan Delta test.
Calibration of voltmeter / Ammeters /Timers includes safe release of meter/timer from panel / testing of meter & meter and physical verification, cleaning attending minor defects, repairs /adjustments, refixing of meter/timer, checking for correctness and restoring normalcy, handling of testing kits / equipments and maintaining of registers etc, as directed by the engineer in charge.
Checking of control circuits and replacing the defective contactors /relays / Timers / defective control switches/ push button / Hooters / lamp holders / defective AVR panel cards / Annunciation cards / Testing of 415v CTs & PTs and control Transformer/GTOil line Valve leak attending works / Replacement work of defective battery /Battery Charger Cards in Unit I to IV & Auxlieries / GT Marshalling box / control panels / 415V SWGR / RTCC /OLTC panels / SCR, AVR panels.
Testing and replacing the defective Annunciation bulbs / indicating bulbs in various panels of Unit I toIV MCC modules/ GT Marshalling box/ control panels/ 415V SWGR/ RTCC panels and etc.,
Attending to defect in HT Breakers / LT Breakers / Testing of 110 KV CTs & PTs/Generator Transformer /110KV CTs / PTs oil leak attending work by replacing the worn out ‘O’ rings , gaskets and topping up of transformer oil & Nitrogen gas.
Testing of Unit 52AS and 52AR LT Breaker and its change over circuits / Replacement work of defective Limit Switch / Pressure Switch / Pressure Gauge /Spring Charging Motor / Carbon Brush in spring charging motor/ trip coil / Close coil / Control contactor of 110KV Breaker / Cooler fan / OTI / WTI /Topping up of SF6 gas /Replacement work of defective oil pump / OLTC motor.
Topping up of Transformer oil with filtering arrangements including rental and transporting charges of filter machine.
Replacement work of defective ‘T’ clamps / Breaker clamps/ P.G. clamp / Switch end clamp /CT clamp / PT clamp / defective conductor in Main Buses & Strung buses /defective conductor interconnecting the CT, Isolator & Breakers.
Testing of CO2 Fire Fighting System in Unit I to IV.
Cleaning of all Field Instruments like Gauges, Switches, Indicators, Speed Pick-ups, Solenoid Valves, Scanners, Spark Plugs, Vibration Sensors and Smoke Detectors in Unit I to IV and Auxiliaries.
Cleaning and Terminal tightness MARK - IV PLC Modules, Cards, I/O Modules, CIM Modules, AIO Modules TCM, PSM and Relay Modules etc of Unit I to IV.
Maintenance Work in DCDB Modules / Terminal tightness checking in Junction Boxes and Modules, Ignition Transformers in Unit I to IV and Auxiliaries / Checking the terminal tightness of street light pole junction boxes & Cleaning the dome of Street Lights..
Routine maintenance of Intercom/ Page & Party System, CCTV/ LAN/INTRANET and Taking Energy Meter reading /Cleaning of Tube light fitting.
Carrying out works in field instruments such as Pressure gauges & Switches, flow meters, level indicators , Temperature gauges & switches for any leakage of oil, air, water & fuel and checking readings for correctness and analysis if necessary and attending the defects noticed if any.
Maintenance and Rectification of indoor and outdoor lighting such as tube light fittings, LED normal/flood Light fittings etc., below 4.5mtrs height.
Maintenance and Rectification of indoor and outdoor lighting such as tube light fittings, LED flood Light & street light fittings etc., above 4.5mtrs height.
Maintenance of LT Motors below 25HP/18.5KW rating regular & breakdown works (once in 3 months).
Maintenance, Testing and Calibration of pressure and temperature gauges, pressure, temperature, level and flow transmitters /switches/ Flame Scanners, Spark Plugs / Level Switches / Limit Switches / Level indicators / Pick- ups / Vibration Sensor//Smoke Detectors/ Fire Detectors / RTD / Thermocouples/ ON/OFF Solenoid valves / Maintenance in Control Panel in Inlet Air Filter of Unit I to IV and Auxiliaries Panels related to C&I Control panels etc.
MARK-IV control loop checking of signals in Units I to IV through functional verification of pressure/temperature transmitters, switches, RTDs, thermocouples, flame scanners, transducers, etc.
Maintenance of Lighting transformer’s Regular & Break down. (once in Three months)
Maintenance of LT Motors above 25HP/18.5KW regular & breakdown works (once in 3 months).
Checking Earthing connection in Motors, Transformers and Modules, etc.
Rectification work in Intercom / CCTV /Page & Party /Replacement of Thermocouple / Replacement Mark-IV Cards work.
Impulse Line leak attending work by changing the ferrules and tightening/Impulse Line re-tubing work in Unit I to IV and Auxiliaries.
Replacement / Releasing and re-fixing of pressure / temperature / flow / level transmitters, switches, batteries, and other field instruments etc / Defect rectification in all Control Panels /Attending to the defect in Motors and modules.
Painting of Control Panels, junction boxes, modules in Unit I to IV and Auxiliary location motors and field instruments.
Handling of Materials to the work spot from Main Store Or Pocket Store.
Replacement of worn-out bearings in LT motors above 18.5 KW.
Replacement of worn-out bearings in LT Motors below 18.5KW.
Rectification of cable fault.
Control Cable Laying upto 2.5 sq.mm.
Power cable laying above 2.5 sq.mm.
Extension of Power supply for lighting welding, drilling, grinding, etc. for other agency / New Wiring for Wall Mounted Tube Light, Fan points, plug points, street light fittings, etc.
Testing of New lighting materials, power contactors, etc/Replacing of worn out Earthing connection in Equipments / Motors.
Cleaning of Accessory compartments
Cleaning of Turbine compartments
Cleaning of Load Gear & Exciter Compartments
Cleaning works in GT auxiliaries
Cleaning of outer areas of GTs
Cleaning the outside surfaces of drain tanks
Turbine lube oil top up
Lubrication in GT auxiliaries
Emptying the lube oil drain tank in units 1 / 2
Emptying fuel from units 1 / 2 drain tanks and moving, filling up this fuel into unit-3 drain tank
Grease/oil Lubrication of valves
Flex seal checking & bolts tightening
Removing guard for inspection of the starting clutch and refixing
Cooling water makeup work in GTs
Removing manhole door of inlet air/exhaust ducts for inspection and re-fixing
Maintenance works for 2 hours period
Maintenance works for 4 hours period
Maintenance works for one day period
Inlet air filters cleaning works units I / II
Inlet air filters cleaning works units III / IV
Cooling water radiator cleaning with air/water in GT unit
Removal of Fuel check valves/Water Injection Check Valves for checking and refixing
Removal of Fuel Nozzle assemblies, cleaning and refixing
Removal of Generator Air Filters, cleaning and refixing
Cleaning/Replacement of lube oil filter / lube oil in Diesel Engines
Cleaning/Replacement of Fuel filters/Air Filters in Diesel Engines
Rectification works involving Gas Cutting / Welding
Cleaning & Painting pipelines/equipment at ground level per Sq.m
Cleaning & Painting pipelines/equipment above ground level per Sq.m
Handling of Materials to the work spot from Main Store Or Pocket Store.
Moving and installing mobile pump for dewatering
R.O Cum D.M plant filters cleaning
RAMYA ELECTRICAL WORKS (BID ID -1499290)
SUDHA ELECTRICAL SERVICE (BID ID -1499781)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BBGTPSSpecification.pdf
Tender Documents • 1.22 MB
BOQ_731792.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid