Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.1 L+₹38,471.41 (10.4%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.3 L+₹58,411.81 (15.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.3 L+₹61,282.81 (16.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.3 L+₹63,005.41 (17.1%)Admitted-Finance N A | FARIDABAD | HARYANA | 121004 | L5 | Admitted-Finance |
Tender Value
₹5.2 L
EMD Value
₹10,440
Closing Date
7 Sept 2026, 4:00 pmClosed
Executive Engineer PWD RnB Division Chatroo
Executive Engineer PWD RnB Division Chatroo
Plz refer BOQ
2026_PWDJK_322865_5
e-NIT No. 50 of 2026-27 Dated 31/08/2026
Open Tender
Civil Works
Percentage
30 days
Chatroo
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Convener, purchase committee, Directorate of ISM
₹10,440
9 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 74.6 | cum | 479.3 | ₹35,755.78 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 3.72 | cum | 4,826.5 | ₹17,954.58 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 41.7 | cum | 4,586.88 | ₹1,91,272.9 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 36 | sqm | 628.95 | ₹22,642.2 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 24 | sqm | 286.35 | ₹6,872.4 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 9.59 | cum | 7,571.55 | ₹72,611.16 |
| 7 | Dumping of stones including cost of stones in horizontal level stone filling | 11 | cum | 1,174.55 | ₹12,920.05 |
| 8 | Extra for brick work with common burnt clay bricks /cement concrete bricks in superstructure above plinth level upto floor five level | 9.59 | cum | 1,455.65 | ₹13,959.68 |
| 9 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 9.4 | sqm | 416.5 | ₹3,915.1 |
| 10 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) | 71.76 | sqm | 306.85 | ₹22,019.56 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1084858.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .