Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.1 Cr
EMD Value
₹4.1 L
Closing Date
23 Feb 2022, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TP1/Chennai
A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
Replacement of existing old damaged 230 KV DC tower in the existing Loc.No.13 to 15 of NCTPS-Tondiarpet I and II feeders 230 KV C line for the railway crossing span near AthipattuPudhu Nagar stations in the Chennai Gudur section
2022_EB_221390_1
TP1-34/2021-22
Open Tender
Civil Works
Works
120 days
chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4.1 L
24 Feb 2022
28 Jan 2022
24 Feb 2022
28 Jan 2022
23 Feb 2022
28 Jan 2022
180 days
Amount
Fabrication, galvanishing and supply of various type of normal, narrow base tower & extension tower parts, tower body/leg extension, supply of Stub & Cleat complete (excluding bolts and nuts) and including transport charge, hangers,d-shackles and all taxes etc complete as per standard specification GI Tower parts HT
Fabrication, galvanishing and supply of various type of normal, narrow base tower & extension tower parts, tower body/leg extension & supply of stub & cleat etc., complete (excluding bolts, nuts)and including transport charge, hangers,d-shackles and all taxes etc complete as per standard specification GI Tower parts MS
Supply of Hot dipped hexaganal GI bolts&Nuts, including step bolts, packing washers and electro galvanished spring washers as per relevent latest IS including transport charge and all taxes etc completeas per standard specification.
Optic fibre ground wire with 48 fibres as per technical specification including cost of all required suitable tension clamp, suspension clamp, vibration dampers, joint/junction boxes for OPGW and all accessories including transport and all taxes etc, complete as per standard specification.
Supply of Single suspension fittings for Zebra including transport charge and all taxes etc, complete as per standard specification.
Supply of Single Tension fittings for Zebra including transport charge and all taxes etc, complete as per standard specification.
Supply of Double Tension fittings for Zebra including transport charge and all taxes etc, complete as per standard specification.
Supply of Mid span compression joint for ACSR Zebra conductor including transport charge and all taxes etc, complete as per standard specification.
Supply of Repair sleeve for ACSR Zebra conductor including transport charge and all taxes etc, complete as per standard specification.
Supply of Vibration Damper for Zebra conductor including transport charge and all taxes etc, complete as per standard specification.
Supply of Earth wire tension clamp for 7/3.66mm EW including transport charge and all taxes etc, complete as per standard specification.
Supply of Flexible copper bonds for earth wire including transport charge and all taxes etc, complete as per standard specification.
Supply of Midspan compression joint for 7/3.66 mm Earth Wire including transport charge and all taxes etc, complete as per standard specification.
Supply of Vibration damper for Earth wire 7/3.66mm including transport charge and all taxes etc, complete as per standard specification.
Supply of Number plate including transport charge and all taxes etc, complete as per standard specification.
Supply of Danger board including transport charge and all taxes etc, complete as per standard specification.
Supply of Phase Plate including transport charge and all taxes etc, complete as per standard specification.
Supply of Circuit plate including transport charge and all taxes etc, complete as per standard specification.
Supply of Anti-Climbing devices including transport charge and all taxes etc, complete as per standard specification.
Supply of Name Plate Near road including transport charge and all taxes etc, complete as per standard specification.
Clearing heavy jungle for surveying including cost of all materials, leads, lifts etc., complete.
Conducting Check survey in the already fixed route, fixing of tower locations and pit marking
Forming approach road by filling with good quality earth / quarry rubbish over slushy soil including cost of materials , transport charges all labour lead and lift etc. complete.
Earth work excavation for sinking of wells in hard gravelly soil,stiff clay, black cotton soil, with initial lead and lift of etc., complete. Upto 2m
Earth work excavation for sinking of wells in hard gravelly soil,stiff clay, black cotton soil, with initial lead and lift of etc., complete. above 2m
Providing, cutting, bending, binding, laying, transporting and fixing in position at up to any levels (depth & height) steel reinforcement bars for all concrete works including 16 gauge annealed M.S. wire, spacer blocks of C.M. 1:2 with embedded binding wire of suitable length, protective coat of neat cement slurry to be applied as per Engineer-in-charge etc. complete. Bar bending schedule to be prepared by contractor. Any variation in reinforcement will be adjusted as per B.B.S. (Bar bending schedule) subject to approval and joint record by Engineer-in-Charge.
Supply and erection of well rings for foundation pit and Soak pit each measuring 0.3m in depth for a depth of 3.45 m 2400mm
PCC 1:2:4 using 12 to 20mm HB Stone for foundation without form work including cost of cement all materials labour etc., complete.
PCC 1:2:4, with 20 mm HBG metal for the tower foundation including cost of all material lead, lift etc., complete.With form box for muffing and coping
Plastering with cement mortar 1:3, 12mm thick including cost of all materials, labour, lead, lift, etc., complete. as directed by the department Engineer at site
Mobilisation of Piling equipment to site including transporting to site, Transport of piling/boring equipment such as boring rig, winches and motors,bentonite pump shells,boiler casing pipe etc into river/odai/channel /streeam/lake locations by pulling into crane including transport,hire charges etc complete as per standard specification and as directed by the engineer incharge
Setting of pilling and boring equipement, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig pile including mobilisation and demobilisation after completion of pilling works etc., complete as per standard specification and as directed by the engineer incharge.
Boring, providing and installation of bored Cast-in-situ 1000mm RCC vertical piles of specified diameter and of any length below the pile cap with M25 grade of cement concrete, excluding the cost of supply & placing the reinforcement steel but including the cost of boring with temporary Guide casing, bentonite solution and the length of pile to be embeded in the pile cap (length of pile for payment shall be measured from bottom of pile cap), all necessary labour, materials, plants, tools & tackles etc.,complete,as necessary for proper execution of the job. (Boring in weathered rock, shale, fissured rock and soft rock excluded).
Chipping and dismantling of weak pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete.
Providing and laying plain cement concrete 1:3:6 (1cement : 3 coarse sand: 6 graded stone aggregate 40mm nominal size) including cement, all necessary tools and tackles, labour, materials, equipments for handling, transportation, mixing, placing, vibrating, dewatering etc.all complete.
Providing and laying in position M30 Grade concrete of specified 28 days strength for pile caps, pedestal/chimney specified 28 days strength for pile caps, pedestal/chimney and tie beam(if required), excluding reinforcement steel and form work but including cement, all necessary tools and tackles,labour, materials, equipments for handling, transportation, batching, mixing, placing, vibrating, dewatering etc. all complete (excluding cost of concrete in piles which is included in item no.14).
Supply and Providing M.S. liner of 6mm. thick in piles upto 10M Depth (maxm.) from bottom of pile cap, limited to the approved drawing, including supply, straightening, bending, welding,all supports, labours, tools and tackles, plants & equipments, with primer and paintinting etc. (complete) as required for successful completion of the job
Transport, installation of stub & cleats in position & alignment including cost of template assembly, prop setting arrangements transportation charges etc, complete.
Transport & erection of various type of towers, tower extension (complete) including tack welding of bolts & nuts, supply of zinc rich primer, enamel paint and application of one coat of zinc rich primer and two coats of zinc rich enamel paint over the welded portion as per technical specification and as directed by the Engineer
Pipe type earthing
Labour charges for Transporting and hoisting of 120 kN Antifog Single tension polymerinsulators of 14 units under LC condition including cost of all labour, lead, lift etc. complete. Under LC condition
Labour charges for Transporting and hoisting of 90 kN Antifog Single tension polymer insulators of 13 units under LC condition including cost of all labour, lead, lift etc. complete. Under LC condition
Releasing and restringing of insulator strings complete with arcing horns & necessary hardware, stringing of 6nos of Kundah conductor (2 circuites) including all Labour charges for transporting and paying out, jointing, rough sagging, tensioning, clipping, providing vibration dampers including giving jumper connections for lead lift etc., complete as directed by the Engineer in charge with safety and precaution under L.C condition
Installation of insulator strings complete with arcing horns & necessary hardware, stringing of 6nos of Zebra conductor (2 circuites) including all Labour charges for transporting and paying out, jointing, rough sagging, tensioning, clipping, providing vibration dampers including giving jumper connections for lead lift etc., complete as directed by the Engineer in charge with safety and precaution under L.C condition
Installation & stringing of 1No. earthwire including fixing of hardware fittings and accessories including all Labour charges for transporting and paying out, jointing, rough sagging, tensioning, clipping, providing vibration dampers including giving jumper connections for lead lift etc., complete as directed by the Engineer in charge with safety and precaution under L.C condition
Providing tack welding of all the bolts & nuts (at least 3 places in erected towers from GL to X-arm bottom level including painting of welded portion with two coats of best quality of cold galvanised paint having at least 90% zinc content and approved by the engineer at site including cost of paint andall other materials lead lift etc complete
Strengthening of damaged tower legs with new absolute angles and welding continously and labour for fabrication erection galvanising wth all labour lead lift etc complete
Arranging and availing shutdown on LT / HT lines for stringing operation including cost of all lead and lift etc. complete.
Providing well supported trussels up to 5m height for road crossing including cost of all materials labour, lead, lift etc complete as directed by the engineer at site.
Providing temporary guys/ stay including cost of earth work, refilling, labour, lead, lift, etc complete.
Towards charges for Hot line stringing work including all charges, lead, lift, equipement, etc.
labour Charges for Dismanteling of Zebra conductors 6 Nos under L.C condition and devoluted to stores including cost of all labour, lead and lift etc. complete and as directed by the Dept. Engineer at site.
Labour charges for dismantling earth wire - 1 No. under LC condition and devoluted to stores including cost of all labour, lead and lift etc. complete and as directed by the Dept. Engineer at site..
Dismantling the insulator string including cost of labour for releasing, Tools and plants transporting charges from site etc complete for 14 units of 120 KN Disc Insulators and devoluted to stores.
Dismantling the insulator string including cost of labour for releasing, Tools and plants transporting charges from site etc complete for 13 units of 90 KN Disc Insulators and devoluted to stores.
Labour charges for dismantling of existing tower and devoluted to stores including cost of all labour, lead and lift etc. complete and as directed by the Dept. Engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .