| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.4 LAccepted-Finance | ₹21.4 L | L1 | Accepted-Finance Accept |
| 2 | L2₹21.6 LRejected-Finance | ₹21.6 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | D.MOHAN L2 | PKP BOREWELLS L1 |
|---|---|---|---|---|---|
| 1.001.Name of Work: Extension of pipeline from housing board to CRI pump entrance H/O Keeranatham Panchayat in SS kulam in Coimbatore District under Panchayat General Fund 2025-2026-Package No. TN 01-SSKM-02 | |||||
| 2.00 | Cost and Supply of Ductile iron socket / spigot Pipes for class K7 Asper standard specification complete and as directed by TWAD Board officers. WD-M0620 | 918.5 | M | 1,365 ₹12.5 L | 1,360 ₹12.5 L |
| 3.00 | Earth work excavation and depositing an bank with initial lead of 10m and lift of 2m as per SS20B.In all SDR (460* 2lines) | 483 | cum | 330 ₹1.6 L | 329 ₹1.6 L |
| 4.00 | Chamber | 21.89 | cum | 400 ₹8,756 | 390 ₹8,537.10 |
| 5.00 | Towards the labour charges for D.I pipes and specials in the trenches and laying to proper grade and alignment and as directed by the TVWD officers etc., WD-W0245 | 918.5 | cum | 22 ₹20,207 | 20 ₹18,370 |
| 6.00 | Towards the labour charges for D.I-S/S pipes and specials with rubber gaskets (tyton joint) including cost of lubricants .(including cost of jointing materials) etc., WD-W0308 | 167 | Nos | 85 ₹14,195 | 82 ₹13,694 |
| 7.00 | Provision for 100mm DI sluice valves asper standard specification etc., WD-M1199 | 4 | Nos | 14,200 ₹56,800 | 14,025 ₹56,100 |
| 8.00 | Provision for 80mm DI single air valves asper standard specification etc., WD-M1193 | 1 | Nos | 17,000 ₹17,000 | 16,840 ₹16,840 |
| 9.00 | Refilling the pipe trunch other than sand with excavated earth after completion of pipe laying including all labour charges etc., | 483 | cum | 46 ₹22,218 | 45.5 ₹21,976.50 |
| 10.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc | 2.74 | cum | 5,500 ₹15,070 | 5,485 ₹15,028.90 |
Tender Value
₹21.7 L
EMD Value
₹22,000
Closing Date
9 Feb 2026, 3:00 pmClosed
The Special Officer Keeranatham Panchayat
The Special Officer Keeranatham Panchayat
Extension of pipeline from housing board to CRI pump entrance H/O Keeranatham Panchayat
2026_RDTN_652199_1
20/2023--2
Open Tender
Civil Works - Water Works
180 days
Keeranatham
Extension of pipeline from housing board to
CRI pump entrance H/O Keeranatham Panchayat
4 documents required · 4 mandatory
₹0
₹22,000
Yes
16 Mar 2026
6 Feb 2026
9 Feb 2026
6 Feb 2026
9 Feb 2026
6 Feb 2026
Cost and Supply of Ductile iron socket / spigot Pipes for class K7 Asper standard specification complete and as directed by TWAD Board officers. WD-M0620
Earth work excavation and depositing an bank with initial lead of 10m and lift of 2m as per SS20B.In all SDR (460* 2lines)
Chamber
Towards the labour charges for D.I pipes and specials in the trenches and laying to proper grade and alignment and as directed by the TVWD officers etc., WD-W0245
Towards the labour charges for D.I-S/S pipes and specials with rubber gaskets (tyton joint) including cost of lubricants .(including cost of jointing materials) etc., WD-W0308
Provision for 100mm DI sluice valves asper standard specification etc., WD-M1199
Provision for 80mm DI single air valves asper standard specification etc., WD-M1193
Refilling the pipe trunch other than sand with excavated earth after completion of pipe laying including all labour charges etc.,
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Brick work CM 1:5 mix using Flyash bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all materials to site including all labour charges for spreading etc.complete,
Plastering with CM 1:4 mix using 20mm thick including all labour charges etc., complete.
Plastering with CM 1:5 mix using 12mm thick including all labour charges etc., complete.
Testing of DI pipes with hydraulic testing equipment by filling with water (including coast of water @Rs.60/KL) and testing to recommended pressure in convenient stetches and attending the bursts if any occurred during the test , excluding the cost of pipes, including other incidential and operational charges etc., complete
Provision for DI pipe , loading & unloading and conveyance charges
Provision for construction of thurst bearing valve , DI , GI & PVC Specials asper standard specification etc.,
Provision for Supply and erection of Scheme Name Board cum Citizen Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.98 MB
pricebid.pdf
Tender Documents • 0.91 MB
BOQ_782052.xls
BOQ • 0.25 MB
tech.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid