Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.9 LAccepted-AOC 160 PILLAIYAR KOIL STREET ANGARAYALLUR VILLAGE NARASINGARAYANPETTAI SENJI 604 202 | SENJI | VILLUPURAM | TAMIL NADU | 604202 | L1 | Accepted-AOC L1 | |
| 2 | L2₹81.4 L+₹1.5 L (1.87%)Rejected-AOC PALLA STREET VENGANTHUR VILUPPURAM | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Gopi S L1 | Naveen Constructions L2 |
|---|---|---|---|---|---|
| 1.01Strengthening the Road from Kovilpuraiyur - Kilakuppam Road Km 0/0 - 1/811 in Melmalayanur Block, Villupuram District. | |||||
| 1.02 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,582.32 | Sqm | 6 ₹9,493.92 Lowest | 15 ₹23,734.8 |
| 1.03 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 B | 710.75 | Cum | 140 ₹99,505 Lowest | 190 ₹1,35,042.5 |
| 1.04Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 1.05 | Km 0/0 - 1/0 | 112.23 | Cum | 1,074.84 ₹1,20,629.29 Lowest | 1,074.84 ₹1,20,629.29 Lowest |
| 1.06 | Km 1/0 - 1/811 | 36.11 | Cum | 1,084.27 ₹39,152.99 Lowest | 1,084.27 ₹39,152.99 Lowest |
| 1.07 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 618.09 | Sqm | 3,044.86 ₹18,81,997.52 Lowest | 3,044.86 ₹18,81,997.52 Lowest |
| 1.08 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 4,944.75 | Sqm | 84.94 ₹4,20,007.07 Lowest | 95 ₹4,69,751.25 |
| 1.09 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 4,944.75 | Sqm | 19.5 ₹96,422.62 Lowest | 25 ₹1,23,618.75 |
| 1.10 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 123.62 | Cum | 12,271.23 ₹15,16,969.45 Lowest | 12,271.23 ₹15,16,969.45 Lowest |
Tender Value
₹84.0 L
EMD Value
₹85,000
Closing Date
3 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Additional Collector
DRDA, Viluppuram
TNVPM/MGSMT-III/25-26/50
2025_RDTN_594158_33
TNVPM/MGSMT-III/25-26
Open Tender
Civil Works
Works
180 days
Viluppuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹85,000
Yes
3 Oct 2025
18 Aug 2025
3 Sept 2025
18 Aug 2025
3 Sept 2025
25 Aug 2025
Amount
Strengthening the Road from Kovilpuraiyur - Kilakuppam Road Km 0/0 - 1/811 in Melmalayanur Block, Villupuram District.
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 B
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Kilometer stone
Provision for Hectometer Stone
60 cm Equilateral triangle cautionary signboard
Provision for 15 nos of rumble strips covered with premix bituminious carpet whit strip of road marking paint
Construction of 1.5.0 m RCC Slab culvert @ 200m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B etc
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Superstructure
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Supplying and erecting shutterin incliding all 13cm diad spaced at 75cm c/c complete complying with standard specification
Centering B/GL
Centering A/GL
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing Cc pavement Ch 1355 - 1600
Supplying and erecting Shuttering incliding all complying with standard specification including all labour charges etc.complete
Construction of un reinfirced dowel lointed at expansion and construction joint only plain cement concrete pavement thickness as per design
Providing C C Hard Pavement pavement
Supplying and erecting Shuttering incliding all complying with standard specification including all labour charges etc.complete
Construction of un reinfirced dowel lointed at expansion and construction joint only plain cement concrete pavement thickness as per design
Provision for photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Naveen Constructions (BID ID -1444257)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .