Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.9 Cr
EMD Value
₹7.3 L
Closing Date
28 Dec 2026, 11:00 am
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EE NH Division Kalaburagi
O/o EE NH Division Kalaburagi
Improvements to the road from Bheem bridge cross to Wadgera MDR from km 0.00 to 16.70 selected reaches in Wadgera taluk of Yadgir district Job.No CRIF-KNT-2026-27-295
2026_MoRTH_935386_1
EE/NHD/KLB/CRIF-295/26-27/1162
Open Tender
Civil Works - Roads
Item Rate
180 days
Wadgera Taluka
Please refer Tender documents.
4 documents required · 4 mandatory
₹8,850
EE NH Division Kalaburagi
₹7.3 L
Kalaburagi
23 Nov 2026
23 Nov 2026
29 Dec 2026
23 Nov 2026
28 Dec 2026
23 Nov 2026
22 Dec 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shurbs, saplings and trees of any girth, removal of stumps of trees cut earlier and disposal of unservicable materials and stacking of servicable materials to be used or auctioned, including removal and disposal of top organic soil in any thickness including all labour, usage charges of all machinery, loading, unloading, transportation etc., complete. By mechanical means in area of light jungle using dozir & As directed by the Engineer incharge of the work. | 2.84 | Hec | 32,646 | ₹92,845.22 |
| 2 | Surface Drains in Soil New:- Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment including loading & unloading, all labour, load, unload, usage charges of all machinery etc., complete By mechanical means in area of light jungle by mechanical means & As directed by the Engineer incharge of the work. | 7,110 | Mtr | 59 | ₹4,19,490 |
| 3 | Maintenance of Earth Shoulder (stripping excess soil),Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor, including all labour, usage charges of machinery, lead, lifts, loading, unloading disposal of earth etc., complete & As directed by the Engineer incharge of the work. | 4,740 | Sqm | 35.9 | ₹1,70,166 |
| 4 | Scarifying the existing bituminous surface to a required depth and disposal of scarified material within all lifts and leads, including all labour, load, unload, usage charges of all machinery, etc., complete. By Mechanical Means using Hydraulic excavator & As directed by the Engineer incharge of the work. | 5,250 | Sqm | 8.1 | ₹42,525 |
| 5 | Compacting original ground supporting subgrade: Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a required depth, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for subgrade construction including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete & As directed by the Engineer incharge of the work. | 300 | Cum | 93 | ₹27,900 |
| 6 | Construction of granular sub-base by providing spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401, including protection of edges of GSB layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete. (Compacted thickness). By Mix in Place Method Grading-V Close Graded & As directed by the Engineer incharge of the work. | 300 | Cum | 2,256.44 | ₹6,76,932 |
| 7 | Wet Mix Macadam (Plant Mix Method): Providing, laying, spreading and compacting graded stone aggregate as per table 400-12 & 400-13, to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub- base /base course on well prepared surface and compacting with vibratory roller to achieve the desired densityof 98% including protection of edges of WMM layer, cost of all materials, labour, usage charges of all machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading all lead, lifts etc., complete, (Compacted thickness) Laying Using Grader & As directed by the Engineer incharge of the work & As directed by the Engineer incharge of the work. | 1,018.75 | Cum | 2,451.48 | ₹24,97,445.25 |
| 8 | Prime Coat over WMM: Providing and applying primer coat with SS1 bitumen emulsion complying IS- 8887 on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.as per table-500-3, including cost of all materials, labour, usage charges of all machinery, lead, lift, loading & unloading etc., complete, Including lead for emulsion using SS-I Bitumen emulsion & As directed by the Engineer incharge of the work. | 5,625 | Sqm | 102 | ₹5,73,750 |
| 9 | Tack Coat:- Providing and applying tack coat with VG-10 Grade Bitumen using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared Granular Surface cleaned with mechanical broom and dusting by air compressor and spraying including cost of all materials, labour, usage charges of machinery, lead, lifts, loading and unloading etc.,complete, including lead for bitumen. Using VG-10 Grade Bitumen (80/100), On Granular surface at 0.25kg/sqm & As directed by the Engineer incharge of the work. | 5,625 | Sqm | 24.02 | ₹1,35,112.5 |
| 10 | Tack Coat:- Providing and applying tack coat with VG-10 Grade Bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom and dusting by air compressor and spraying including cost of all materials, labour, usage charges of all machinery, loading, unloading, etc.,complete, including lead for bitumen. Using VG-10 Grade Bitumen (80/100), On Bituminous surface at 0.20kg/sqm & As directed by the Engineer incharge of the work. | 39,250 | Sqm | 19.4 | ₹7,61,450 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
KW4-295.pdf
Tender Documents • 1.21 MB
Generalconditions295.pdf
Additional Documents • 0.19 MB
BOQ_982929.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .