Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15,720
Closing Date
27 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP Veppur BLock
BDO BP Veppur BLock Perambalur
Construction of Single Class Room Building PUM School Vayalapadi Panchayat in Veppur Block in Perambalur District Package No.TN11-01
2024_RDTN_428382_1
259/2022/A2 15.02.2024
Open Tender
Civil Works
Works
180 days
BDO BP Veppur BLock
As Per tender Documents
3 documents required · 3 mandatory
₹0
₹15,720
Yes
28 Feb 2024
21 Feb 2024
27 Feb 2024
21 Feb 2024
27 Feb 2024
21 Feb 2024
Amount
Earth work excavating and depositing on bank with initial lead and lift of 10m & initial lift of 2m in all Classes of soils as per SS 20B for foundation etc complete.
Filling with M Sand including cost and conveyance of all materials to site and all labour charges etc., complete
Foundation concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and all labours etc., complete
R.C.C.1:11/2:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and erecting steel centering for all sides and soffits including supports and struts to 3.29 m height including all charges etc., Coloumn
Supplying and erecting steel centering for all sides and soffits including supports and struts to 3.29 m height including all charges etc., Below GL
Supplying and erecting steel centering for all sides and soffits including supports and struts to 3.29 m height including all charges etc., Above GL
Brick work in cm1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc., complete
Supplying and fabrication of steel for RCC items including cost and conveyance of steel to work site and all labour for fabrication charges etc., complete
Plastering 1:5 in mix using 12mm thick including cost and conveyance of all materials to site and all labour charges
Plastering 1:3 in mix using 10mm thick including cost and conveyance of all materials to site and all labour charges
Paving the Floor with Scratch Proof ceromic Tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete.
Brick Jelly lime Concrete using 20mm brick Jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete.
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over RCC roof slab in Proportion of 32:12.5 and finshed with one course of Pressed tiles of size 23x23x2cm With cement mortor 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete.
Distempering two coats using Oil Paint including scrabbing, Priming over the old surface including cost and conveyance of all materials to site and all labour charges etc., complete.
Painting two Coats with exterior emulsion paint over wall surface, including scrabbing and all labour charges etc., complete.
Painting two coats of new iron work such as doors, windows etc., with best approved first quality of synthetic enamal paint of approved colour over the existing priming co
SS Hand Rail including cost and conveyance of all materials to site and all labour charges
BaLA Painting including cost and conveyance of all materials to site and all labour charges
Provision Steel door 1.20x2.10
Provision for Cost and supply of Steel Window 1.20x1.30
Provision for Cost and supply of Steel Window 1.50x1.30
Provision for Electrical Arrangements Light Point PVC Light point. (SD 24)
Fan point (for electronic regulator) SD 24
Ceiling Fan (SD 110)
CFL Bulb 11W CFL (SD83)
Name Board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KATHIRAVAN R
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .