| 1 | L1₹72.9 LAccepted-AOC | L1 | Accepted-AOC Due to lower Rates | |
| 2 | L2₹81.4 L+₹8.5 L (11.7%)Rejected-Finance NEAR VILL TEPLA NANHERI TEHSIL GHANAUR DISTRICT PATIALA | L2 | Rejected-Finance Higher Rates | |
| 3 | Rejected-Technical | - | Rejected-Technical Technically not found eligible |
| Sl No | Description | Qty | Unit | OM PARKASH CONTRACTOR L2 | AM INFRATECH L1 |
|---|---|---|---|---|---|
| 1.00 | Ordinary jungle clearance of both banks of running Disty. Minors and Drains includind boundary road with discharge upto 1.5 cumecs. | 1 | km | 92 ₹2,16,957.16 | 80 ₹1,88,658.4 Lowest |
| 2.00 | Excavation of soil (any type) using hydraulic excavator and CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 30 mtr. | 1 | cum | 220 ₹8,800 | 185 ₹7,400 Lowest |
| 3.00 | Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations with all lifts and leads (excluding royality.) | 1 | cum | 6,700 ₹45,14,326 | 6,250 ₹42,11,125 Lowest |
| 4.00 | Compaction of earth Extra for laying earth/fly ash as per specificaion in 20cm layers and dressing and including cost of rolling Extra for watering the earth / fly ash laid in 20 cm layers as per specificaion for compation Extra for Rolling to Specificaions | 1 | cum | 700 ₹9,43,292 | 650 ₹8,75,914 Lowest |
| 5.00 | Dressing of Earthwork (New work or remodeling work.) | 1 | sqm | 375 ₹5,05,335 | 240 ₹3,23,414.4 Lowest |
| 6.00 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth | 1 | cum | 4,600 ₹12,78,202 | 3,900 ₹10,83,693 Lowest |
| 7.00 | Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters. | 1 | cum | 190 ₹34,638.9 | 150 ₹27,346.5 Lowest |
| 8.00 | Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification. | 1 | sqm | 5,650 ₹19,492.5 | 5,000 ₹17,250 Lowest |
| 9.00 | Dag Belling single kassi stroke complete in all respect | 1 | km | 220 ₹9,941.8 | 190 ₹8,586.1 Lowest |
| 10.00 | Putting 1:3 (cement: water) cement slurry with cement @ 2.25 kg/ sqm on prepared bed and side slopes before laying concrete on bed and side slopes | 1 | sqm | 7,110 ₹4,97,842.2 | 6,500 ₹4,55,130 Lowest |
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
12 Jan 2026, 6:55 pmClosed
Executive Engineer Devigarh Patiala Division
Executive Engineer/Devigarh Patiala Canal and Ground Water Division WRD Punjab Patiala Phone No 0175 2353311
Estimate for laying under ground R.C.C Pipeline in Reach RD 48400-50610 of Attalan Minor
2026_WR_157180_1
39/2025-26
Open Tender
Civil Works
Item Rate
60 days
Patiala
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
₹1.2 L
Yes
17 Mar 2026
3 Jan 2026
13 Jan 2026
3 Jan 2026
12 Jan 2026
3 Jan 2026
Ordinary jungle clearance of both banks of running Disty. Minors and Drains includind boundary road with discharge upto 1.5 cumecs.
Excavation of soil (any type) using hydraulic excavator and CK 90 excavation with hydraulic excavator of 0.9 cum capacity including cutting trimming bottom and side slopes in accordance with requirement of grades and cross sections, includingall lift and combined lead upto 30 mtr.
Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations with all lifts and leads (excluding royality.)
Compaction of earth Extra for laying earth/fly ash as per specificaion in 20cm layers and dressing and including cost of rolling Extra for watering the earth / fly ash laid in 20 cm layers as per specificaion for compation Extra for Rolling to Specificaions
Dressing of Earthwork (New work or remodeling work.)
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing 0 to 1.5 mtr depth
Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
Dag Belling single kassi stroke complete in all respect
Putting 1:3 (cement: water) cement slurry with cement @ 2.25 kg/ sqm on prepared bed and side slopes before laying concrete on bed and side slopes
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Side Slopes)
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Coping)
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M- 15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII) (For Sleepers)
Shuttering for faces of Concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications.
Filling Construction/Contraction Joint with sealing compound complete in all respect
Filling expansion joints with special impervious hot pour 12.5 mm wide
Extra bitumen painting at 0.69 per sqm (on sleeper) .
Providing & laying LDPE Film 150 micron over sleepers
Dismantling brick work, tile masonry or tile lining (in cement mortar)
Dismantling of Brick work in cement sand mortar/lime mortar including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)
Dismantling of PCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with all lifts & lead of 100 mtr (By Mechanical Means)
Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, construction of shoring and bracing, removal of stumps and other matter, dressing of sides and bottom and backfilling with excavated surplus soil Depth 0-3 mtr(Mechanical means)
PCC M15 Grade as levelling course below approach slab complete as per drawing and Technical specification.
Plain cement concrete M-15 Grade in sub-structure complete as per drawing and Technical Specifications Height upto 5m.
Plain/Reinforced cement concrete grade M30 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.
Plain/Reinforced cement concrete grade M25 in sub-structure with batching Plant, Transit Mixer and Concrete Pump complete as per drawing and technical specifications with Height up to 5m.
Plain/Reinforced cement concrete RCC Grade M20 With Batching Plant, Transit Mixer and Concrete Pump in sub-structure complete as per drawing and Technical Specifications Height upto 5m
Provision of an Reinforced cement concrete crash barrier at the edges of the Bridge,road, approaches to bridge structures and medians, constructed with M-40 grade concrete , with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified-with concrete mixture.
Supplying, fitting and placing HYSD bar reinforcement in sub- structure complete as per drawing and Technical Specifications.
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Supplying & laying dry brick ballast
Earth work involved in dismantling Open flume, A.P.M. or O.S.M. type Outlets (including excavation, refilling, consolidation and dressing )
Adjusting new APM Block in correct "y" & fixing in position (in case of new outlet where no dismentling and reconstructing of gollet wall is involved
Laying cement concrete 1:4:8 with gauge 40mm mixing by mechanical means using concrete mixer volumetric type
First class burnt brick work laid in cement sand mortar 1:4 in foundations & plinth
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.
Cold twisted detormed (Ribbed/ ToR Steel Bar) Bars (Fe 500 grade as per IS 1786-2005) , for R.C.C works, where not including in the complete rate of RCC including bending and biding placing in position complete
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc.
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.25 ft= 7.6 cm (min wt 68 kg))
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.32 ft= 9.9 cm (min wt 72 kg))
Providing APM cast iron block complete in all respects including supply of pig iron, casting and pattern making, as per ISI specifications no. 7986-1976 (0.40 ft= 12.2 cm (min wt 76 kg))
Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation, including the cost of diversion for traffic, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect.
Providing, lowering precast concrete NP-2 plain end pipes with collar and reinforcement, in trenches to correct gradient and alignment. cutting of reinforcement cement concrete, plain end pipe stringing in trenches, jointing ends and fixing collars with cement mortar 1:2 as per IS 456:2003 into trenches for all depths and laying out same to correct alignment, gradients, levels, etc., complete in all respect (800mm dia pipes)
Providing, lowering precast concrete NP-2 plain end pipes with collar and reinforcement, in trenches to correct gradient and alignment. cutting of reinforcement cement concrete, plain end pipe stringing in trenches, jointing ends and fixing collars with cement mortar 1:2 as per IS 456:2003 into trenches for all depths and laying out same to correct alignment, gradients, levels, etc., complete in all respect (700mm dia pipes)
Cement concrete 1:2:4 with stone ballast or shingle mixing by manual means
First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth
10 mm thick Cement Plaster 1:4 on Side Walls and floor
RCC slab 1:2:4 with 60 kg steel per cum
Providing & fixing of Jungla & Man hole complete
Providing & placing of Steel foot steps complete
Jointing & Cutting of RCC Plain End NP-2 pipes 150 mm dia into trenches & laying same in correct alignment
Shutter Arrangement Ø500mm
Providing and Fixing Alfa Valve dia 500 mm
Dismantling of flexible pavements thickness above 50mm by mechanical means and disposal of dismantled materials up to a lead of 1000 meters, stacking serviceable and unserviceable materials separately as per technical clause 202 of MORT&H specifications
10mm thick cement plaster 1:4 on floors
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
BOQ_318585.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .