| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC 7 13 ANAICUT ROAD WALAJAPET 632513 RANIPET DISTRICT TAMILNADU | RANIPET | TAMIL NADU | 632513 | ₹3.9 Cr Quoted ₹4.0 Cr | L1 | Accepted-AOC Final negotiated rate is acceptable |
| 2 | L2₹4.8 CrRejected-Finance C3 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹4.8 Cr | L2 | Rejected-Finance Quoted second Lowest rate |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-BQR condition 2&3 not satisfied.the firm has uploaded contract agreement (not in complete shape) instead of purchase order/Work order copy |
| Sl No | Description | Qty | Unit | Kumara Engineering Works | ANBU ENGINEERING INDIA PRIVATE LIMITED |
|---|---|---|---|---|---|
| 1.00 | Design, Engineering and Supply of bag filters in place of existing dry cyclone separator in dust extraction system of DE1 for Junction Tower 1 (JT-1) & 1st set of 3 bunkers in Unit-I (Capacity - 35000m³/hr) with all necessary modification required in the existing system | 1 | Set | 55,54,000 ₹65,53,720 | 67,76,000 ₹79,95,680 |
| 2.00 | Design, Engineering and Supply of bag filters in place of existing dry cyclone separator in dust extraction system of DE10 at Junction Tower 4 (JT-4) area (Capacity - 5200m³/hr) with all necessary modification required in the existing system | 1 | Set | 39,34,000 ₹46,42,120 | 47,99,500 ₹56,63,410 |
| 3.00 | Design, Engineering and Supply of bag filters in place of existing dry cyclone separator in dust extraction system of DE13 & 14 at Secondary Crusher House (Capacity - 49800m³/hr) with all necessary modification required in the existing system | 2 | Set | 1,56,80,000 ₹1,85,02,400 | 1,91,30,000 ₹2,25,73,400 |
| 4.00 | Dismantling, Erection & commissioning of bag filters in place of existing dry cyclone separator in dust extraction system of DE1 for Junction Tower 1 (JT-1) & 1st set of 3 bunkers in Unit-I (Capacity - 35000m³/hr) with all necessary modification required in the existing system | 1 | Set | 19,33,300 ₹22,81,294 | 23,59,000 ₹27,83,620 |
| 5.00 | Dismantling, Erection & commissioning of bag filters in place of existing dry cyclone separator in dust extraction system of DE10 at Junction Tower 4 (JT-4) area (Capacity - 5200m³/hr) with all necessary modification required in the existing system | 1 | Set | 13,99,330 ₹16,51,209.4 | 17,07,500 ₹20,14,850 |
| 6.00 | Dismantling, Erection & commissioning of bag filters in place of existing dry cyclone separator in dust extraction system of DE13 & 14 at Secondary Crusher House (Capacity - 49800m³/hr) with all necessary modification required in the existing system | 2 | Set | 50,60,000 ₹59,70,800 | 61,74,000 ₹72,85,320 |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
20 Aug 2025, 2:00 pmClosed
CE / MTPS-I
CE / MTPS-I
Design Engineering Supply erection and commissioning of bag filters in place of existing dry cyclone separator in dust extraction system DE1 DE10 DE13 and DE14 with all necessary modifications required at Coal Handling Plant II 04 Set
2025_EB_587774_1
CE MTPSI SE PA EE SI AEE2 OTNo 62 25 26
Open Tender
Miscellaneous Goods
150 days
Mettur Thermal Power Station-I
As Enclosed
4 documents required · 4 mandatory
₹0
₹2.8 L
Yes
office of SE PA MTPSI
12 Jan 2026
1 Aug 2025
21 Aug 2025
1 Aug 2025
20 Aug 2025
1 Aug 2025
7 Aug 2025
Design, Engineering and Supply of bag filters in place of existing dry cyclone separator in dust extraction system of DE1 for Junction Tower 1 (JT-1) & 1st set of 3 bunkers in Unit-I (Capacity - 35000m³/hr) with all necessary modification required in the existing system
Design, Engineering and Supply of bag filters in place of existing dry cyclone separator in dust extraction system of DE10 at Junction Tower 4 (JT-4) area (Capacity - 5200m³/hr) with all necessary modification required in the existing system
Design, Engineering and Supply of bag filters in place of existing dry cyclone separator in dust extraction system of DE13 & 14 at Secondary Crusher House (Capacity - 49800m³/hr) with all necessary modification required in the existing system
Dismantling, Erection & commissioning of bag filters in place of existing dry cyclone separator in dust extraction system of DE1 for Junction Tower 1 (JT-1) & 1st set of 3 bunkers in Unit-I (Capacity - 35000m³/hr) with all necessary modification required in the existing system
Dismantling, Erection & commissioning of bag filters in place of existing dry cyclone separator in dust extraction system of DE10 at Junction Tower 4 (JT-4) area (Capacity - 5200m³/hr) with all necessary modification required in the existing system
Dismantling, Erection & commissioning of bag filters in place of existing dry cyclone separator in dust extraction system of DE13 & 14 at Secondary Crusher House (Capacity - 49800m³/hr) with all necessary modification required in the existing system
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid