| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance | ₹1.2 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.2 Cr+₹22,859 (0.19%)Rejected-Finance NO 9 R C COMPLEX KUMBAKONAM SALAI PANRUTI TK | CUDDALORE | TAMIL NADU | 605007 | ₹1.2 Cr+₹22,859 (0.19%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ARUL CONSTRUCTIONS H2 | S P CONSTRUCTION H1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Road from NH 45-A.Mazhavarayanur Road Km:0/0-2/900 | |||||
| 1.01 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 6,960 | Sqm | 4.74 ₹32,990.4 Lowest | 6.34 ₹44,126.4 |
| 1.02 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 4,350 | Cum | 130.19 ₹5,66,326.5 Lowest | 131.25 ₹5,70,937.5 |
| 1.03 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 3,625 | Sqm | 21.84 ₹79,170 Lowest | 22.84 ₹82,795 |
| 1.04Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 1.05 | Km 0/0-1/0 | 562.5 | Cum | 636.46 ₹3,58,008.75 Lowest | 636.46 ₹3,58,008.75 Lowest |
| 1.06 | Km 1/0-2/0 | 562.5 | Cum | 646.52 ₹3,63,667.5 Lowest | 646.52 ₹3,63,667.5 Lowest |
| 1.07 | Km 2/0-2/900 | 506.25 | Cum | 656.57 ₹3,32,388.56 Lowest | 656.57 ₹3,32,388.56 Lowest |
| 1.08Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.09 | Km 0/0-1/0 | 468.75 | Cum | 2,291.51 ₹10,74,145.31 Lowest | 2,291.51 ₹10,74,145.31 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
1 Jul 2025, 3:00 pmClosed
Project Director
DRDA, Kallakurichi
Strengthening of NH45 to A.Mazhavarayanur Road in Ulundurpet Block in Kallakurichi District
2025_RDTN_570341_1
B7/0126/2025/004
Open Tender
Civil Works - Roads
Item Rate
180 days
Kallakurichi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.3 L
DRDA, Kallakurichi
25 Sept 2025
18 Jun 2025
1 Jul 2025
18 Jun 2025
1 Jul 2025
18 Jun 2025
23 Jun 2025
Amount
Strengthening of Road from NH 45-A.Mazhavarayanur Road Km:0/0-2/900
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic (6%) for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and Fixing of HM Stones
Supply and Fixing of KM Stones
Cost for documentation of Photograpic Charges
Routine Maintenance of above road for 5 years
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARUL CONSTRUCTIONS (BID ID -1385200)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .