Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.0 L+₹37,926.20 (4.95%)Rejected-AOC NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | A.D.SUTHINDRAN | TEAM ENGINEERING AND CONSTRUCTION |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged RCC for the required width & depth as per the instruction of Engineer in charge and disposing the debris 1 Km. away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 12 | M3 | 58,800 ₹69,384 Lowest | 60,000 ₹70,800 |
| 2.00 | Strengthening the structure using MS Plates including cost of Materials, labour charges, cutting, fabrication charges, lead, lift, etc., complete. | 659.4 | Kg | 64,621.2 ₹76,253.02 Lowest | 69,237 ₹81,699.66 |
| 3.00 | Providing shuttering using steel structures including cost of all materials, labours, lead, lift, etc. complete. | 92.4 | M2 | 50,820 ₹59,967.6 Lowest | 55,440 ₹65,419.2 |
| 4.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 2,176 | Kg | 2,15,424 ₹2,54,200.32 Lowest | 2,17,600 ₹2,56,768 |
| 5.00 | Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 27.2 | M3 | 2,77,440 ₹3,27,379.2 Lowest | 2,99,200 ₹3,53,056 |
| 6.00 | Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete | 191 | M2 | 78,692 ₹92,856.56 Lowest | 81,175 ₹95,786.5 |
| 7.00 | Providing two coats of anticorrosive black paint to the newly plastered surface over a one coat of white cement primer including cost of all materials, labour, lead, lift, etc., complete. | 88.2 | M2 | 17,463.6 ₹20,607.05 Lowest | 18,081 ₹21,335.58 |
| 8.00 | Painting two coats of ready mixed enamel paint for the old steel surface including cost of all materials, labours, lead, lift, etc. Complete. | 22.7 | M2 | 3,405 ₹4,017.9 Lowest | 3,859 ₹4,553.62 |
Tender Value
Refer Docs
EMD Value
₹7,900
Closing Date
25 Jun 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Rectification Works to the Damaged Pedestals and Providing Encasing Concrete to the Structural Steel Columns along Pipe Rack PR 4 support columns in Unit 4 ESP to Chimney 3 along East side of Trench
2025_EB_565785_1
CE SE C TTPS Spec. No 137 25 26
Open Tender
Civil Works - Others
Item Rate
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,900
Yes
3 Oct 2025
6 Jun 2025
26 Jun 2025
6 Jun 2025
25 Jun 2025
6 Jun 2025
Dismantling the existing damaged RCC for the required width & depth as per the instruction of Engineer in charge and disposing the debris 1 Km. away from the site including cost of all materials, labours, lead, lift, curing, etc. complete.
Strengthening the structure using MS Plates including cost of Materials, labour charges, cutting, fabrication charges, lead, lift, etc., complete.
Providing shuttering using steel structures including cost of all materials, labours, lead, lift, etc. complete.
Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete.
Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete
Providing two coats of anticorrosive black paint to the newly plastered surface over a one coat of white cement primer including cost of all materials, labour, lead, lift, etc., complete.
Painting two coats of ready mixed enamel paint for the old steel surface including cost of all materials, labours, lead, lift, etc. Complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .