Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance ACCEPTED |
Tender Value
Refer Docs
Closing Date
21 Jul 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE/KATPADI
EE/KATPADI
Works Contract for P.K.Puram Section
2025_EB_578108_1
EE2/027/2025-2026
Limited
Electrical Works
Works
P.K.Puram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
29 Jul 2025
4 Jul 2025
22 Jul 2025
4 Jul 2025
21 Jul 2025
4 Jul 2025
Amount
Excavation, Erection for 9mtr pole.
Excavation, Erection for 8mtr pole.
Fixing of Guarding X arm
Fixing of V X arm
Fixing of Tapping Channel
Fixing of 3Ph X arm
Fixing of HT TI Fitting
Fixing of 11kv pin insulator
Fixing of 11KV disc insulator
Fixing of LT Pin insulator
Fixing of LT Shackle with m/p
Fixing of Aluminium knob
Excavation and Erection of stay set complete.
Erection of Single pole structure along with poles and Structure materials and including erection of DT.
Stringing of ACSR 7/4.09MM size of conductor (circuit length as mentioned in sanction copy)
Stringing of 7/3.35 ACSR/ 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy)
Stringing of 7/2.59 ACSR/ 7/2.50 AAAC size of conductor (circuit length as mentioned in sanction copy)
Erection of Distribution Transformer (16-100kva)
Loading & unloading of line materials
Loading & unloading of DT
Transportation of all type of pole upto 5km
Transportation of all type of pole above 5km (add 10x75 km)
Transportation of line materials
Transportation of DT
Releasing and resagging of conductor 7/2.50
Releasing and resagging of conductor 7/4.09
Pole concreting
Pole Earthing
Dismantling of X arms
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit.
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .