| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32,023.44Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹33,166.27+₹1,142.83 (3.57%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S ASL ENTERPRISE L1 | Vijayakumar L2 |
|---|---|---|---|---|---|
| 1.00Construction of Drain Cover Slab at Karuppanur Colony in Karuppanur Panchayat. | |||||
| 2.00 | Supplying And Erection Of Steel Centering For Sides And Soffits Inclduing Cost And Conveyance Of All Charges | 6.79 | Cum | 542.02 ₹3,680.35 Lowest | 550.5 ₹3,737.9 |
| 3.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.14 | MT | 91,271.57 ₹12,960.56 Lowest | 96,193.5 ₹13,659.48 |
| 4.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.06 | Cum | 9,249.62 ₹9,804.6 Lowest | 9,443.05 ₹10,009.63 |
| 5.00 | Provision Name Board Charges | 1 | No | 693 ₹693 Lowest | 700 ₹700 |
| 6.00 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount ( in Rupees) | 4,884.93 ₹4,884.93 Lowest | 5,059.26 ₹5,059.26 |
Tender Value
Refer Docs
Closing Date
24 Sept 2026, 3:00 pmClosed
The Block Development Officer VP
The Block Development Officer VP
Tirupathur District Village Panchayat General Fund - 2026-2027 Construction of Drain Cover Slab at Karuppanur Colony in Karuppanur Panchayat Package No.01
2026_RDTN_703060_1
A1/1585/2026
Open Tender
Civil Works
Item Rate
180 days
Tirupathur Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
25 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
24 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Drain Cover Slab at Karuppanur Colony in Karuppanur Panchayat. | - | - | - | - |
| 2 | Supplying And Erection Of Steel Centering For Sides And Soffits Inclduing Cost And Conveyance Of All Charges | 6.79 | Cum | - | - |
| 3 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.14 | MT | - | - |
| 4 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.06 | Cum | - | - |
| 5 | Provision Name Board Charges | 1 | No | - | - |
| 6 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount ( in Rupees) | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_845138.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .