Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance 19 LAKE TEMPLE ROAD KOLKATA 700029 | KOLKATA | WEST BENGAL | 700029 | ₹5.0 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹5.0 LRejected-Finance BAZARPARA ULUBERIA HOWRAH 711316 | ULUBERIA | HOWRAH | WEST BENGAL | 711316 | ₹5.0 L | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹5.0 LRejected-Finance | ₹5.0 L | L3 | Rejected-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | SUBHRA ENTERPRISE L2 | Shinryo Suvidha Engineers India Pvt. Ltd. L1 | GITANJALI ELECTRONICS AND ELECTRICALS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Repairing ,Servicing , Reinstallation ,Testing & Commissioning of HVAC dedicated VFDs suitable for the following fan motor capacities (The integration of the VFD with fan motor is included in this item) with IP 20 enclosures with Mains disconnect, complying with the tender specifications and having. Built-in dual 5% impedance DC link reactor on the positive and negative rails of the DC bus of the VFD. Provision for additional 2 PID controllers to control external devices such as chilled water modulating valve, fresh air damper, etc. thus reducing the number of I/Os in DDC Controllers & improving system reliability MODBUS RTU as the communication protocol between BMS & VFDs Automatic Energy Optimization for maximum energy savings. VFD is to be fixed in electrical VFD panel. | 3 | Each | 39,896 ₹1.2 L | 39,800 ₹1.2 L | 39,959 ₹1.2 L |
| 2.00 | SITC of Pre-Filters for Air Handling unit of size : 610 mm x 610 mm x 50 mm | 12 | Each | 3,458 ₹41,496 | 3,450 ₹41,400 | 3,464 ₹41,568 |
| 3.00 | Repairing & Replacement of 1 x 185 TR Chiller Display (SL No- RTWD63D113BAT17091902) | 1 | Each | 44,707 ₹44,707 | 44,600 ₹44,600 | 44,778 ₹44,778 |
| 4.00 | Replacement of Thermostats for monitoring and controlling temperature | 3 | Each | 11,628 ₹34,884 | 11,600 ₹34,800 | 11,646 ₹34,938 |
| 5.00 | SITC of Water Temperature Sensor for 3 nos 185 TR Chiller Unit ( Including Software programming of Sensor) (Make -Trane/Bluestar) | 6 | Each | 28,568 ₹1.7 L | 28,500 ₹1.7 L | 28,614 ₹1.7 L |
| 6.00 | Replacement of damaged Shaft and SS sleeve of condenser water pump. | 1 | Each | 38,191 ₹38,191 | 38,100 ₹38,100 | 38,252 ₹38,252 |
| 7.00 | Repairing, Servicing and Overhauling of Actuators & AHU for motorised thermostats including servicing of logic controllers. | 2 | Set | 14,936 ₹29,872 | 14,900 ₹29,800 | 14,960 ₹29,920 |
| 8.00 | Supply, Installation, Testing and Commissioning of factory built Motor Pulley for AHU ,the pulley materails likes include cast iron ,steel,aluminium, plastic use a lathe or CNC machine to cut and shape the raw materials into the desired pulley shape .The pulley should have the correct number of grooves to match the belt and the correct diameter and width to provide the required belt contact and transmission .Balance the pulley to ensure that it spins smoothly and does not cause vibration or excessive wear on the motor or belt. | 1 | Set | 15,938 ₹15,938 | 15,900 ₹15,900 | 15,964 ₹15,964 |
Tender Value
Refer Docs
EMD Value
₹9,961
Closing Date
26 Feb 2026, 12:30 pmClosed
AE/BMCESD/PWD
Bankura
Annual maintenance of the EI work at PMSSY-III Building of Bankura Sammilani Medical College and Hospital, under BSMCH Electrical Section-III-----Emergency Repairing and Servicing of HVAC (High and low side) system.
2026_WBPWD_1011127_1
WBPWDTE/AE/BMCESD/NIQ-40/Q of 2025-2026
Open Tender
ELECTRICAL WORKS ORG
7 days
BMCESD/PWD/BANKURA
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,961
2 Mar 2026
19 Feb 2026
28 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
Repairing ,Servicing , Reinstallation ,Testing & Commissioning of HVAC dedicated VFDs suitable for the following fan motor capacities (The integration of the VFD with fan motor is included in this item) with IP 20 enclosures with Mains disconnect, complying with the tender specifications and having. Built-in dual 5% impedance DC link reactor on the positive and negative rails of the DC bus of the VFD. Provision for additional 2 PID controllers to control external devices such as chilled water modulating valve, fresh air damper, etc. thus reducing the number of I/Os in DDC Controllers & improving system reliability MODBUS RTU as the communication protocol between BMS & VFDs Automatic Energy Optimization for maximum energy savings. VFD is to be fixed in electrical VFD panel.
SITC of Pre-Filters for Air Handling unit of size : 610 mm x 610 mm x 50 mm
Repairing & Replacement of 1 x 185 TR Chiller Display (SL No- RTWD63D113BAT17091902)
Replacement of Thermostats for monitoring and controlling temperature
SITC of Water Temperature Sensor for 3 nos 185 TR Chiller Unit ( Including Software programming of Sensor) (Make -Trane/Bluestar)
Replacement of damaged Shaft and SS sleeve of condenser water pump.
Repairing, Servicing and Overhauling of Actuators & AHU for motorised thermostats including servicing of logic controllers.
Supply, Installation, Testing and Commissioning of factory built Motor Pulley for AHU ,the pulley materails likes include cast iron ,steel,aluminium, plastic use a lathe or CNC machine to cut and shape the raw materials into the desired pulley shape .The pulley should have the correct number of grooves to match the belt and the correct diameter and width to provide the required belt contact and transmission .Balance the pulley to ensure that it spins smoothly and does not cause vibration or excessive wear on the motor or belt.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
OID.pdf
Tender Documents • 0.38 MB
BOQ_2482762.xls
BOQ • 0.28 MB
2911.pdf
Additional Documents • 0.13 MB
Download all tender documents and submit your bid