Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.5 CrAdmitted-Finance | ₹41.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹43.5 CrAdmitted-Finance MORENA | MORENA | MADHYA PRADESH | 476001 | ₹43.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹45.1 CrAdmitted-Finance | ₹45.1 Cr | L3 | Admitted-Finance |
| 4 | L4₹45.7 CrAdmitted-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | ₹45.7 Cr | L4 | Admitted-Finance |
| 5 | L5₹52.8 CrAdmitted-Finance | ₹52.8 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Jal Instruments L1 | M/s Bhagwati Enterprises L2 | Dineshchandra R Agrawal Infracon Pvt. Ltd. L4 | V.L.Infraprojects Limited L5 | KRISHNA CONSTRUCTION (Gujarat) LLP L3 | M/S P L ADKE L6 | CVK CONSTRUCTIONS PVT LTD L8 | DARSHIL BUILDCON L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | 1. Design and build 3 sewage treatment plant of installed capacity 5.90,2.60 & 0.40 MLD and all appurtenant structures and allied works;
2. Construction of 1 Nos of Gravel Sand Filter of capacity 100 KLD.
3. Construction of Retaining Wall of length 100 m along the Nallah for STP.
4. Construction of 4 Nos. Interception and Diversion Structure
5. Construction of RCC sump well along with providing and installing pumps and pumping main Comprising of DI-K-7 class pipe of 150- 200 mm diameter having length of 3000 m respectively for reuse purpose.
6. Construction of RCC sump well along with providing and installing pumps and pumping main Comprising of DI-K-7 class pipe of 100 to 400 mm diameter having length of 1800 m respectively from Sump well to STP.
7. Providing, laying and jointing of NP-3 pipe of 300 mm Dia of length 100m for discharge of treated water.
8. Construction of RCC wall along the nallah of 1500 m length
9. Providing and laying of HT Feeder having length of 6.00 kms. and Electrical 1 Nos. Substation
10. On grid Solar Photo voltaic Power Plant of 200, 200 & 50 kw | 1 | LumpSum | 26,87,48,127.57 ₹26,87,48,127.57 | 25,00,00,000 ₹25,00,00,000 Lowest | 25,94,48,648 ₹25,94,48,648 | 27,01,35,320 ₹27,01,35,320 | 26,50,00,000 ₹26,50,00,000 | 30,38,70,000 ₹30,38,70,000 | 31,20,00,000 ₹31,20,00,000 | 30,08,00,000 ₹30,08,00,000 |
| 1.02 | Operation and Maintenance Cost For 1st Years | 1 | LumpSum | 48,42,000 ₹48,42,000 | 49,00,000 ₹49,00,000 | 45,00,000 ₹45,00,000 Lowest | 58,74,960 ₹58,74,960 | 54,00,000 ₹54,00,000 | 54,76,000 ₹54,76,000 | 85,60,000 ₹85,60,000 | 99,85,000 ₹99,85,000 |
| 1.03 | Operation and Maintenance Cost For 2nd Years | 1 | LumpSum | 51,32,520 ₹51,32,520 | 51,94,000 ₹51,94,000 | 49,50,000 ₹49,50,000 Lowest | 62,27,457.6 ₹62,27,457.6 | 58,00,000 ₹58,00,000 | 58,04,560 ₹58,04,560 | 85,60,000 ₹85,60,000 | 1,00,00,000 ₹1,00,00,000 |
| 1.04 | Operation and Maintenance Cost For 3rd Years | 1 | LumpSum | 54,40,471.2 ₹54,40,471.2 Lowest | 55,05,640 ₹55,05,640 | 54,45,000 ₹54,45,000 | 66,01,105.06 ₹66,01,105.06 | 60,00,000 ₹60,00,000 | 61,52,833.6 ₹61,52,833.6 | 85,60,000 ₹85,60,000 | 1,00,00,000 ₹1,00,00,000 |
| 1.05 | Operation and Maintenance Cost For 4th Years | 1 | LumpSum | 57,66,899.47 ₹57,66,899.47 Lowest | 58,35,978 ₹58,35,978 | 59,89,500 ₹59,89,500 | 69,97,171.36 ₹69,97,171.36 | 65,00,000 ₹65,00,000 | 65,22,003.62 ₹65,22,003.62 | 85,60,000 ₹85,60,000 | 1,00,00,000 ₹1,00,00,000 |
| 1.06 | Operation and Maintenance Cost For 5th Years | 1 | LumpSum | 61,12,913.44 ₹61,12,913.44 Lowest | 61,86,137 ₹61,86,137 | 65,88,450 ₹65,88,450 | 74,17,001.65 ₹74,17,001.65 | 69,00,000 ₹69,00,000 | 69,13,323.83 ₹69,13,323.83 | 85,60,000 ₹85,60,000 | 1,00,00,000 ₹1,00,00,000 |
| 1.07 | Operation and Maintenance Cost For 6th Years | 1 | LumpSum | 64,79,688.25 ₹64,79,688.25 Lowest | 65,57,305 ₹65,57,305 | 72,47,295 ₹72,47,295 | 78,62,021.75 ₹78,62,021.75 | 72,00,000 ₹72,00,000 | 73,28,123.26 ₹73,28,123.26 | 85,60,000 ₹85,60,000 | 1,00,00,000 ₹1,00,00,000 |
| 1.08 | Operation and Maintenance Cost For 7th Years | 1 | LumpSum | 68,68,469.54 ₹68,68,469.54 Lowest | 69,50,744 ₹69,50,744 | 79,72,025 ₹79,72,025 | 83,33,743.05 ₹83,33,743.05 | 75,00,000 ₹75,00,000 | 77,67,810.66 ₹77,67,810.66 | 85,60,000 ₹85,60,000 | 1,10,00,000 ₹1,10,00,000 |
| 1.09 | Operation and Maintenance Cost For 8th Years | 1 | LumpSum | 72,80,577.71 ₹72,80,577.71 Lowest | 73,67,788 ₹73,67,788 | 87,69,228 ₹87,69,228 | 88,33,767.63 ₹88,33,767.63 | 81,00,000 ₹81,00,000 | 82,33,879.3 ₹82,33,879.3 | 85,60,000 ₹85,60,000 | 1,20,00,000 ₹1,20,00,000 |
| 1.10 | Operation and Maintenance Cost For 9th Years | 1 | LumpSum | 77,17,412.38 ₹77,17,412.38 Lowest | 78,09,856 ₹78,09,856 | 96,46,151 ₹96,46,151 | 93,63,793.69 ₹93,63,793.69 | 87,00,000 ₹87,00,000 | 87,27,912.06 ₹87,27,912.06 | 85,60,000 ₹85,60,000 | 1,30,00,000 ₹1,30,00,000 |
Tender Value
₹29.7 Cr
EMD Value
₹14.8 L
Closing Date
2 Jul 2026, 5:30 pmClosed
CMO
Nagar Parishad Sarni
Interception and Diversion of Nallahs with STP works Project of SARNI town under SBM 2.0 (2nd Call)
2026_UAD_516171_1
417-Etender Date 16/06/2026
Open Tender
Civil Works - Others
Item Rate
548 days
Nagar Parishad Sarni
As per Tender Document
3 documents required · 3 mandatory
₹50,000
₹14.8 L
Nagar Parishad Sarni
14 Aug 2026
17 Jun 2026
3 Jul 2026
17 Jun 2026
2 Jul 2026
25 Jun 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 1. Design and build 3 sewage treatment plant of installed capacity 5.90,2.60 & 0.40 MLD and all appurtenant structures and allied works;
2. Construction of 1 Nos of Gravel Sand Filter of capacity 100 KLD.
3. Construction of Retaining Wall of length 100 m along the Nallah for STP.
4. Construction of 4 Nos. Interception and Diversion Structure
5. Construction of RCC sump well along with providing and installing pumps and pumping main Comprising of DI-K-7 class pipe of 150- 200 mm diameter having length of 3000 m respectively for reuse purpose.
6. Construction of RCC sump well along with providing and installing pumps and pumping main Comprising of DI-K-7 class pipe of 100 to 400 mm diameter having length of 1800 m respectively from Sump well to STP.
7. Providing, laying and jointing of NP-3 pipe of 300 mm Dia of length 100m for discharge of treated water.
8. Construction of RCC wall along the nallah of 1500 m length
9. Providing and laying of HT Feeder having length of 6.00 kms. and Electrical 1 Nos. Substation
10. On grid Solar Photo voltaic Power Plant of 200, 200 & 50 kw | - | LumpSum | 29,68,52,000 | - |
| 1.02 | Operation and Maintenance Cost For 1st Years | - | LumpSum | 64,56,000 | - |
| 1.03 | Operation and Maintenance Cost For 2nd Years | - | LumpSum | - | - |
| 1.04 | Operation and Maintenance Cost For 3rd Years | - | LumpSum | - | - |
| 1.05 | Operation and Maintenance Cost For 4th Years | - | LumpSum | - | - |
| 1.06 | Operation and Maintenance Cost For 5th Years | - | LumpSum | - | - |
| 1.07 | Operation and Maintenance Cost For 6th Years | - | LumpSum | - | - |
| 1.08 | Operation and Maintenance Cost For 7th Years | - | LumpSum | - | - |
| 1.09 | Operation and Maintenance Cost For 8th Years | - | LumpSum | - | - |
| 1.1 | Operation and Maintenance Cost For 9th Years | - | LumpSum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TenderDocumentxxSarni.pdf
Tender Documents • 1.43 MB
BOQ_621670.xls
BOQ • 0.27 MB
AnnexureE.pdf
Additional Documents • 2.68 MB
Annexure-B.pdf
Additional Documents • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].