| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹45.3 LAccepted-Finance | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹47.8 L+₹2.5 L (5.50%)Rejected-Finance GRAM KANETHU BUJURG PO BARGADWA BASTI UTTAR PRADESH 272194 | BASTI | UTTAR PRADESH | 272194 | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹49.2 L+₹3.9 L (8.51%)Rejected-Finance 01 SORANA NAKUR SAHARANPUR UTTAR PRADESH 247232 | SAHARANPUR | UTTAR PRADESH | 247232 | L-3 | Rejected-Finance L-3 | |
| 4 | L-4₹50.4 L+₹5.1 L (11.2%)Rejected-Finance | L-4 | Rejected-Finance L-4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Technical Bid not Qualified |
| Sl No | Description | Qty | Unit | Pratap Narayan Mishra L2 | M/S SINGH CONSTRUCTION COMPANY L3 | M/S DEEPENDRA PAL THEKEDAR L4 | ARJUN SINGH CONTRATOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in- charge | 361.68 | Sqm | 36 ₹13,020.48 | 37.1 ₹13,418.33 | 38 ₹13,743.84 | 34 ₹12,297.12 Lowest |
| 2.00 | E/W in Excavation for boring Pit, recharge pit in ordinary soil lift up to 1.5 m and Lead up to 50 m. | 826.43 | Cum | 112.5 ₹92,973.38 | 115.4 ₹95,370.02 | 118.75 ₹98,138.56 | 107 ₹88,428.01 Lowest |
| 3.00 | P.C.C. work in 1:3:6 (cement:coarse sand: 20 mm to 40 mm Stone Agg.) including all cost of Material, labour,T&P etc. complete. | 52.79 | Cum | 4,367.75 ₹2,30,573.52 | 4,493.7 ₹2,37,222.42 | 4,602.75 ₹2,42,979.17 | 4,119 ₹2,17,442.01 Lowest |
| 4.00 | Class M-150 Brick work in 1:4 (cement:coarse sand) cement mortar including all cost of Material, labour,T&P etc. complete. | 59.76 | Cum | 5,424 ₹3,24,138.24 Lowest | 5,580.7 ₹3,33,502.63 | 5,716.15 ₹3,41,597.12 | 5,500 ₹3,28,680 |
| 5.00 | 12 mm thick cement plaster work in 1:3 (cement: coarse sand) cement mortar and finished coat 3 mm thick neat cement including all cost of Material, labour, T&P etc. complete. | 382.24 | Sqm | 205.5 ₹78,550.32 Lowest | 211.47 ₹80,832.29 | 223 ₹85,239.52 | 220 ₹84,092.8 |
| 6.00 | Cetering and Shuttering for R.C.C. work including all cost of materials, labour etc. complete. | 87.96 | Sqm | 667 ₹58,669.32 | 686.35 ₹60,371.35 | 703 ₹61,835.88 | 600 ₹52,776 Lowest |
| 7.00 | R.C.C. work M-20 in 1:1.5:3 (cement:coarse sand: stone gritt) including all cost of Material, labour,T&P etc. complete. | 69.61 | Cum | 7,651 ₹5,32,586.11 | 7,871.6 ₹5,47,942.08 | 8,062.65 ₹5,61,241.07 | 7,300 ₹5,08,153 Lowest |
| 8.00 | Reinforcement Steel work including Cutting, bending, binding with steel wire and all cost of Material, labour,T&P etc. complete. | 1,094.84 | Kg | 75.7 ₹82,879.39 Lowest | 77.9 ₹85,288.04 | 79.8 ₹87,368.23 | 80 ₹87,587.2 |
| 9.00 | Supplying and Laying 40 mm size Brick Ballast for filter including all cost of Material, labour, T&P etc. complete. | 32.6 | Cum | 2,059 ₹67,123.4 Lowest | 2,118.4 ₹69,059.84 | 2,169.8 ₹70,735.48 | 2,100 ₹68,460 |
| 10.00 | Supplying and Laying M-150 Half Brick Soling including all cost of Material, labour,T&P etc. complete. | 22.5 | Sqm | 321.8 ₹7,240.5 Lowest | 331 ₹7,447.5 | 339.15 ₹7,630.88 | 350 ₹7,875 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
14 Sept 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-1, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Rain Water Harvesting Work in Irrigation Colony Govindpur, Prayagraj
2026_UPIDC_1183502_1
03/SE/2026-27
Open Tender
Civil Works
Item Rate
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.1 L
30 Sept 2026
8 Sept 2026
14 Sept 2026
8 Sept 2026
14 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in- charge | 361.68 | Sqm | - | - |
| 2 | E/W in Excavation for boring Pit, recharge pit in ordinary soil lift up to 1.5 m and Lead up to 50 m. | 826.43 | Cum | - | - |
| 3 | P.C.C. work in 1:3:6 (cement:coarse sand: 20 mm to 40 mm Stone Agg.) including all cost of Material, labour,T&P etc. complete. | 52.79 | Cum | - | - |
| 4 | Class M-150 Brick work in 1:4 (cement:coarse sand) cement mortar including all cost of Material, labour,T&P etc. complete. | 59.76 | Cum | - | - |
| 5 | 12 mm thick cement plaster work in 1:3 (cement: coarse sand) cement mortar and finished coat 3 mm thick neat cement including all cost of Material, labour, T&P etc. complete. | 382.24 | Sqm | - | - |
| 6 | Cetering and Shuttering for R.C.C. work including all cost of materials, labour etc. complete. | 87.96 | Sqm | - | - |
| 7 | R.C.C. work M-20 in 1:1.5:3 (cement:coarse sand: stone gritt) including all cost of Material, labour,T&P etc. complete. | 69.61 | Cum | - | - |
| 8 | Reinforcement Steel work including Cutting, bending, binding with steel wire and all cost of Material, labour,T&P etc. complete. | 1,094.84 | Kg | - | - |
| 9 | Supplying and Laying 40 mm size Brick Ballast for filter including all cost of Material, labour, T&P etc. complete. | 32.6 | Cum | - | - |
| 10 | Supplying and Laying M-150 Half Brick Soling including all cost of Material, labour,T&P etc. complete. | 22.5 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tender_Document_03-SE_2026_27_Lot_1.pdf
Tender Documents • 2.95 MB
BOQ_2225884.xls
BOQ • 5.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .