| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.7 LAccepted-AOC | L1 | Accepted-AOC Work completed | |
| 2 | L2₹30.7 L+₹405.89 (0.01%)Rejected-Finance | L2 | Rejected-Finance Other Than Lowest | |
| 3 | L3₹30.7 L+₹406.80 (0.01%)Rejected-Finance HIMACHAL PRADESH HP | L3 | Rejected-Finance Other Than Lowest | |
| 4 | L3₹30.7 L+₹406.80 (0.01%)Rejected-Finance 178 A HIGHWAY PLAZA SEC 124 SUNNY ENCLAVE MOHALI PUNJAB 140301 | S A S NAGAR | PUNJAB | 140301 | L3 | Rejected-Finance Other Than Lowest | |
| 5 | L3₹30.7 L+₹406.80 (0.01%)Rejected-Finance | L3 | Rejected-Finance Other Than Lowest |
Tender Value
₹43.9 L
EMD Value
₹87,800
Closing Date
15 Oct 2022, 11:00 amClosed
Executive Engineer
Executive Engineer Salooni Division HPPWD Salooni
Formation cutting 2.75/5.00 metre wide road K.M. 0/0 to 2/300 and construction of wire crate for dumping site
2022_PWD_66122_1
Ee Salooni letter No. 10069-10119 dated 03-10-2022
Open Tender
Civil Works
Item Rate
90 days
Salooni
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,000
₹87,800
29 Nov 2023
7 Oct 2022
15 Oct 2022
7 Oct 2022
15 Oct 2022
7 Oct 2022
Amount
Excavation in hilly areas in all heights and depths and in all kinds of soil by all means including saturated soil comprising of ordinary soil ,ordinary rock, soft rock ,hard rock chiseling/wedging out rock(where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines, grades, width, cutting and trimming of side slopes and levels as shown on the drawings and as directed by Engineer-in-Charge at site, according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same within all leads and lifts in acquired road width of the road and transportation of un-useful materials for filling in roadways camber ,embankments for grade improvements and disposal of all surplus materials to required width of the road or on approved dumping sites through all modes of transportation including head load or animal transport or mechanical means alongwith its leveling fine dressing and hauling /carriage of machineries ,materials, tools ,equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. Recovery of stones shall be effected from the contractor,s running bills actually excuted at site on pro-rata basis for the quantity of cutting in earth work executed . Any loss to the public/ private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him in all cases, including carriage of materials with in all leads and lifts. The rate is including royality, Malkana,Tol tax, sale tax, GST or other taxes imposed by the Government.
Earth work in excavation for structures in all depths as per drawing and M.O.R.D.technical specification section 300 and 1600 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all lead and lift including dressing of sides and bottom and back filling in trenches with excavated Suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation including rock excavation shall be carried out true to lines grades, side slopes, width, camber super elevation and level as shown on the drawings or as directed by the Engineer-in-Charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner, filling of unevenness blind age and finishing the road to specified dimension or as directed by the Enginer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be removed by suitable diversion, bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. Any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his own cost in all cases.The rate is including royality, Malkana,Toll tax, sale tax, GST or other taxes imposed by the Government.
Providing and laying of boulder apron laid in wire crates with 4 mm (four millimetre diametre) dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm (one hundred millimetre into one hundred millimetre) mesh (woven diagonally) including 10 (ten) per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg (forty kilogram) each as per drawing and technical specifications section 1300 including leads, lifts and other incidental complete in all respect including hauling /carriage of materials to various location through all modes of transportation in and as per the direction of Engineer-In-Charge.The rate is including royality, Malkana,Toll tax, GST or other taxes imposed by the Government.
Jarmo
Kehar Singh
Vikas Verma
Muhamad Yunas
Ajay Kumar
Pardeep Sharma
HIMTECH CONSTRUCTION CO
Mohd. Ashraf
NAZAKAT ALI GOVT. CONTRACTOR
Ashiq Mohd
Kamlesh Kumar
Yusav Khan
Surender Singh
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .