Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | ₹24.4 L | L1 | Accepted-AOC ok |
| 2 | L2₹24.7 LRejected-Finance | ₹24.7 L | L2 | Rejected-Finance L2 |
Tender Value
₹24.9 L
EMD Value
₹49,800
Closing Date
6 May 2026, 12:00 pmClosed
Executive Engineer
EE red saharanpur vikas bhawan delhi road saharanpur
NAGAR KSHETRA SAHARANPUR KE WARD 55 LAKSHMAN SINGH COLONY ME MAIN ROAD SE EK SAMBANDHIT GALI SAHIT B.H.S.INTER COLLEGE TAK VAI ANIL KE MAKAAN SE DO SAMBANDHIT GALI SAHIT RAVINDRA KE MAKAAN TAK C.C.ROAD VAI NALI NIRMAAN KARYA
2026_REDUP_1143735_8
18/RED/cashier/26-27 dt 04-04-2026
Open Tender
Civil Works
90 days
EE red saharanpur
NAGAR KSHETRA SAHARANPUR KE WARD 55 LAKSHMAN SINGH COLONY ME MAIN ROAD SE EK SAMBANDHIT GALI SAHIT B.H.S.INTER COLLEGE TAK VAI ANIL KE MAKAAN SE DO SAMBANDHIT GALI SAHIT RAVINDRA KE MAKAAN TAK C.C.ROAD VAI NALI NIRMAAN KARYA
3 documents required · 3 mandatory
₹854
₹49,800
EE red saharanpur vikas bhawan delhi road saharanp
24 Jun 2026
30 Apr 2026
6 May 2026
30 Apr 2026
6 May 2026
30 Apr 2026
2 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Providing concrete for plain/reinforced concrete (P.C.C grade M 10, Nonimal Mix 1:3:6) in open foundations complete as per drawings
As Per MORD Sr. No.- 11.4 I (i) Analysis | 27.03 | Cum | 5,243.05 | ₹1,41,719.64 | BI01010001010000000000000515BI0100001113 |
| 2 | Brick masonry work in cement mortar 1:4 (Cement : Coarse Sand) in substructure complete excepting pointing and plastering, as per drawing As Per MORD Sr. No.- 12.1 II Analysis | 42.23 | Cum | 5,559.4 | ₹2,34,773.46 | BI01010001010000000000000515BI0100001114 |
| 3 | Plastering with cement mortar1:4 (Cement : Coarse Sand), 12 mm thick on brick work in substructure
As Per MORD Sr. No.- 12.3 Analysis | 163.2 | Sqm | 167.2 | ₹27,287.04 | BI01010001010000000000000515BI0100001115 |
| 4 | Providing concrete for plain/reinforced concrete P.C.C. grade M-20 Nominal mix (1:2:4) in open foundations complete as per drawings
As Per MORD Sr. No.- 11.4 III (i) Analysis | 11.6 | Cum | 5,521.4 | ₹64,048.24 | BI01010001010000000000000515BI0100001116 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
As Per MORD Sr. No.- 4.1 A (i) Analysis | 10.2 | Cum | 1,775.55 | ₹18,110.61 | BI01010001010000000000000515BI0100001117 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
As Per MORD Sr. No.- 4.7 Analysis | 95.63 | Cum | 2,299 | ₹2,19,853.37 | BI01010001010000000000000515BI0100001118 |
| 7 | Cement Concrete (Thickness as Design) in proportion 1:1.5:3 with 43 grade cement or any other type as per Clause 1501.2.2 , coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved, curing of concrete slabs for 14-days,
As Per MORD Analysis 6.4 | 191.25 | Cum | 6,303.25 | ₹12,05,496.56 | BI01010001010000000000000515BI0100001119 |
| 8 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 R.C.C. grade M 25
As Per MORD Sr. No.- 12.5 IV Analysis | 44.25 | Cum | 6,333.65 | ₹2,80,264.01 | BI01010001010000000000000515BI0100001120 |
| 9 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
As Per MORD Sr. No.- 12.7 Analysis | 43.42 | Qtl | 6,476.15 | ₹2,81,194.43 | BI01010001010000000000000515BI0100001121 |
| 10 | Supply and fixing of a sign board including necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the work
As Per S.E. (R.E.D.), Saharanpur Sanction | 1 | No. | 4,085 | ₹4,085 | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_2136624.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid