Loading…
Loading…
Tender Value
₹26.3 L
EMD Value
₹26,300
Closing Date
2 Jul 2026, 5:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Superintending Engineer
O/o the SE, Jajpur Irrigation Division, Jajpur
Canal improvement
2026_CDJID_132142_26
e-Procurement Notice No.01/ 2026-27
Open Tender
Civil Works - Canal
180 days
Jajpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹26,300
Yes
18 Jun 2026
18 Jun 2026
3 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
18 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and removing RCC columns, beams, slab, staircase landing, lintels including stacking the useful materials for reuse and removing the debris within 50m lead including cost of labour with T&P required for the work etc. complete as per direction of Engineer-in-Charge. | 19.03 | One Cum | 1,644.7 | ₹31,298.64 |
| 2 | Earth work in excavation of foundation in ordinary soil with initial lead of 50m and initial lift of 1.50m including dressing and leveling the bed & sides and depositing the excavated earth away from the work site including labour cess etc. complete as per the direction of the Engineer-in-charge. | 172.56 | One Cum | 210.5 | ₹36,323.88 |
| 3 | Filling foundation and plinth with sand with well watered and rammed including cost, carriage, royalty of sand, cess etc. complete as directed by the Engineer-in-charge. | 25.96 | One Cum | 896.5 | ₹23,273.14 |
| 4 | Providing and laying Cement Concrete (1:3:6) using 40 mm size hard granite metal free from weathered skinned and other deleterious materials including hoisting and laying concrete and curing for required days including all labours T&P, cost, conveyance, royalty all applicable and all incidental charges required to complete the work etc. complete as per direction of Engineer-in-charge. | 25.96 | One Cum | 6,850.9 | ₹1,77,849.36 |
| 5 | Providing and laying Cement Concrete (1:2:4) using 12 mm size hard granite chips free from weathered skinned and other deleterious materials including hoisting and laying concrete and curing for required days including all labours T&P, cost, conveyance, royalty, labour cess, all applicable . and all incidental charges required to complete the work etc. complete as per direction of Engineer-in-Charge. | 148.5 | One Cum | 8,535.8 | ₹12,67,566.3 |
| 6 | Providing and laying Cement Cconcrete M-20 with using 20mm and down graded size Crusher broken hard granite chips, sharp sand of approved grading and quality conforming to the specification, mixing by concrete mixer and placing manually on approved surface, vibrating concrete by mechanical means, supplying T&P, curing for specified days by suitable means, supervision charges including mobilization and demobilization with cost of construction and dismantling of gangways and scaffolding, chute with cost, conveyance, labour cess, royalties of all materials, site illumination hire and running charges of machineries required for the work as per approved drawing and specification with all cost incidental to the work etc. complete including labour cess as per the direction of the Engineer-in-Charge | 29 | One Cum | 7,013.2 | ₹2,03,382.8 |
| 7 | Supplying cutting bending binding and placing in position uncoated HYSD bar reinforcement complete as per drawing and technical specification including all labours, cost, conveyance, labour cess, binding wire etc. complete as directed by Engineer-in-charge. | 20.58 | One Qtl | 9,347.7 | ₹1,92,375.67 |
| 8 | Rigid and smooth centering and shuttering for R.C.C works including false works and dismantling them after casting including cost of materials, labour css etc. complete as per direction of Engineer-in-charge. | 453.22 | One Sqm | 1,089.1 | ₹4,93,601.9 |
| 9 | Providing weep holes in abutment and wing wall 8cm to 23cm size including metal spall in layers complete as per direction by Engineer-in-charge. | 84 | One Rmt | 88.7 | ₹7,450.8 |
| 10 | Filling foundation and plinth with excavated earth with watering and compaction including all labour, cess, cost, conveyance etc. complete as directed by the Engineer-in-charge. | 115.04 | One Cum | 116.95 | ₹13,453.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
TechBidJJPR48.pdf
Tender Documents • 2.05 MB
BOQ_596869.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid