Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.5 LAccepted-AOC HOUSE NO 40 GALI NO 2 SHREE KRISHNA COLONY GARHI HARSARU 122505 | GARHI HARSARU | GURUGRAM | HARYANA | 122505 | ₹8.5 L | 1 | Accepted-AOC Work Allotted |
| 2 | 2₹10.4 L+₹2.0 L (23.2%)Rejected-Finance SECOND FLOOR 134B PART 3 SECTOR 5 GURURAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹10.4 L+₹2.0 L (23.2%) | 2 | Rejected-Finance 2 |
| 3 | 3₹11.3 L+₹2.8 L (33.0%)Rejected-Finance H NO 559 WARD NO 1 CHAMPA PURI GALI NO 5 CHARKHI DADRI 127306 | CHARKHI DADRI | CHARKHI DADRI | HARYANA | 127306 | ₹11.3 L+₹2.8 L (33.0%) | 3 | Rejected-Finance 3 |
| 4 | 4₹11.8 L+₹3.3 L (38.8%)Rejected-Finance | ₹11.8 L+₹3.3 L (38.8%) | 4 | Rejected-Finance 4 |
| 5 | 5₹12.6 L+₹4.2 L (49.3%)Rejected-Finance 159A VILLAGE BAJGHERA MAJOR VINOD RANA MARG GURUGRAM HARYANA 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | ₹12.6 L+₹4.2 L (49.3%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | ROHIT MEHLA L3 | Maxworth Infratech L2 | The Shree Kalka Co. Op. L and C Society L1 | Battle Hawk Private Limited L4 | LOHANS GROUP L5 | THE SARASWATI WOMENS COOPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning of Rain Water Harvesting bore pit and pre-pit including de-silting, removal of sludge, muck and other unwanted material and its proper disposal. Cleaning of all filtration Media, Cleaning and development of existing bore up to 10 inch dia pipe by Bokkey method, including development with air compressor , complete in all respects as per site requirement and directions of Engineer-in-Charge. | 85 | Per | 13,250 ₹11,26,250 | 12,270 ₹10,42,950 | 9,962.7 ₹8,46,829.5 Lowest | 13,824 ₹11,75,040 | 14,874 ₹12,64,290 | 15,945 ₹13,55,325 |
Tender Value
₹14.9 L
EMD Value
₹30,000
Closing Date
6 Apr 2026, 12:00 pmClosed
Tushar Yadav
Municipal Corporation Gurugram
Cleaning of Rain Water Harvesting Structures under Ward 11,14,15 and 18 under Zone 1 Municipal Corporation Gurugram. Recall
2026_HRY_511510_1
2026EAB99679 90F5 42A6 A1D3 D981C73E8D81285ULB
Open Tender
Civil Works
Works
100 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹30,000
Yes
22 Apr 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cleaning of Rain Water Harvesting bore pit and pre-pit including de-silting, removal of sludge, muck and other unwanted material and its proper disposal. Cleaning of all filtration Media, Cleaning and development of existing bore up to 10 inch dia pipe by Bokkey method, including development with air compressor , complete in all respects as per site requirement and directions of Engineer-in-Charge. | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_590309.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .