| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC COIMBATORE | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹4.1 L+₹6,190 (1.54%)Rejected-AOC PASUMALAITHANGAL GINGEE VILUPPURAM | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | R SELVARAJ L2 | S RAJATHI L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged Plain cement concrete wall drain including all labours etc., complete | 4 | m3 | 500 ₹2,000 | 485 ₹1,940 Lowest |
| 2.00 | Dismantling the existing damaged RCC Slab in Culvert including all labours etc., complete | 5 | m3 | 4,310 ₹21,550 | 4,300 ₹21,500 Lowest |
| 3.00 | Earth work excavation for foundation in all kinds of soils and sub soils to full depth as directed by the departmental officers except hard rock inclusive of shoring strutting and balling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated and depositing the surplus earth with in the compound in places shown by the departmental officers with initial lead of 10 meters and initial lift of 2 meters including cost of all labour charges etc., complete as per standard specification 23 & 24 VI (S2) VII.9,10 | 65 | m3 | 150 ₹9,750 | 123 ₹7,995 Lowest |
| 4.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 10 | m3 | 5,310 ₹53,100 | 5,300 ₹53,000 Lowest |
| 5.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS
sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size
0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including
cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet) | 162 | m2 | 275 ₹44,550 | 270 ₹43,740 Lowest |
| 6.00 | Plain Cement Concrete 1:3:6 (one cement, three four aggregates and six coarse aggregates) using 20mm aggregates and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 27.6 | m3 | 6,100 ₹1,68,360 | 6,000 ₹1,65,600 Lowest |
| 7.00 | Reinforced Cement concrete in 1:1.5:3 (one cement, one and half sand and three metal) using 20mm hard broken metal to the standard specifications etc complete | 5.5 | m3 | 9,010 ₹49,555 | 9,000 ₹49,500 Lowest |
| 8.00 | Supply and fabrication of RTS rods of various diameters including bending, cutting, placing in position including the cost of binding wire, labour charges etc., complete as directed | 5.5 | Q | 9,050 ₹49,775 | 9,000 ₹49,500 Lowest |
| 9.00 | Conveying the excavated earth, silt, brickwork, RR, mansory etc from the site to 15km distance including loading and unloading etc complete | 65 | m3 | 165 ₹10,725 | 160 ₹10,400 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
21 May 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Reconstruction of Storm Water Drain at Ward areas in Ward no 17 of West Zone
2025_MAWS_557786_3
E1/Westzone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
27 Feb 2026
14 May 2025
22 May 2025
15 May 2025
21 May 2025
15 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .