Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-Finance | ₹7.9 L | 1 | Accepted-Finance Lottery Winner |
| 2 | 1₹7.9 LRejected-Finance 07 SIPAHBHATT SIPAHBHATT RUDAULI AYODHYA UTTAR PRADESH 225411 | 225411 | ₹7.9 L | 1 | Rejected-Finance L-1 |
| 3 | 1₹7.9 LRejected-Finance | ₹7.9 L | 1 | Rejected-Finance L-1 |
Tender Value
₹9.3 L
EMD Value
₹92,632
Closing Date
25 Feb 2026, 3:00 pmClosed
Excutive Engineer
Udyan Vibhag, Nagar Nigam Motijheel, Kanpur
Improvement work of I Block Gujani Situated in ward 55 Zone-5.
2026_NNKAN_1119407_1
700/UDYAN/2025-26
Open Tender
Civil Works
Fixed-rate
1180 days
Gujani
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹92,632
14 Aug 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
25 Feb 2026
23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scraping of old white or colour wash including refusal of dismantled material up to 60.0mtr distance as per direction by engg-in-charge. | - | Sqm | - | - |
| 2 | Dismantling of existing plaster including disposal of refuse as directed by engg. i/c. within a distance of 60mtr. | - | Sqm | - | - |
| 3 | Class-150 brick work supper structure above plinth lebel upto floor to lexle (upto two story) including necessary cutting and molding of brick work . | - | Cum | - | - |
| 4 | prooviding and fixing hand rail (M.S Tube )of approved size by welding etc all ladger railing balcony railing etc all complation of work | - | Kg | - | - |
| 5 | providing And laying Checkered terrazo tiles 20mm averege thick marbal chips of size up to 6mm .in floorson 25 mm thick bed of morter1:1:1 etc all complete. | - | Sqm | - | - |
| 6 | 12mm thick cement plaster in single coat on fair side in 1:4 cement, fine sand etc all complete. | - | Sqm | - | - |
| 7 | Providing and laying of wall putty for making wall surface smooth with labour T&P etc all complete. | - | Sqm | - | - |
| 8 | Finishing walls with extarial emiulsion paint (Apex) appeoved brand and manufecture and of requeird shead on wall surface all material, labour T&P etc all complete. | - | Sqm | - | - |
| 9 | Painting 1st Coat over priming coat (butt Excluding cost of priming coat) on steel and other metal surface upto 10cm width or girth or small articles not exceeding 0.10sqm in area with superior synthetic enamel.ready mix enamel paint of approved quality including supply of all material, labour tandP etc all complete. | - | Sqm | - | - |
| 10 | Devlopment of lawn by Catpeting of slection no-1 Grass incl. All complition of work. | - | Sqm | 1 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.83 MB
BOQ_2081515.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .