Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.5 L+₹1.1 L (9.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹15.3 L+₹3.0 L (24.2%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹18.1 L+₹5.8 L (46.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹18.7 L+₹6.4 L (51.5%)Admitted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | L5 | Admitted-Finance |
Tender Value
₹19.7 L
EMD Value
₹39,460
Closing Date
18 Aug 2026, 3:00 pmClosed
eo
NAGAR PALIKA RAJGARGH
Drain repair work for Wards No. 1 to 40
2026_DLB_588182_1
1251 2
Open Tender
Civil Works
Percentage
RAJGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
executive officer
₹39,460
Yes
29 Sept 2026
14 Aug 2026
19 Aug 2026
14 Aug 2026
18 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks | 24 | Cum | 678 | ₹16,272 |
| 2 | Carriage of Materials by mechanical transport including loading, unloading and stacking ::Rate for lead 3 Km | 24 | Cum | 209.35 | ₹5,024.4 |
| 3 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.Depth upto 1.5 m | 80 | cum | 229.5 | ₹18,360 |
| 4 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid manually, compacting with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 20 | Cum | 3,030 | ₹60,600 |
| 5 | Brick work with FPS bricks of class designation 75 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand) | 120 | Cum | 5,400 | ₹6,48,000 |
| 6 | Random rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering.In cement mortar 1:4 (1 cement : 4 coarse sand) | 110 | Cum | 5,270 | ₹5,79,700 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 40 | cum | 5,910 | ₹2,36,400 |
| 8 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement : 6 fine/ coarse sand) | 1,000 | Sqm | 213.5 | ₹2,13,500 |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | 1,000 | Kg | 114.5 | ₹1,14,500 |
| 10 | Providing and fixing stone slab covering of required size over drains including filling of joints with cement sand mortar 1:3 complete as per direction of Engineer-in-charge. | 90 | Sqm | 906 | ₹81,540 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
nit12.pdf
Tender Documents • 0.68 MB
BOQ_1044500.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .