Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-Finance 4 9 2 ETTAYAPURAM ROAD NEAR A P C MAHALAKSHMI COLLEGE TUTICORIN 2 | ₹12.1 L | L1 | Accepted-Finance BOQ accepted |
| 2 | L2₹14.7 LAccepted-Finance OLD NO 4 263 NEW NO 5B 345 ANTHONIARPURAM SELSEENI COLONY TUTICORIN 628 008 | TUTICORIN | TAMIL NADU | 628008 | ₹14.7 L | L2 | Accepted-Finance BOQ accepted |
| Sl No | Description | Qty | Unit | MARIA LAKSHMI ENTERPRISES L2 | VEL ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling by cutting with cutting torch and removing the worn out MS Chequered plate from the structural frame. | 3,014 | Kg. | 45,210 ₹53,347.80 | 39,182 ₹46,234.76 |
| 2.00 | Charges for lifting and moving the iron and steel materials and T&P's gas cyclinders, welding machine, etc from ground floor to the take up pulley floor manually to a height of 35 mtr ( This working area in unapproachable and difficult to handling of materials). | 7,536 | Kg. | 1,88,400 ₹2.2 L | 1,50,720 ₹1.8 L |
| 3.00 | Charges for fabrication and Erection by fixing of new plates, positioning, aligning and welding with Structural frame and patch up work. | 7,536 | Kg. | 3,76,800 ₹4.4 L | 3,16,512 ₹3.7 L |
| 4.00 | Charges for lowering and moving the iron and steel materials and T&P's gas Cyclinders, welding machine, etc to the ground floor manually from the height of 35 mtr (This working area in unapproachable and difficult to handling of materials) | 3,014 | Kg. | 75,350 ₹88,913 | 60,280 ₹71,130.40 |
| 5.00 | Charges for complete cleaning and painting of newly fabricated and erected chequered plates in the take up floor of conveyor 27A with one coat of red oxide paint and two coats of enamel paints including consumables, painting brush, wire brush, cotton waste etc. (paint supplied by contractor scope as per painting area. | 96 | Sq.mtr. | 25,920 ₹30,585.60 | 21,696 ₹25,601.28 |
| 6.00 | Cost of Chequered plate (10mm Thick) | 7,536 | Kg. | 7,53,600 ₹8.9 L | 6,17,952 ₹7.3 L |
Tender Value
Refer Docs
EMD Value
₹9,500
Closing Date
17 Mar 2026, 2:00 pmClosed
Chief Engineer/TTPS
O/o CE/TTPS
ICHP- Replacing the worn out chequered plate with new chequered plate in Conveyor-27A take up pulley floor size 12m x 8m
2026_EB_669747_1
CE/TTPS/SE/MI/226/2025-2026
Open Tender
Miscellaneous Works
45 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,500
4 Apr 2026
3 Mar 2026
18 Mar 2026
3 Mar 2026
17 Mar 2026
3 Mar 2026
Charges for dismantling by cutting with cutting torch and removing the worn out MS Chequered plate from the structural frame.
Charges for lifting and moving the iron and steel materials and T&P's gas cyclinders, welding machine, etc from ground floor to the take up pulley floor manually to a height of 35 mtr ( This working area in unapproachable and difficult to handling of materials).
Charges for fabrication and Erection by fixing of new plates, positioning, aligning and welding with Structural frame and patch up work.
Charges for lowering and moving the iron and steel materials and T&P's gas Cyclinders, welding machine, etc to the ground floor manually from the height of 35 mtr (This working area in unapproachable and difficult to handling of materials)
Charges for complete cleaning and painting of newly fabricated and erected chequered plates in the take up floor of conveyor 27A with one coat of red oxide paint and two coats of enamel paints including consumables, painting brush, wire brush, cotton waste etc. (paint supplied by contractor scope as per painting area.
Cost of Chequered plate (10mm Thick)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_804861.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid