| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC Lowest rate |
| 2 | L2₹8.6 LRejected-Finance | ₹8.6 L | L2 | Rejected-Finance Highest rate |
| Sl No | Description | Qty | Unit | M MOHAMMED HAKKIM L2 | S.NAVANEETHAKRISHNAN L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows filled up the earth well rammed and leveled of and the entire work completed in all respect. | 338.04 | One Square metre | 7.5 ₹2,535.30 | 6.3 ₹2,129.65 |
| 2.00 | Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 70.43 | One cubic metre | 365 ₹25,706.95 | 340.8 ₹24,002.54 |
| 3.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 146.72 | One cubic metre | 2,480 ₹3.6 L | 2,395.2 ₹3.5 L |
| 4.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,173.75 | One Square metre | 90 ₹1.1 L | 86.7 ₹1.0 L |
| 5.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,173.75 | One Square metre | 25 ₹29,343.75 | 20.3 ₹23,827.13 |
| 6.00 | Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 29.34 | One cubic metre | 11,450 ₹3.4 L | 11,375.5 ₹3.3 L |
| 7.00 | Provision for HM stones | 1 | One Number | 600 ₹600 | 574.5 ₹574.50 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
30 Dec 2025, 3:00 pmClosed
Commissioner, Panchayat Union, Vallioor
Panchayat Union Office, Vallioor
Providing BT road at Vinayagapuram to Renganathapuram road in Veppilankulam Village Panchayat, Valliyoor Panchayat Union.
2025_RDTN_635900_6
GF 2025-26 - 8
Open Tender
Civil Works
Veppilankulam panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
3 Mar 2026
24 Dec 2025
30 Dec 2025
24 Dec 2025
30 Dec 2025
24 Dec 2025
Amount
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows filled up the earth well rammed and leveled of and the entire work completed in all respect.
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for HM stones
M MOHAMMED HAKKIM (BID ID -1549934)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_761187.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_761187.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid