| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹140.7 CrAccepted-AOC 401 501 HARSH ANAND YEOLEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | L1 | Accepted-AOC Accepted Bid | |
| 2 | L2₹150.7 Cr+₹6.7 Cr (4.66%)Rejected-Finance 401 402 AMIT CRYSTAL ABOVE BANK OF BARODA SENAPATI BAPAT ROAD PUNE 411016 SHIVAJI NAGAR PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | L2 | Rejected-Finance Due to High Rates | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Qualified |
Tender Value
₹126.6 Cr
EMD Value
₹63.3 L
Closing Date
12 Nov 2021, 5:00 pmClosed
Executive Engineer, Public Works Division, Nashik
Executive Engineer Public Works Division Nashik Bhandkam Bhawan Trimbak Road Nashik Tal. Dist. Nashik Tel. No.- 0253-2583761-64 2575324
Construction of New District Court Building at Nashik (Civil and Electrical) Tal.Dist. Nashik
2021_PWR_718451_1
E-Tender Notice No.24 for 2021-22 (Item Rates)
Open Tender
Civil Works
Item Rate
730 days
Tal.Dist. Nashik
As Per NIT
10 documents required · 10 mandatory
₹5,900
₹63.3 L
The Chief Engineer, P. W. Region, Nashik
7 Mar 2022
6 Sept 2021
15 Nov 2021
6 Sept 2021
12 Nov 2021
6 Sept 2021
6 Oct 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Cutting down trees including trunks and branches with girths above 60 centimetre to 90 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression / pit if any. | |||||
| 2Cutting down trees including trunks and branches with girths above 90 centimetre to 180 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre as directed and earth filling in the depression / pit if any. | |||||
| 3Cutting down trees including trunks and branches with girths above 180 centimetre to 270 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre. as directed and earth filling in the depression/pit if any. | |||||
| 4Cutting down trees including trunks and branches with girths above 270 centimetre to 450 centimetre and stacking the materials neatly with all lifts and lead of 1000metre. as directed and earth filling in the depression/pit if any. | |||||
| 5Cutting down trees including trunks and branches with girths above 450 centimetre and stacking the materials neatly with all lifts and lead of 1000 metre. as directed and earth filling in the depression/pit if any. | |||||
| 6Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 millimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 millimetre in thickness. | |||||
| 7 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete by mechanical means. | 1 | Cubic Metre | - | - |
| 8 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete by mechanical means. . | 1 | Cubic Metre | - | - |
| 9 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete by mechanical means. | 1 | Cubic Metre | - | - |
| 10 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete by mechanical means. | 1 | Cubic Metre | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1240139.xls
BOQ Document • 1.33 MB
83078933.pdf
Tender Document • 2.27 MB
PDF2401.pdf
Tender Document • 22.63 MB
83078935.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .