Tender Value
₹18.4 L
EMD Value
₹36,760
Closing Date
7 Feb 2024, 4:00 pmClosed
Office of the SUPERINTENDING ENGINEER, OMC-I, 2x2
Office of the SUPERINTENDING ENGINEER, OMC-I, 2x210MW, BTPS, Parichha, Jhansi
Complete operation, Routine Checking and Breakdown maintenance of Pre treatment plant, Effluent Treatment plant, Chlorination Plant and their associated equipment /system in 2x210 MW, PTPP, Parichha
2024_RVUNL_878847_1
N-PAR/B/OMC1/CAD/6000004344_00
Open Tender
Power/Energy Projects/Products
Lump-sum
730 days
EE CAMD BTPS
As per PQC
3 documents required · 3 mandatory
₹1,180
Dy. CAO, CFA and BO
₹36,760
16 Feb 2024
8 Jan 2024
9 Feb 2024
9 Jan 2024
7 Feb 2024
9 Jan 2024
9 Jan 2024 - 25 Jan 2024
Amount
(A)Work under Priority list ‘A’ 1.Complete operation and routine checking of PT plant of 2X210 MW PTPP Parichha (in 02 shifts in a day as per scope of work enclosed).
2.Complete operation and routine checking of ETP plant of 2X210 MW, PTPP, Parichha (in 02 Shift)
3.Routine checking, Complete Operation of Chlorination plant (Capacity 150kg/hr and 30kg/hr) and its auxiliaries in general shift of 2X210 MW, PTPP, Parichha.
4.Additional manual dosing of required chemicals i.e. alum, PAC, lime, bleaching powder and PE etc. to maintain the standard parameter during rainy season at PT plant (for proper dosing at least additional 02 persons/shift extra required for Round the clock operation)
PART-B(Work under Priority ‘B’ ) (a) B/D maintenance of following item of PT plant 1.Maintenance/attending Breakdown of lime dosing solution/ Alum dosing solution /PAC dosing solution preparation tank’s agitator assembly (including gear box) of PT plant (as per scope of work)
2.Maintenance/Breakdown Main. Alum Dosing pump, PAC Dosing pump.
3.Maintenance/ Breakdown maintenance of Lime dosing pump
4.Maintenance/ attending leakages of PVC pipe lines.
5.Complete cleaning and removal of foreign material from chemical tanks their strainer, servicing of level gauge glass and back washing of tank etc.
6.Removal of chocking and flushing of pipelines of chemical tank.
7.Maintenance/Breakdown maintenance of Sludge disposal pump
8.Attending breakdown of bearing of sludge disposal pump.
9.Manual cleaning of sludge pit of PT plant, mud, chemical & other wastes etc. and disposal of same to suitable remote place
10.Maintenance of central bearing of clariflocculator bridge which includes dismantling bearing housing, changing bearing /repairing bearing housing and assembling etc.
11.Maintenance/Breakdown maintenance of end carriage drive
12.Maintenance/Breakdown maintenance of flocculator paddles assembly (includes reduction gear box, bevel gear box, pulleys unit & shaft).
13.Maintenance of MS rail of peripheral clarifier wall of clariflocculator bridge which includes dismantling bear bridge and associated system which includes repairing/welding etc
14.Maintenance of scrapper of clariflocculator bridge which includes dismantling bear, constant bleeds line and removing chocking of sludge line and removal of accumulated sludge from the system.
15.Maintenance of flash mixer agitator (includes gear box, mixing paddles and associated system).
16.(b)1.B/D maintenance of following item at Effluent Treatment Plant B/D maintenance of pumps (i)CMB pump
(ii) Common sump pump
(iii)Sludge pump
2.Replacement of gate valve
3.Replacement of Butterfly/Ball valve
4.Repairing & maintenance of gate valves & butterfly valves
5.Maintenance of NRV (fabrication & fitting of flap seat of different size NRV) (i)50 mm
(iii) 150 mm
6.Maintenance of blower
7.Maintenance of gear box of flash mixer/Alum agitator/lime agitator
(c)B/D maintenance Chlorination Plant 1.Maintenance/servicing of CW Chlorinator
2.Maintenance/servicing of CW evaporator
3.Maintenance/servicing of RW Chlorinator
4.Maintenance/servicing/cleaning of Cl2 absorption tower
5.Maintenance/servicing of CW Ejector Assembly with associated NRV & valves
6.Maintenance/servicing of RW Ejector assembly with associated NRV & valves
7.Maintenance/servicing of complete tonner manifold of CW with associated valves & expansion cylinders
8.Maintenance/servicing of complete tonner manifold of RW with associated valves.
9.Maintenance/servicing of CW Chlorine dispenser lines of one chlorinator & evaporator with all associated valves & filters
10.Maintenance/servicing of RW Chlorine dispenser lines of one chlorinator & evaporator with all associated valves & filters
11.Maintenance/servicing of Chlorine suction Duct network
12.Maintenance of CW Booster pump
13.Maintenance of RW Booster pump
14.Maintenance of Caustic Recirculation pump
15.Maintenance/servicing of valves, size (i)200/150/100 mm
16.Maintenance/servicing of NRV, size (i)100/80/50 mm
17.Repair of MS pipeline work to arrest leakages
18. of underground HDPE CW pipe line to arrest leakage of chlorine solution
19.Repair of underground HDPE RW pipe line to arrest leakage of chlorine solution
20.Maintenance/Servicing of CW fore bay chlorine solution diffuser with associated valves
21.Maintenance/Servicing of RW partial flume chlorine solution diffuser with associated valves
22.Replacement of CW chlorinator PVC vacuum pipeline with associated bends, tees, unions, flanges etc.
23.Replacement of RW chlorinator PVC vacuum pipeline with associated bends, tees, unions, flanges etc.
24.Fabrication of lead gaskets (i) Size- 2 inch
(ii)Size -1 inch
25.Repairing of dispenser pipe line/flanges using appropriate filler material
26.Refilling with maintenance/servicing of BA set
27.Conditioning of chlorine dispenser lines with associated valves, flanges etc.
28.Conditioning of absorption tower with associated valves, pumps, blowers etc
29.Conditioning of water lines with associated pumps, valves, ejectors etc
30.Maintenance of Emergency shower with associated pipe line & valve connected to the source
31.Maintenance of Respiratory Air supply lines with associated valves and connections etc.
M/S S.K.ENGINEERING WORKS
M/S BALRAM ENGINEERS CONTRACTOR AND SUPPLIERS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .